blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3001702

EP3001702 - Support of mobile-terminated application services in a mobile system [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  31.12.2021
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  22.01.2021
FormerGrant of patent is intended
Status updated on  01.10.2020
FormerExamination is in progress
Status updated on  16.11.2018
FormerRequest for examination was made
Status updated on  09.11.2016
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024  [2024/41]
Applicant(s)For all designated states
Alcatel Lucent
Site Nokia Paris Saclay
Route de Villejust
91620 Nozay / FR
[2018/16]
Former [2016/13]For all designated states
ALCATEL LUCENT
148/152 route de la Reine
92100 Boulogne-Billancourt / FR
Inventor(s)01 / Thiebaut, Laurent
Alcatel-Lucent France
Route de Villejust
91620 Nozay / FR
02 / Dolan, Michael Francis
Alcatel-Lucent USA Inc.
FWC 9B2 THRU 9H2
1960 LUCENT LN
Naperville, IL Illinois 60563-1594 / US
03 / Elloumi, Omar
Alcatel-Lucent International
Centre de Villarceaux
Route de Villejust
91620 Nozay / FR
 [2016/13]
Representative(s)Nokia EPO representatives
Nokia Technologies Oy
Karakaari 7
02610 Espoo / FI
[2021/08]
Former [2016/13]El Manouni, Josiane
Alcatel-Lucent International
148/152 route de la Reine
92100 Boulogne Billancourt / FR
Application number, filing date14306497.026.09.2014
[2016/13]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3001702
Date:30.03.2016
Language:EN
[2016/13]
Type: B1 Patent specification 
No.:EP3001702
Date:24.02.2021
Language:EN
[2021/08]
Search report(s)(Supplementary) European search report - dispatched on:EP12.03.2015
ClassificationIPC:H04W4/50, H04W4/70, H04W76/19
[2020/42]
CPC:
H04W4/50 (EP,CN,US); H04W4/70 (EP,US); H04W60/04 (US);
H04W76/19 (EP,US); H04W8/10 (US); H04W8/18 (US)
Former IPC [2016/13]H04W4/00, H04W76/02
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/45]
Former [2016/13]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Unterstützung einer per Mobilfunk abgeschlossenen Dienstbereitstellung von Anwendungsdiensten in einem Mobilsystem[2016/13]
English:Support of mobile-terminated application services in a mobile system[2016/13]
French:Support de services mobiles d'applications terminées dans un système portable[2016/13]
Examination procedure30.09.2016Examination requested  [2016/45]
19.01.2017Amendment by applicant (claims and/or description)
19.11.2018Despatch of a communication from the examining division (Time limit: M06)
26.06.2019Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
03.09.2019Reply to a communication from the examining division
04.11.2019Despatch of a communication from the examining division (Time limit: M06)
04.05.2020Reply to a communication from the examining division
02.10.2020Communication of intention to grant the patent
19.01.2021Fee for grant paid
19.01.2021Fee for publishing/printing paid
19.01.2021Receipt of the translation of the claim(s)
Opposition(s)25.11.2021No opposition filed within time limit [2022/05]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
03.09.2019Request for further processing filed
03.09.2019Full payment received (date of receipt of payment)
Request granted
11.09.2019Decision despatched
The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report
19.01.2017Request for further processing filed
19.01.2017Full payment received (date of receipt of payment)
Request granted
03.02.2017Decision despatched
Fees paidRenewal fee
22.09.2016Renewal fee patent year 03
26.09.2017Renewal fee patent year 04
25.09.2018Renewal fee patent year 05
13.09.2019Renewal fee patent year 06
14.09.2020Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU26.09.2014
AL24.02.2021
AT24.02.2021
CY24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
MK24.02.2021
MT24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
TR24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
IE26.09.2021
LU26.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
[2024/41]
Former [2024/29]HU26.09.2014
AL24.02.2021
AT24.02.2021
CY24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
MK24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
TR24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
IE26.09.2021
LU26.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
Former [2024/22]HU26.09.2014
AL24.02.2021
AT24.02.2021
CY24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
MK24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
IE26.09.2021
LU26.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
Former [2023/30]HU26.09.2014
AL24.02.2021
AT24.02.2021
CY24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
IE26.09.2021
LU26.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
Former [2023/27]HU26.09.2014
AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
IE26.09.2021
LU26.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
Former [2022/37]AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
IE26.09.2021
LU26.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
Former [2022/35]AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
IE26.09.2021
LU26.09.2021
BE30.09.2021
Former [2022/34]AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
LU26.09.2021
BE30.09.2021
Former [2022/25]AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2022/23]AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2022/13]AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
PT24.06.2021
Former [2022/10]AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
PT24.06.2021
Former [2022/07]AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/51]AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/50]AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/49]AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RS24.02.2021
SE24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/48]AT24.02.2021
CZ24.02.2021
EE24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RS24.02.2021
SE24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/46]AT24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RS24.02.2021
SE24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/42]FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RS24.02.2021
SE24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/39]FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RS24.02.2021
SE24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
PT24.06.2021
Former [2021/38]FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
RS24.02.2021
SE24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
PT24.06.2021
Former [2021/37]FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
RS24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
PT24.06.2021
Former [2021/36]FI24.02.2021
HR24.02.2021
LT24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
PT24.06.2021
Former [2021/35]FI24.02.2021
HR24.02.2021
LT24.02.2021
NO24.05.2021
PT24.06.2021
Former [2021/33]FI24.02.2021
LT24.02.2021
NO24.05.2021
PT24.06.2021
Documents cited:Search[X]US2014050160  (ROENNEKE HANS [SE], et al) [X] 1-20 * abstract * * paragraph [0001] - paragraph [0197] * * figures 1-9 *;
 [X]  - ALCATEL-LUCENT, "Pseudo-CR on Avoiding multiple reattachments to EPC", 3GPP DRAFT; C4-110056, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20110114), vol. CT WG4, no. Ljubljana; 20110124, XP050475629 [X] 1-20 * abstract * * section 6.1.1 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.