blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2962289

EP2962289 - SYSTEM AND METHOD FOR EMERGENCY COMMUNICATION IN A TCP/IP BASED REDUNDANT FIRE PANEL NETWORK [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  27.08.2021
Database last updated on 26.07.2024
FormerThe patent has been granted
Status updated on  18.09.2020
FormerGrant of patent is intended
Status updated on  18.05.2020
FormerExamination is in progress
Status updated on  25.03.2019
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
TOTAL WALTHER GmbH, Feuerschutz und Sicherheit
Waltherstrasse 51
51069 Köln / DE
[2016/01]
Inventor(s)01 / BRENNER, Andreas
Marchwartweg 27
85635 Hohenkirchen / DE
 [2016/01]
Representative(s)Grünecker Patent- und Rechtsanwälte PartG mbB
Leopoldstraße 4
80802 München / DE
[2016/01]
Application number, filing date14700881.716.01.2014
[2016/01]
WO2014EP50840
Priority number, dateUS20131377856627.02.2013         Original published format: US201313778566
[2016/01]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2014131544
Date:04.09.2014
Language:EN
[2014/36]
Type: A1 Application with search report 
No.:EP2962289
Date:06.01.2016
Language:EN
The application published by WIPO in one of the EPO official languages on 04.09.2014 takes the place of the publication of the European patent application.
[2016/01]
Type: B1 Patent specification 
No.:EP2962289
Date:21.10.2020
Language:EN
[2020/43]
Search report(s)International search report - published on:EP04.09.2014
ClassificationIPC:G08B25/04, G08B25/00, // G08B17/00
[2020/17]
CPC:
G08B25/004 (EP,US); G08B25/00 (US); G08B25/04 (EP,US);
G08B17/00 (EP,US)
Former IPC [2016/01]G08B25/04, G08B17/00, G08B25/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/01]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:SYSTEM UND VERFAHREN ZUR NOTFALLBASIERTEN KOMMUNIKATION IN EINEM TCP/IP-BASIERTEN REDUNDANTEN BRANDMELDENETZWERK[2016/01]
English:SYSTEM AND METHOD FOR EMERGENCY COMMUNICATION IN A TCP/IP BASED REDUNDANT FIRE PANEL NETWORK[2016/01]
French:SYSTÈME ET PROCÉDÉ DE COMMUNICATIONS D'URGENCE DANS UN RÉSEAU DE TABLEAUX D'INCENDIE REDONDANTS BASÉ SUR TCP/IP[2016/01]
Entry into regional phase24.09.2015National basic fee paid 
24.09.2015Designation fee(s) paid 
24.09.2015Examination fee paid 
Examination procedure24.09.2015Examination requested  [2016/01]
18.04.2016Amendment by applicant (claims and/or description)
28.03.2019Despatch of a communication from the examining division (Time limit: M04)
07.08.2019Reply to a communication from the examining division
19.05.2020Communication of intention to grant the patent
15.09.2020Fee for grant paid
15.09.2020Fee for publishing/printing paid
15.09.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  28.03.2019
Opposition(s)22.07.2021No opposition filed within time limit [2021/39]
Fees paidRenewal fee
27.01.2016Renewal fee patent year 03
27.01.2017Renewal fee patent year 04
29.01.2018Renewal fee patent year 05
28.01.2019Renewal fee patent year 06
27.01.2020Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU16.01.2014
AL21.10.2020
AT21.10.2020
CY21.10.2020
CZ21.10.2020
DK21.10.2020
EE21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
IT21.10.2020
LT21.10.2020
LV21.10.2020
MC21.10.2020
MK21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SI21.10.2020
SK21.10.2020
SM21.10.2020
IE16.01.2021
LU16.01.2021
BG21.01.2021
NO21.01.2021
GR22.01.2021
BE31.01.2021
CH31.01.2021
LI31.01.2021
IS21.02.2021
PT22.02.2021
[2024/22]
Former [2023/30]HU16.01.2014
AL21.10.2020
AT21.10.2020
CY21.10.2020
CZ21.10.2020
DK21.10.2020
