blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2889086

EP2889086 - A device for collecting and testing analyte in a liquid sample [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  27.04.2018
Database last updated on 03.06.2024
FormerThe patent has been granted
Status updated on  19.05.2017
FormerGrant of patent is intended
Status updated on  01.01.2017
FormerExamination is in progress
Status updated on  04.11.2016
Most recent event   Tooltip17.07.2020Lapse of the patent in a contracting state
New state(s): AL
published on 19.08.2020  [2020/34]
Applicant(s)For all designated states
Hangzhou Ditu Technology Co., Ltd.
No. 266, Tongren Road
Binjiang District
Hangzhou Zhejiang 310052 / CN
[2015/27]
Inventor(s)01 / Dai, Jielin
c/o Hangzhou Ditu Technology Co., Ltd.
No. 266, Tongren Road
Binjiang District
310052 Hangzhou Zheijang / CN
 [2017/27]
Former [2015/27]01 / Dai, Jielin
c/o Hangzhou Ditu Technology Co., Ltd.
No. 266, Tongren Road
Binjiang District
310052 Hangzhou / CN
Representative(s)Osha BWB
2, rue de la Paix
75002 Paris / FR
[N/P]
Former [2015/27]Osha Liang
2, rue de la Paix
75002 Paris / FR
Application number, filing date14200592.530.12.2014
[2015/27]
Priority number, dateCN201320894525U31.12.2013         Original published format: CN 201320894525 U
CN20131075500231.12.2013         Original published format: CN201310755002
[2015/27]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2889086
Date:01.07.2015
Language:EN
[2015/27]
Type: B1 Patent specification 
No.:EP2889086
Date:21.06.2017
Language:EN
[2017/25]
Search report(s)(Supplementary) European search report - dispatched on:EP26.05.2015
ClassificationIPC:B01L3/00, A61B10/00, G01N35/10
[2015/27]
CPC:
B01L3/502 (EP,US); A61B10/0045 (EP,US); A61B10/0051 (EP,US);
A61B10/007 (EP,US); A61B2010/0006 (EP,US); A61B2010/0009 (EP,US);
B01L2200/026 (EP,US); B01L2200/0605 (EP,US); B01L2200/14 (EP,US);
B01L2300/044 (EP,US); B01L2300/0672 (EP,US); B01L2300/0832 (EP,US);
B01L2300/087 (EP,US); B01L2300/123 (EP,US); B01L2400/0478 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/08]
Former [2015/27]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Vorrichtung zum Entnehmen und Testen eines Analyts in einer Flüssigprobe[2015/27]
English:A device for collecting and testing analyte in a liquid sample[2015/27]
French:Dispositif de collecte et de test d'analyte dans un échantillon liquide[2015/27]
Examination procedure04.01.2016Amendment by applicant (claims and/or description)
04.01.2016Examination requested  [2016/08]
08.11.2016Despatch of a communication from the examining division (Time limit: M04)
21.11.2016Reply to a communication from the examining division
02.01.2017Communication of intention to grant the patent
11.05.2017Fee for grant paid
11.05.2017Fee for publishing/printing paid
11.05.2017Receipt of the translation of the claim(s)
Opposition(s)22.03.2018No opposition filed within time limit [2018/22]
Fees paidRenewal fee
27.12.2016Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU30.12.2014
AL21.06.2017
AT21.06.2017
CY21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
HR21.06.2017
IT21.06.2017
LT21.06.2017
LV21.06.2017
MC21.06.2017
MK21.06.2017
NL21.06.2017
PL21.06.2017
PT21.06.2017
RO21.06.2017
RS21.06.2017
