EP2943436 - METHOD FOR PRODUCING HYDROGEN [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.09.2019 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 19.10.2018 | ||
Former | Grant of patent is intended Status updated on 30.07.2018 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Centre National de la Recherche Scientifique 3, rue Michel-Ange 75016 Paris / FR | For all designated states Université de Lille 42, rue Paul Duez 59800 Lille / FR | [2019/03] |
Former [2019/01] | For all designated states Centre National de la Recherche Scientifique (C.N.R.S.) 3, rue Michel-Ange 75016 Paris / FR | ||
For all designated states Université Lille 1 Bâtiment A3 Cité Scientifique 59655 Villeneuve d'Ascq cedex / FR | |||
Former [2018/47] | For all designated states Centre National de la Recherche Scientifique (C.N.R.S.) 3, rue Michel-Ange 75016 Paris / FR | ||
For all designated states Université Lille 1 - Sciences Et Technologies Cité Scientifique Bat A3 59655 Villeneuve D'ascq Cedex / FR | |||
Former [2015/47] | For all designated states Centre National de la Recherche Scientifique (C.N.R.S.) 3, rue Michel-Ange 75016 Paris / FR | ||
For all designated states Université Lille 1 - Sciences Et Technologies Cité Scientifique Bat A3 59655 Villeneuve D'ascq Cedex / FR | Inventor(s) | 01 /
DUHAMEL, Louise 246 av. de Brigode F-59650 Villeneuve d'Ascq / FR | 02 /
FANG, Wenhao E-304 Rés : Léonard de Vinci Bd Paul Langevin F-59650 Villeneuve d'Ascq / FR | 03 /
PAUL, Sébastien 58 rue du Rieu F-59158 Thun St Amand / FR | 04 /
DUMEIGNIL, Franck Appt 6 18 rue de l'Abbé Bonpain F-59273 Fretin / FR | [2015/47] | Representative(s) | Lavoix, et al 2, place d'Estienne d'Orves 75441 Paris Cedex 09 / FR | [2018/47] |
Former [2015/47] | Goulard, Sophie, et al Ipsilon Brema-Loyer Le Centralis 63, avenue du Général Leclerc 92340 Bourg-la-Reine / FR | Application number, filing date | 14703116.5 | 09.01.2014 | [2015/47] | WO2014FR50025 | Priority number, date | FR20130050218 | 10.01.2013 Original published format: FR 1350218 | [2015/47] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2014108636 | Date: | 17.07.2014 | Language: | FR | [2014/29] | Type: | A1 Application with search report | No.: | EP2943436 | Date: | 18.11.2015 | Language: | FR | The application published by WIPO in one of the EPO official languages on 17.07.2014 takes the place of the publication of the European patent application. | [2015/47] | Type: | B1 Patent specification | No.: | EP2943436 | Date: | 21.11.2018 | Language: | FR | [2018/47] | Type: | B8 Corrected title page of specification | No.: | EP2943436 | Date: | 06.03.2019 | [2019/10] | Search report(s) | International search report - published on: | EP | 17.07.2014 | Classification | IPC: | C01B3/32 | [2015/47] | CPC: |
B01J23/83 (EP,US);
B01J37/009 (US);
B01J37/03 (EP,US);
B01J37/14 (US);
B01J37/18 (EP,US);
C01B3/326 (EP,US);
B01J35/30 (EP,US);
B01J35/40 (EP,US);
B01J35/613 (EP,US);
B01J35/615 (EP,US);
C01B2203/0233 (EP,US);
C01B2203/1058 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/47] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUR HERSTELLUNG VON WASSERSTOFF | [2015/47] | English: | METHOD FOR PRODUCING HYDROGEN | [2015/47] | French: | PROCÉDÉ DE PRODUCTION D'HYDROGENE | [2018/28] |