EE21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
IT21.10.2020
LT21.10.2020
LV21.10.2020
MC21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SI21.10.2020
SK21.10.2020
SM21.10.2020
IE16.01.2021
LU16.01.2021
BG21.01.2021
NO21.01.2021
GR22.01.2021
BE31.01.2021
CH31.01.2021
LI31.01.2021
IS21.02.2021
PT22.02.2021
Former [2023/27]HU16.01.2014
AL21.10.2020
AT21.10.2020
CZ21.10.2020
DK21.10.2020
EE21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
IT21.10.2020
LT21.10.2020
LV21.10.2020
MC21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SI21.10.2020
SK21.10.2020
SM21.10.2020
IE16.01.2021
LU16.01.2021
BG21.01.2021
NO21.01.2021
GR22.01.2021
BE31.01.2021
CH31.01.2021
LI31.01.2021
IS21.02.2021
PT22.02.2021
Former [2022/34]AL21.10.2020
AT21.10.2020
CZ21.10.2020
DK21.10.2020
EE21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
IT21.10.2020
LT21.10.2020
LV21.10.2020
MC21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SI21.10.2020
SK21.10.2020
SM21.10.2020
IE16.01.2021
LU16.01.2021
BG21.01.2021
NO21.01.2021
GR22.01.2021
BE31.01.2021
CH31.01.2021
LI31.01.2021
IS21.02.2021
PT22.02.2021
Former [2022/23]AL21.10.2020
AT21.10.2020
CZ21.10.2020
DK21.10.2020
EE21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
IT21.10.2020
LT21.10.2020
LV21.10.2020
MC21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SI21.10.2020
SK21.10.2020
SM21.10.2020
IE16.01.2021
LU16.01.2021
BG21.01.2021
NO21.01.2021
GR22.01.2021
CH31.01.2021
LI31.01.2021
IS21.02.2021
PT22.02.2021
Former [2022/10]AL21.10.2020
AT21.10.2020
CZ21.10.2020
DK21.10.2020
EE21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
IT21.10.2020
LT21.10.2020
LV21.10.2020
MC21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SI21.10.2020
SK21.10.2020
SM21.10.2020
IE16.01.2021
LU16.01.2021
BG21.01.2021
NO21.01.2021
GR22.01.2021
CH31.01.2021
LI31.01.2021
PT22.02.2021
Former [2022/07]AL21.10.2020
AT21.10.2020
CZ21.10.2020
DK21.10.2020
EE21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
IT21.10.2020
LT21.10.2020
LV21.10.2020
MC21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SI21.10.2020
SK21.10.2020
SM21.10.2020
IE16.01.2021
LU16.01.2021
BG21.01.2021
NO21.01.2021
GR22.01.2021
CH31.01.2021
LI31.01.2021
IS21.02.2021
PT22.02.2021
Former [2021/52]AL21.10.2020
AT21.10.2020
CZ21.10.2020
DK21.10.2020
EE21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
IT21.10.2020
LT21.10.2020
LV21.10.2020
MC21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SI21.10.2020
SK21.10.2020
SM21.10.2020
LU16.01.2021
BG21.01.2021
NO21.01.2021
GR22.01.2021
CH31.01.2021
LI31.01.2021
IS21.02.2021
PT22.02.2021
Former [2021/50]AL21.10.2020
AT21.10.2020
CZ21.10.2020
DK21.10.2020
EE21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
IT21.10.2020
LT21.10.2020
LV21.10.2020
MC21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SI21.10.2020
SK21.10.2020
SM21.10.2020
LU16.01.2021
BG21.01.2021
NO21.01.2021
GR22.01.2021
IS21.02.2021
PT22.02.2021
Former [2021/48]AL21.10.2020
AT21.10.2020
CZ21.10.2020
DK21.10.2020
EE21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
IT21.10.2020
LT21.10.2020
LV21.10.2020
MC21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SK21.10.2020
SM21.10.2020
LU16.01.2021
BG21.01.2021
NO21.01.2021
GR22.01.2021
IS21.02.2021
PT22.02.2021
Former [2021/45]AL21.10.2020
AT21.10.2020
CZ21.10.2020
DK21.10.2020
EE21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
LT21.10.2020
LV21.10.2020
MC21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SK21.10.2020
SM21.10.2020
LU16.01.2021
BG21.01.2021
NO21.01.2021
GR22.01.2021
IS21.02.2021
PT22.02.2021