SE21.06.2017
SI21.06.2017
SK21.06.2017
SM21.06.2017
TR21.06.2017
BG21.09.2017
NO21.09.2017
GR22.09.2017
IS21.10.2017
IE30.12.2017
LU30.12.2017
MT30.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
FR02.01.2018
[2020/34]
Former [2020/28]HU30.12.2014
AT21.06.2017
CY21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
HR21.06.2017
IT21.06.2017
LT21.06.2017
LV21.06.2017
MC21.06.2017
MK21.06.2017
NL21.06.2017
PL21.06.2017
PT21.06.2017
RO21.06.2017
RS21.06.2017
SE21.06.2017
SI21.06.2017
SK21.06.2017
SM21.06.2017
TR21.06.2017
BG21.09.2017
NO21.09.2017
GR22.09.2017
IS21.10.2017
IE30.12.2017
LU30.12.2017
MT30.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
FR02.01.2018
Former [2020/15]HU30.12.2014
AT21.06.2017
CY21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
HR21.06.2017
IT21.06.2017
LT21.06.2017
LV21.06.2017
MC21.06.2017
MK21.06.2017
NL21.06.2017
PL21.06.2017
RO21.06.2017
RS21.06.2017
SE21.06.2017
SI21.06.2017
SK21.06.2017
SM21.06.2017
TR21.06.2017
BG21.09.2017
NO21.09.2017
GR22.09.2017
IS21.10.2017
IE30.12.2017
LU30.12.2017
MT30.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
FR02.01.2018
Former [2019/52]HU30.12.2014
AT21.06.2017
CY21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
HR21.06.2017
IT21.06.2017
LT21.06.2017
LV21.06.2017
MC21.06.2017
MK21.06.2017
NL21.06.2017
PL21.06.2017
RO21.06.2017
RS21.06.2017
SE21.06.2017
SI21.06.2017
SK21.06.2017
SM21.06.2017
BG21.09.2017
NO21.09.2017
GR22.09.2017
IS21.10.2017
IE30.12.2017
LU30.12.2017
MT30.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
FR02.01.2018
Former [2019/47]HU30.12.2014
AT21.06.2017
CY21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
HR21.06.2017
IT21.06.2017
LT21.06.2017
LV21.06.2017
MC21.06.2017
NL21.06.2017
PL21.06.2017
RO21.06.2017
RS21.06.2017
SE21.06.2017
SI21.06.2017
SK21.06.2017
SM21.06.2017
BG21.09.2017
NO21.09.2017
GR22.09.2017
IS21.10.2017
IE30.12.2017
LU30.12.2017
MT30.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
FR02.01.2018
Former [2019/31]HU30.12.2014
AT21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
HR21.06.2017
IT21.06.2017
LT21.06.2017
LV21.06.2017
MC21.06.2017
NL21.06.2017
PL21.06.2017
RO21.06.2017
RS21.06.2017
SE21.06.2017
SI21.06.2017
SK21.06.2017
SM21.06.2017
BG21.09.2017
NO21.09.2017
GR22.09.2017
IS21.10.2017
IE30.12.2017
LU30.12.2017
MT30.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
FR02.01.2018
Former [2019/30]AT21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
HR21.06.2017
IT21.06.2017
LT21.06.2017
LV21.06.2017
MC21.06.2017
NL21.06.2017
PL21.06.2017
RO21.06.2017
RS21.06.2017
SE21.06.2017
SI21.06.2017
SK21.06.2017
SM21.06.2017
BG21.09.2017
NO21.09.2017
GR22.09.2017
IS21.10.2017
IE30.12.2017
LU30.12.2017
MT30.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
FR02.01.2018
Former [2018/52]AT21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
HR21.06.2017
IT21.06.2017
LT21.06.2017
LV21.06.2017
NL21.06.2017
PL21.06.2017
RO21.06.2017
RS21.06.2017
SE21.06.2017
SI21.06.2017
SK21.06.2017
SM21.06.2017
BG21.09.2017
NO21.09.2017
GR22.09.2017
IS21.10.2017
IE30.12.2017
LU30.12.2017
MT30.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
FR02.01.2018
Former [2018/49]AT21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
HR21.06.2017
IT21.06.2017