Former [2015/47] | PROCEDE DE PRODUCTION D'HYDROGENE | Entry into regional phase | 21.07.2015 | National basic fee paid | 21.07.2015 | Designation fee(s) paid | 21.07.2015 | Examination fee paid | Examination procedure | 21.07.2015 | Examination requested [2015/47] | 01.02.2016 | Amendment by applicant (claims and/or description) | 11.06.2018 | Communication of intention to grant the patent | 11.10.2018 | Fee for grant paid | 11.10.2018 | Fee for publishing/printing paid | 11.10.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 11.06.2018 | Opposition(s) | 22.08.2019 | No opposition filed within time limit [2019/44] | Fees paid | Renewal fee | 28.01.2016 | Renewal fee patent year 03 | 24.01.2017 | Renewal fee patent year 04 | 30.12.2017 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.01.2014 | AL | 21.11.2018 | AT | 21.11.2018 | CY | 21.11.2018 | CZ | 21.11.2018 | DK | 21.11.2018 | EE | 21.11.2018 | ES | 21.11.2018 | FI | 21.11.2018 | HR | 21.11.2018 | IT | 21.11.2018 | LT | 21.11.2018 | LV | 21.11.2018 | MC | 21.11.2018 | MK | 21.11.2018 | MT | 21.11.2018 | NL | 21.11.2018 | PL | 21.11.2018 | RO | 21.11.2018 | RS | 21.11.2018 | SE | 21.11.2018 | SI | 21.11.2018 | SK | 21.11.2018 | SM | 21.11.2018 | TR | 21.11.2018 | IE | 09.01.2019 | LU | 09.01.2019 | CH | 31.01.2019 | LI | 31.01.2019 | BG | 21.02.2019 | NO | 21.02.2019 | GR | 22.02.2019 | IS | 21.03.2019 | PT | 21.03.2019 | [2022/31] |
Former [2021/32] | HU | 09.01.2014 | |
AL | 21.11.2018 | ||
AT | 21.11.2018 | ||
CY | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
MC | 21.11.2018 | ||
MT | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
RS | 21.11.2018 | ||
SE | 21.11.2018 | ||
SI | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
TR | 21.11.2018 | ||
IE | 09.01.2019 | ||
LU | 09.01.2019 | ||
CH | 31.01.2019 | ||
LI | 31.01.2019 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2021/26] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CY | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
MC | 21.11.2018 | ||
MT | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
RS | 21.11.2018 | ||
SE | 21.11.2018 | ||
SI | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
TR | 21.11.2018 | ||
IE | 09.01.2019 | ||
LU | 09.01.2019 | ||
CH | 31.01.2019 | ||
LI | 31.01.2019 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2020/29] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
MC | 21.11.2018 | ||
MT | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
RS | 21.11.2018 | ||
SE | 21.11.2018 | ||
SI | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
TR | 21.11.2018 | ||
IE | 09.01.2019 | ||
LU | 09.01.2019 | ||
CH | 31.01.2019 | ||
LI | 31.01.2019 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2020/17] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
MC | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
RS | 21.11.2018 | ||
SE | 21.11.2018 | ||
SI | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
TR | 21.11.2018 | ||
IE | 09.01.2019 | ||
LU | 09.01.2019 | ||
CH | 31.01.2019 | ||
LI | 31.01.2019 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2020/09] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
MC | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
RS | 21.11.2018 | ||
SE | 21.11.2018 | ||
SI | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
IE | 09.01.2019 | ||
LU | 09.01.2019 | ||
CH | 31.01.2019 | ||
LI | 31.01.2019 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2020/04] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
MC | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
RS | 21.11.2018 | ||
SE | 21.11.2018 | ||
SI | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
LU | 09.01.2019 | ||
CH | 31.01.2019 | ||
LI | 31.01.2019 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2019/50] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
MC | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
RS | 21.11.2018 | ||
SE | 21.11.2018 | ||
SI | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
LU | 09.01.2019 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2019/44] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
