EP3001702 - Support of mobile-terminated application services in a mobile system [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 31.12.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 22.01.2021 | ||
Former | Grant of patent is intended Status updated on 01.10.2020 | ||
Former | Examination is in progress Status updated on 16.11.2018 | ||
Former | Request for examination was made Status updated on 09.11.2016 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Alcatel Lucent Site Nokia Paris Saclay Route de Villejust 91620 Nozay / FR | [2018/16] |
Former [2016/13] | For all designated states ALCATEL LUCENT 148/152 route de la Reine 92100 Boulogne-Billancourt / FR | Inventor(s) | 01 /
Thiebaut, Laurent Alcatel-Lucent France Route de Villejust 91620 Nozay / FR | 02 /
Dolan, Michael Francis Alcatel-Lucent USA Inc. FWC 9B2 THRU 9H2 1960 LUCENT LN Naperville, IL Illinois 60563-1594 / US | 03 /
Elloumi, Omar Alcatel-Lucent International Centre de Villarceaux Route de Villejust 91620 Nozay / FR | [2016/13] | Representative(s) | Nokia EPO representatives Nokia Technologies Oy Karakaari 7 02610 Espoo / FI | [2021/08] |
Former [2016/13] | El Manouni, Josiane Alcatel-Lucent International 148/152 route de la Reine 92100 Boulogne Billancourt / FR | Application number, filing date | 14306497.0 | 26.09.2014 | [2016/13] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3001702 | Date: | 30.03.2016 | Language: | EN | [2016/13] | Type: | B1 Patent specification | No.: | EP3001702 | Date: | 24.02.2021 | Language: | EN | [2021/08] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 12.03.2015 | Classification | IPC: | H04W4/50, H04W4/70, H04W76/19 | [2020/42] | CPC: |
H04W4/50 (EP,CN,US);
H04W4/70 (EP,US);
H04W60/04 (US);
H04W76/19 (EP,US);
H04W8/10 (US);
H04W8/18 (US)
|
Former IPC [2016/13] | H04W4/00, H04W76/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/45] |
Former [2016/13] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Unterstützung einer per Mobilfunk abgeschlossenen Dienstbereitstellung von Anwendungsdiensten in einem Mobilsystem | [2016/13] | English: | Support of mobile-terminated application services in a mobile system | [2016/13] | French: | Support de services mobiles d'applications terminées dans un système portable | [2016/13] | Examination procedure | 30.09.2016 | Examination requested [2016/45] | 19.01.2017 | Amendment by applicant (claims and/or description) | 19.11.2018 | Despatch of a communication from the examining division (Time limit: M06) | 26.06.2019 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 03.09.2019 | Reply to a communication from the examining division | 04.11.2019 | Despatch of a communication from the examining division (Time limit: M06) | 04.05.2020 | Reply to a communication from the examining division | 02.10.2020 | Communication of intention to grant the patent | 19.01.2021 | Fee for grant paid | 19.01.2021 | Fee for publishing/printing paid | 19.01.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 25.11.2021 | No opposition filed within time limit [2022/05] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 03.09.2019 | Request for further processing filed | 03.09.2019 | Full payment received (date of receipt of payment) Request granted | 11.09.2019 | Decision despatched | The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report | 19.01.2017 | Request for further processing filed | 19.01.2017 | Full payment received (date of receipt of payment) Request granted | 03.02.2017 | Decision despatched | Fees paid | Renewal fee | 22.09.2016 | Renewal fee patent year 03 | 26.09.2017 | Renewal fee patent year 04 | 25.09.2018 | Renewal fee patent year 05 | 13.09.2019 | Renewal fee patent year 06 | 14.09.2020 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.09.2014 | AL | 24.02.2021 | AT | 24.02.2021 | CY | 24.02.2021 | CZ | 24.02.2021 | DK | 24.02.2021 | EE | 24.02.2021 | ES | 24.02.2021 | FI | 24.02.2021 | HR | 24.02.2021 | IT | 24.02.2021 | LT | 24.02.2021 | LV | 24.02.2021 | MC | 24.02.2021 | MK | 24.02.2021 | MT | 24.02.2021 | NL | 24.02.2021 | PL | 24.02.2021 | RO | 24.02.2021 | RS | 24.02.2021 | SE | 24.02.2021 | SI | 24.02.2021 | SK | 24.02.2021 | SM | 24.02.2021 | TR | 24.02.2021 | BG | 24.05.2021 | NO | 24.05.2021 | GR | 25.05.2021 | IS | 24.06.2021 | PT | 24.06.2021 | IE | 26.09.2021 | LU | 26.09.2021 | BE | 30.09.2021 | CH | 30.09.2021 | LI | 30.09.2021 | [2024/41] |
Former [2024/29] | HU | 26.09.2014 | |
AL | 24.02.2021 | ||
AT | 24.02.2021 | ||
CY | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
MK | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
TR | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
IE | 26.09.2021 | ||
LU | 26.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2024/22] | HU | 26.09.2014 | |
AL | 24.02.2021 | ||
AT | 24.02.2021 | ||
CY | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
MK | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
IE | 26.09.2021 | ||
LU | 26.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2023/30] | HU | 26.09.2014 | |
AL | 24.02.2021 | ||
AT | 24.02.2021 | ||
CY | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
IE | 26.09.2021 | ||
LU | 26.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2023/27] | HU | 26.09.2014 | |
AL | 24.02.2021 | ||
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
IE | 26.09.2021 | ||
LU | 26.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/37] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
IE | 26.09.2021 | ||
LU | 26.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/35] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
IE | 26.09.2021 | ||
LU | 26.09.2021 | ||
BE | 30.09.2021 | ||
Former [2022/34] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
LU | 26.09.2021 | ||
BE | 30.09.2021 | ||
Former [2022/25] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2022/23] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2022/13] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2022/10] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2022/07] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/51] | AT | 24.02.2021 | |
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/50] | AT | 24.02.2021 | |
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/49] | AT | 24.02.2021 | |
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/48] | AT | 24.02.2021 | |
CZ | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/46] | AT | 24.02.2021 | |
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/42] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/39] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/38] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/37] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
RS | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/36] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/35] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
NO | 24.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/33] | FI | 24.02.2021 | |
LT | 24.02.2021 | ||
NO | 24.05.2021 | ||
PT | 24.06.2021 | Documents cited: | Search | [X]US2014050160 (ROENNEKE HANS [SE], et al) [X] 1-20 * abstract * * paragraph [0001] - paragraph [0197] * * figures 1-9 *; | [X] - ALCATEL-LUCENT, "Pseudo-CR on Avoiding multiple reattachments to EPC", 3GPP DRAFT; C4-110056, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20110114), vol. CT WG4, no. Ljubljana; 20110124, XP050475629 [X] 1-20 * abstract * * section 6.1.1 * |