Former [2021/43]AT21.10.2020
CZ21.10.2020
DK21.10.2020
EE21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
LT21.10.2020
LV21.10.2020
MC21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SK21.10.2020
SM21.10.2020
LU16.01.2021
BG21.01.2021
NO21.01.2021
GR22.01.2021
IS21.02.2021
PT22.02.2021
Former [2021/40]AT21.10.2020
CZ21.10.2020
DK21.10.2020
EE21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
LT21.10.2020
LV21.10.2020
MC21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SK21.10.2020
SM21.10.2020
BG21.01.2021
NO21.01.2021
GR22.01.2021
IS21.02.2021
PT22.02.2021
Former [2021/37]AT21.10.2020
CZ21.10.2020
DK21.10.2020
EE21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
LT21.10.2020
LV21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SK21.10.2020
SM21.10.2020
BG21.01.2021
NO21.01.2021
GR22.01.2021
IS21.02.2021
PT22.02.2021
Former [2021/36]AT21.10.2020
CZ21.10.2020
EE21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
LT21.10.2020
LV21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SK21.10.2020
SM21.10.2020
BG21.01.2021
NO21.01.2021
GR22.01.2021
IS21.02.2021
PT22.02.2021
Former [2021/35]AT21.10.2020
CZ21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
LT21.10.2020
LV21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SK21.10.2020
SM21.10.2020
BG21.01.2021
NO21.01.2021
GR22.01.2021
IS21.02.2021
PT22.02.2021
Former [2021/34]AT21.10.2020
CZ21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
LT21.10.2020
LV21.10.2020
NL21.10.2020
PL21.10.2020
RS21.10.2020
SE21.10.2020
SM21.10.2020
BG21.01.2021
NO21.01.2021
GR22.01.2021
IS21.02.2021
PT22.02.2021
Former [2021/33]AT21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
LT21.10.2020
LV21.10.2020
NL21.10.2020
PL21.10.2020
RS21.10.2020
SE21.10.2020
SM21.10.2020
BG21.01.2021
NO21.01.2021
GR22.01.2021
IS21.02.2021
PT22.02.2021
Former [2021/32]AT21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
LV21.10.2020
NL21.10.2020
PL21.10.2020
RS21.10.2020
SE21.10.2020
SM21.10.2020
BG21.01.2021
NO21.01.2021
GR22.01.2021
IS21.02.2021
PT22.02.2021
Former [2021/28]AT21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
LV21.10.2020
NL21.10.2020
PL21.10.2020
RS21.10.2020
SE21.10.2020
BG21.01.2021
NO21.01.2021
GR22.01.2021
IS21.02.2021
PT22.02.2021
Former [2021/25]AT21.10.2020
ES21.10.2020
FI21.10.2020
LV21.10.2020
NL21.10.2020
PL21.10.2020
RS21.10.2020
SE21.10.2020
BG21.01.2021
NO21.01.2021
GR22.01.2021
IS21.02.2021
PT22.02.2021
Former [2021/24]AT21.10.2020
FI21.10.2020
LV21.10.2020
NL21.10.2020
RS21.10.2020
SE21.10.2020
BG21.01.2021
NO21.01.2021
GR22.01.2021
PT22.02.2021
Former [2021/23]FI21.10.2020
LV21.10.2020
NL21.10.2020
RS21.10.2020
SE21.10.2020
NO21.01.2021
GR22.01.2021
PT22.02.2021
Former [2021/22]FI21.10.2020
NL21.10.2020
RS21.10.2020
NO21.01.2021
PT22.02.2021
Former [2021/21]FI21.10.2020
NL21.10.2020
PT22.02.2021
Former [2021/20]FI21.10.2020
Cited inInternational search[I]US7436297  (TUCKER JAMES L [US]) [I] 1-22 * column 2, line 49 - column 5, line 11 * * column 5, line 60 - column 6, line 14 * * column 6, line 49 - column 7, line 33 * * figures 1,2 *;
 [I]WO2011124993  (KONINKL PHILIPS ELECTRONICS NV [NL], et al) [I] 1-22 * page 4, line 1 - page 5, line 15 * * page 5, line 27 - line 29 * * page 8, line 1 - page 9, line 16 ** figures 1,3,4 *;
 [XI]DE102010035476  (NOVAR GMBH [DE]) [X] 1,11 * paragraph [0021] - paragraph [0025]; figure 1 * [I] 2-10,12-22;
 [XI]EP2466564  (HONEYWELL INT INC [US]) [X] 1,11 * paragraph [0020] - paragraph [0030]; figures 1,2 * [I] 2-10,12-22
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.