EP3097736 - TEMPLATE FRAME BASED MAC OPERATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.01.2020 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 08.02.2019 | ||
Former | Grant of patent is intended Status updated on 22.10.2018 | ||
Former | Examination is in progress Status updated on 24.11.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [2019/11] |
Former [2016/48] | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | Inventor(s) | 01 /
KRONANDER, Jonas Svanvägen 33 S-741 42 Knivsta / SE | 02 /
AXNÄS, Johan Johan Enbergs väg 15 S-171 62 Solna / SE | 03 /
BALDEMAIR, Robert Honnörsgatan 16 S-170 69 Solna / SE | 04 /
HUI, Dennis 1019 Havre Court Sunnyvale, California 94087 / US | 05 /
ZHANG, Zhan Ericsson Tower No. 5 Lize East Street Beijing Chaoyang 100102 / CN | [2016/48] | Representative(s) | Brann AB P.O. Box 3690 Sveavägen 63 103 59 Stockholm / SE | [N/P] |
Former [2019/11] | Brann AB P.O. Box 3690 Drottninggatan 27 103 59 Stockholm / SE | ||
Former [2016/48] | Röthinger, Rainer Wuesthoff & Wuesthoff Patentanwälte PartG mbB Schweigerstrasse 2 81541 München / DE | Application number, filing date | 14701057.3 | 21.01.2014 | [2016/48] | WO2014EP51121 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015110145 | Date: | 30.07.2015 | Language: | EN | [2015/30] | Type: | A1 Application with search report | No.: | EP3097736 | Date: | 30.11.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 30.07.2015 takes the place of the publication of the European patent application. | [2016/48] | Type: | B1 Patent specification | No.: | EP3097736 | Date: | 13.03.2019 | Language: | EN | [2019/11] | Search report(s) | International search report - published on: | EP | 30.07.2015 | Classification | IPC: | H04W72/12, H04W40/12 | [2018/41] | CPC: |
H04W72/54 (EP,US);
H04W72/0446 (US);
H04W40/00 (US);
H04W40/12 (EP,US);
H04W72/20 (EP,US)
|
Former IPC [2016/48] | H04W72/12, H04W40/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/48] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SCHABLONENRAHMENBASIERTER MAC-BETRIEB | [2016/48] | English: | TEMPLATE FRAME BASED MAC OPERATION | [2016/48] | French: | FONCTIONNEMENT MAC BASÉ SUR TRAME CADRE | [2016/48] | Entry into regional phase | 09.08.2016 | National basic fee paid | 09.08.2016 | Designation fee(s) paid | 09.08.2016 | Examination fee paid | Examination procedure | 09.08.2016 | Examination requested [2016/48] | 01.03.2017 | Amendment by applicant (claims and/or description) | 24.11.2017 | Despatch of a communication from the examining division (Time limit: M04) | 04.04.2018 | Reply to a communication from the examining division | 23.10.2018 | Communication of intention to grant the patent | 19.12.2018 | Receipt of the translation of the claim(s) | 14.01.2019 | Fee for grant paid | 14.01.2019 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 24.11.2017 | Opposition(s) | 16.12.2019 | No opposition filed within time limit [2020/08] | Fees paid | Renewal fee | 09.08.2016 | Renewal fee patent year 03 | 27.01.2017 | Renewal fee patent year 04 | 29.01.2018 | Renewal fee patent year 05 | 28.01.2019 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.01.2014 | AL | 13.03.2019 | AT | 13.03.2019 | CY | 13.03.2019 | CZ | 13.03.2019 | DK | 13.03.2019 | EE | 13.03.2019 | ES | 13.03.2019 | FI | 13.03.2019 | HR | 13.03.2019 | IT | 13.03.2019 | LT | 13.03.2019 | LV | 13.03.2019 | MC | 13.03.2019 | MK | 13.03.2019 | MT | 13.03.2019 | NL | 13.03.2019 | PL | 13.03.2019 | RO | 13.03.2019 | RS | 13.03.2019 | SE | 13.03.2019 | SI | 13.03.2019 | SK | 13.03.2019 | SM | 13.03.2019 | TR | 13.03.2019 | BG | 13.06.2019 | NO | 13.06.2019 | GR | 14.06.2019 | IS | 13.07.2019 | PT | 13.07.2019 | [2022/32] |
Former [2022/27] | HU | 21.01.2014 | |
AL | 13.03.2019 | ||
AT | 13.03.2019 | ||
CY | 13.03.2019 | ||
CZ | 13.03.2019 | ||
DK | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
MC | 13.03.2019 | ||
MT | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
SI | 13.03.2019 | ||
SK | 13.03.2019 | ||
SM | 13.03.2019 | ||
TR | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
IS | 13.07.2019 | ||
PT | 13.07.2019 | ||
Former [2020/39] | AL | 13.03.2019 | |
AT | 13.03.2019 | ||
CZ | 13.03.2019 | ||
DK | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
MC | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
SI | 13.03.2019 | ||
SK | 13.03.2019 | ||
SM | 13.03.2019 | ||
TR | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
IS | 13.07.2019 | ||
PT | 13.07.2019 | ||
Former [2020/17] | AL | 13.03.2019 | |
AT | 13.03.2019 | ||
CZ | 13.03.2019 | ||
DK | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
SI | 13.03.2019 | ||
SK | 13.03.2019 | ||
SM | 13.03.2019 | ||
TR | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
IS | 13.07.2019 | ||
PT | 13.07.2019 | ||