LT21.06.2017
LV21.06.2017
NL21.06.2017
PL21.06.2017
RO21.06.2017
RS21.06.2017
SE21.06.2017
SI21.06.2017
SK21.06.2017
SM21.06.2017
BG21.09.2017
NO21.09.2017
GR22.09.2017
IS21.10.2017
IE30.12.2017
LU30.12.2017
MT30.12.2017
BE31.12.2017
FR02.01.2018
Former [2018/45]AT21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
HR21.06.2017
IT21.06.2017
LT21.06.2017
LV21.06.2017
NL21.06.2017
PL21.06.2017
RO21.06.2017
RS21.06.2017
SE21.06.2017
SI21.06.2017
SK21.06.2017
SM21.06.2017
BG21.09.2017
NO21.09.2017
GR22.09.2017
IS21.10.2017
IE30.12.2017
LU30.12.2017
MT30.12.2017
Former [2018/43]AT21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
HR21.06.2017
IT21.06.2017
LT21.06.2017
LV21.06.2017
NL21.06.2017
PL21.06.2017
RO21.06.2017
RS21.06.2017
SE21.06.2017
SI21.06.2017
SK21.06.2017
SM21.06.2017
BG21.09.2017
NO21.09.2017
GR22.09.2017
IS21.10.2017
LU30.12.2017
MT30.12.2017
Former [2018/40]AT21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
HR21.06.2017
IT21.06.2017
LT21.06.2017
LV21.06.2017
NL21.06.2017
PL21.06.2017
RO21.06.2017
RS21.06.2017
SE21.06.2017
SI21.06.2017
SK21.06.2017
SM21.06.2017
BG21.09.2017
NO21.09.2017
GR22.09.2017
IS21.10.2017
Former [2018/21]AT21.06.2017
CZ21.06.2017
DK21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
HR21.06.2017
IT21.06.2017
LT21.06.2017
LV21.06.2017
NL21.06.2017
PL21.06.2017
RO21.06.2017
RS21.06.2017
SE21.06.2017
SK21.06.2017
SM21.06.2017
BG21.09.2017
NO21.09.2017
GR22.09.2017
IS21.10.2017
Former [2018/11]AT21.06.2017
CZ21.06.2017
EE21.06.2017
ES21.06.2017
FI21.06.2017
HR21.06.2017
IT21.06.2017
LT21.06.2017
LV21.06.2017
NL21.06.2017
PL21.06.2017
RO21.06.2017
RS21.06.2017
SE21.06.2017
SK21.06.2017
SM21.06.2017
BG21.09.2017
NO21.09.2017
GR22.09.2017
IS21.10.2017
Former [2018/10]AT21.06.2017
CZ21.06.2017
EE21.06.2017
FI21.06.2017
HR21.06.2017
LT21.06.2017
LV21.06.2017
NL21.06.2017
RO21.06.2017
RS21.06.2017
SE21.06.2017
SK21.06.2017
BG21.09.2017
NO21.09.2017
GR22.09.2017
Former [2018/09]EE21.06.2017
FI21.06.2017
HR21.06.2017
LT21.06.2017
LV21.06.2017
NL21.06.2017
RS21.06.2017
SE21.06.2017
BG21.09.2017
NO21.09.2017
GR22.09.2017
Former [2017/52]FI21.06.2017
HR21.06.2017
LT21.06.2017
LV21.06.2017
NL21.06.2017
RS21.06.2017
SE21.06.2017
BG21.09.2017
NO21.09.2017
GR22.09.2017
Former [2017/50]FI21.06.2017
HR21.06.2017
LT21.06.2017
LV21.06.2017
RS21.06.2017
SE21.06.2017
BG21.09.2017
NO21.09.2017
GR22.09.2017
Former [2017/49]FI21.06.2017
HR21.06.2017
LT21.06.2017
NO21.09.2017
GR22.09.2017
Documents cited:Search[XI]US2013045501  (HU LIN [CN], et al) [X] 1-5,7-14 * paragraphs [0005] - [0007] - [0037] - [0043]; figures 1-9 * [I] 6,15;
 [X]WO2005023426  (OAKVILLE TRADING HONG KONG LTD [CN], et al) [X] 1-15 * page 12, line 15 - page 19, line 6; figures 1-10 *;
 [A]US3739941  (OSTRWOSKY E, et al) [A] 15 * column 4, lines 1-60; figures 1-4 *;
 [A]US3422996  (LIPMAN ELMER) [A] 15 * column 3, lines 15-37; figures 1,2 *
by applicantUS6576193
 US7270959
 US5252496
 US5415994
 US5559041
 US5602040
 US5656503
 US5712170
 US5877028
 US5965458
 US6046058
 US6136610
 US6140136
 US6183972
 US6187268
 US6187598
 US6194221
 US6194224
 US6221678
 US6228660
 US6241689
 US6248598
 US6271046
 US6297020
 US6316205
 US6372514
 US7270958
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.