MC | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
RS | 21.11.2018 | ||
SE | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
LU | 09.01.2019 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2019/40] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
MC | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
RS | 21.11.2018 | ||
SE | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2019/37] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
RS | 21.11.2018 | ||
SE | 21.11.2018 | ||
SM | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2019/35] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RS | 21.11.2018 | ||
SE | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2019/34] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
DK | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
NL | 21.11.2018 | ||
RS | 21.11.2018 | ||
SE | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2019/26] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
NL | 21.11.2018 | ||
RS | 21.11.2018 | ||
SE | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2019/25] | AT | 21.11.2018 | |
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
NL | 21.11.2018 | ||
RS | 21.11.2018 | ||
SE | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
Former [2019/24] | AT | 21.11.2018 | |
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
NL | 21.11.2018 | ||
SE | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
Former [2019/23] | AT | 21.11.2018 | |
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
NL | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
IS | 21.03.2019 | ||
Former [2019/22] | FI | 21.11.2018 | |
LT | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
IS | 21.03.2019 | ||
Former [2019/21] | FI | 21.11.2018 | |
LT | 21.11.2018 | ||
NO | 21.02.2019 | ||
IS | 21.03.2019 | ||
Former [2019/20] | LT | 21.11.2018 | |
NO | 21.02.2019 | Cited in | International search | [A]WO2004041724 (CENTRE NAT RECH SCIENT [FR], et al) [A] 1-16 * claim - *; | [AD]FR2876996 (CENTRE NAT RECH SCIENT [FR], et al) [AD] 1-16 * example - *; | [AD] - CYRIL PIREZ ET AL, "Highly Efficient and Stable CeNiHZOY Nano-Oxyhydride Catalyst for H2 Production from Ethanol at Room Temperature", ANGEWANDTE CHEMIE INTERNATIONAL EDITION, (20111017), vol. 50, no. 43, doi:10.1002/anie.201102617, ISSN 1433-7851, pages 10193 - 10197, XP055077417 [AD] 1-16 * the whole document * DOI: http://dx.doi.org/10.1002/anie.201102617 | [A] - JALOWIECKI-DUHAMEL L ET AL, "Hydrogen production from ethanol steam reforming over cerium and nickel based oxyhydrides", INTERNATIONAL JOURNAL OF HYDROGEN ENERGY, ELSEVIER SCIENCE PUBLISHERS B.V., BARKING, GB, vol. 35, no. 23, doi:10.1016/J.IJHYDENE.2009.08.080, ISSN 0360-3199, (20101201), pages 12741 - 12750, (20090926), XP027459196 [A] 1-16 * the whole document * DOI: http://dx.doi.org/10.1016/j.ijhydene.2009.08.080 | [A] - WENHAO FANG ET AL, "Ce-Ni mixed oxide as efficient catalyst for H2 production and nanofibrous carbon material from ethanol in the presence of water", RSC ADVANCES, (20120101), vol. 2, no. 25, doi:10.1039/c2ra21701e, ISSN 2046-2069, page 9626, XP055077631 [A] 1-16 * the whole document * DOI: http://dx.doi.org/10.1039/c2ra21701e | by applicant | FR2795339 | FR2876996 | WO2009009844 | US2012201745 | - AUPRÊTRE ET AL., CATAL. COMMUN., (2002), page 263 | - PIREZ ET AL., ANGEW. CHEM. INT. ED., (2011), page 10193 | - JALOWIECKI-DUHAMEL ET AL., INT. J. HYDROGEN ENERGY, (2010), vol. 35, pages 12741 - 12750 | - PONCHEL ET AL., PHYS. CHEM. CHEM. PHYS., (2000), vol. 2, pages 303 - 312 | - JALOWIECKI-DUHAMEL ET AL., INT. J. NUCLEAR HYDROGEN PRODUCTION AND APPLICATIONS, (2009), vol. 2, no. 2, pages 148 - 158 |