Former [2020/13] | AL | 13.03.2019 | |
AT | 13.03.2019 | ||
CZ | 13.03.2019 | ||
DK | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
SI | 13.03.2019 | ||
SK | 13.03.2019 | ||
SM | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
IS | 13.07.2019 | ||
PT | 13.07.2019 | ||
Former [2020/09] | AL | 13.03.2019 | |
AT | 13.03.2019 | ||
CZ | 13.03.2019 | ||
DK | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
SK | 13.03.2019 | ||
SM | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
IS | 13.07.2019 | ||
PT | 13.07.2019 | ||
Former [2020/04] | AL | 13.03.2019 | |
AT | 13.03.2019 | ||
CZ | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
SK | 13.03.2019 | ||
SM | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
IS | 13.07.2019 | ||
PT | 13.07.2019 | ||
Former [2020/03] | AL | 13.03.2019 | |
AT | 13.03.2019 | ||
CZ | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
SK | 13.03.2019 | ||
SM | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
PT | 13.07.2019 | ||
Former [2019/52] | AL | 13.03.2019 | |
CZ | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
SK | 13.03.2019 | ||
SM | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
PT | 13.07.2019 | ||
Former [2019/51] | AL | 13.03.2019 | |
CZ | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
RO | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
SK | 13.03.2019 | ||
SM | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
PT | 13.07.2019 | ||
Former [2019/49] | AL | 13.03.2019 | |
CZ | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
RO | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
SK | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
PT | 13.07.2019 | ||
Former [2019/48] | ES | 13.03.2019 | |
FI | 13.03.2019 | ||
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
PT | 13.07.2019 | ||
Former [2019/47] | ES | 13.03.2019 | |
FI | 13.03.2019 | ||
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
Former [2019/46] | FI | 13.03.2019 | |
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
Former [2019/39] | FI | 13.03.2019 | |
HR | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
Former [2019/38] | FI | 13.03.2019 | |
LT | 13.03.2019 | ||
SE | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
Former [2019/37] | FI | 13.03.2019 | |
LT | 13.03.2019 | ||
SE | 13.03.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
Former [2019/34] | FI | 13.03.2019 | |
LT | 13.03.2019 | ||
SE | 13.03.2019 | ||
NO | 13.06.2019 | ||
Former [2019/33] | FI | 13.03.2019 | |
LT | 13.03.2019 | ||
NO | 13.06.2019 | Cited in | International search | [XI] - Aydin O. et al, "Summary on preliminary trade-off investigations and first set of potential network-level solutions", no. ICT-317669-METIS/D4.1, (20130930), pages 1 - 97, EU project METIS, URL: https://www.metis2020.com/wp-content/uploads/deliverables/METIS_D4.1_v1.pdf, (20141003), XP055144276 [X] 1-6,9-12,14-20,22 * Smart and coordinated resource usage in UDN; page 21, paragraph 2.2.2 - page 22 * * Technology Component 7: Decentralized and hybrid Schemes for Interference Management in UDN; page 29, paragraph 2.2.2.4 - page 32 * [I] 7,8,13,21 | [A] - XIAOBO YU ET AL, "Distributed resource reservation for real time sessions in multi-hop wireless networks", WIRELESS COMMUNICATIONS AND MOBILE COMPUTING CONFERENCE (IWCMC), 2011 7TH INTERNATIONAL, IEEE, (20110704), doi:10.1109/IWCMC.2011.5982542, ISBN 978-1-4244-9539-9, pages 255 - 260, XP031925629 [A] 1-22 * PROPOSED SOLUTION; page 256, paragraph III - page 258 * DOI: http://dx.doi.org/10.1109/IWCMC.2011.5982542 | [A] - XIAOBO YU ET AL, "Resource Reservation Schemes for IEEE 802.11-Based Wireless Networks: A Survey", IEEE COMMUNICATIONS SURVEYS, IEEE, NEW YORK, NY, US, (20130701), vol. 15, no. 3, doi:10.1109/SURV.2012.111412.00029, ISSN 1553-877X, pages 1042 - 1061, XP011523253 [A] 1-22 * Hybrid-based schemes; page 1057, column l, paragraph b - page 1058, column r * DOI: http://dx.doi.org/10.1109/SURV.2012.111412.00029 | [A] - BERNARDOS CARLOS J ET AL, "Challenges of designing jointly the backhaul and radio access network in a cloud-based mobile network", 2013 FUTURE NETWORK & MOBILE SUMMIT, AUTHORS, (20130703), pages 1 - 10, XP032506926 [A] 1-22 * abstract * * Joint access /backhaul RRM and novel backhaul solutions; page 5, paragraph 3.2 - page 6 * | [A] - HUI D ET AL, "Joint routing and resource allocation for wireless self-backhaul in an indoor ultra-dense network", 2013 IEEE 24TH ANNUAL INTERNATIONAL SYMPOSIUM ON PERSONAL, INDOOR, AND MOBILE RADIO COMMUNICATIONS (PIMRC), IEEE PISCATAWAY, NJ, USA, (20130911), doi:10.1109/PIMRC.2013.6666676, ISBN 978-1-4577-1348-4, pages 3083 - 3088, XP002730610 [A] 1-22 * abstract * * ROUTING FOR WIRELESS MESH NETWORKS; page 3084, paragraph III - page 3086 * DOI: http://dx.doi.org/10.1109/PIMRC.2013.6666676 |