EP2965376 - RECHARGEABLE COPPER-ZINC CELL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 31.07.2020 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 23.08.2019 | ||
Former | Grant of patent is intended Status updated on 01.04.2019 | ||
Former | Examination is in progress Status updated on 09.01.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Cumulus Energy Storage Limited AMP Technology Centre Advanced Manufacturing Park Brunel Way Rotherham S60 5WG / GB | [2016/02] | Inventor(s) | 01 /
HURWITZ, Michael David 2820 Barbers Point Road Alameda, CA 94501 / US | 02 /
BRACKENBURY, Darron Rolfe 156 Natalie Drive Moraga, CA 94556 / US | [2016/02] | Representative(s) | Cawley, Aimee Elizabeth, et al Marks & Clerk LLP 1 New York Street Manchester M1 4HD / GB | [2019/39] |
Former [2016/02] | Cawley, Aimee Elizabeth, et al Marks & Clerk LLP 1 New York Street Manchester, M1 4HD / GB | Application number, filing date | 14706658.3 | 17.02.2014 | [2016/02] | WO2014GB00054 | Priority number, date | GB20130003759 | 04.03.2013 Original published format: GB 201303759 | [2016/02] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014135828 | Date: | 12.09.2014 | Language: | EN | [2014/37] | Type: | A1 Application with search report | No.: | EP2965376 | Date: | 13.01.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 12.09.2014 takes the place of the publication of the European patent application. | [2016/02] | Type: | B1 Patent specification | No.: | EP2965376 | Date: | 25.09.2019 | Language: | EN | [2019/39] | Search report(s) | International search report - published on: | EP | 12.09.2014 | Classification | IPC: | H01M2/02, H01M2/16, H01M4/42, H01M10/36, H01M4/02, H01M8/18, H01M10/04 | [2019/15] | CPC: |
H01M8/188 (EP,GB,US);
H01M10/36 (EP,GB,US);
H01M4/42 (US);
H01M10/04 (GB);
H01M10/0418 (EP,GB,US);
H01M50/103 (EP,GB,US);
H01M50/138 (EP,US);
H01M50/414 (EP,GB,US);
H01M2004/029 (US);
H01M2300/00 (US);
Y02E60/10 (EP,GB);
Y02E60/50 (EP,US);
Y02P70/50 (EP)
(-)
|
Former IPC [2016/02] | H01M8/18 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/02] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | WIEDERAUFLADBARE KUPFER-ZINK-ZELLE | [2016/02] | English: | RECHARGEABLE COPPER-ZINC CELL | [2016/02] | French: | PILE RECHARGEABLE CUIVRE-ZINC | [2016/02] | Entry into regional phase | 02.09.2015 | National basic fee paid | 02.09.2015 | Designation fee(s) paid | 02.09.2015 | Examination fee paid | Examination procedure | 02.09.2015 | Amendment by applicant (claims and/or description) | 02.09.2015 | Examination requested [2016/02] | 19.08.2016 | Despatch of a communication from the examining division (Time limit: M06) | 14.02.2017 | Reply to a communication from the examining division | 25.09.2018 | Despatch of a communication from the examining division (Time limit: M04) | 05.02.2019 | Reply to a communication from the examining division | 02.04.2019 | Communication of intention to grant the patent | 12.08.2019 | Fee for grant paid | 12.08.2019 | Fee for publishing/printing paid | 12.08.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 19.08.2016 | Opposition(s) | 26.06.2020 | No opposition filed within time limit [2020/36] | Fees paid | Renewal fee | 25.02.2016 | Renewal fee patent year 03 | 10.02.2017 | Renewal fee patent year 04 | 14.02.2018 | Renewal fee patent year 05 | 28.02.2019 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.02.2014 | AL | 25.09.2019 | AT | 25.09.2019 | CY | 25.09.2019 | CZ | 25.09.2019 | DK | 25.09.2019 | EE | 25.09.2019 | FI | 25.09.2019 | HR | 25.09.2019 | LT | 25.09.2019 | LV | 25.09.2019 | MC | 25.09.2019 | MK | 25.09.2019 | MT | 25.09.2019 | PL | 25.09.2019 | RO | 25.09.2019 | RS | 25.09.2019 | SE | 25.09.2019 | SI | 25.09.2019 | SK | 25.09.2019 | SM | 25.09.2019 | TR | 25.09.2019 | BG | 25.12.2019 | NO | 25.12.2019 | GR | 26.12.2019 | IS | 26.01.2020 | PT | 27.01.2020 | LU | 17.02.2020 | BE | 29.02.2020 | CH | 29.02.2020 | LI | 29.02.2020 | [2022/32] |
Former [2022/27] | HU | 17.02.2014 | |
AL | 25.09.2019 | ||
AT | 25.09.2019 | ||
CY | 25.09.2019 | ||
CZ | 25.09.2019 | ||
DK | 25.09.2019 | ||
EE | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
MC | 25.09.2019 | ||
MT | 25.09.2019 | ||
PL | 25.09.2019 | ||
RO | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
SI | 25.09.2019 | ||
SK | 25.09.2019 | ||
SM | 25.09.2019 | ||
TR | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
IS | 26.01.2020 | ||
PT | 27.01.2020 | ||
LU | 17.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2021/12] | AL | 25.09.2019 | |
AT | 25.09.2019 | ||
CZ | 25.09.2019 | ||
DK | 25.09.2019 | ||
EE | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
MC | 25.09.2019 | ||
PL | 25.09.2019 | ||
RO | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
SI | 25.09.2019 | ||
SK | 25.09.2019 | ||
SM | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
IS | 26.01.2020 | ||
PT | 27.01.2020 | ||
LU | 17.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2020/51] | AL | 25.09.2019 | |
AT | 25.09.2019 | ||
CZ | 25.09.2019 | ||
DK | 25.09.2019 | ||
EE | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
MC | 25.09.2019 | ||
PL | 25.09.2019 | ||
RO | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
SI | 25.09.2019 | ||
SK | 25.09.2019 | ||
SM | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
IS | 26.01.2020 | ||
PT | 27.01.2020 | ||
LU | 17.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2020/50] | AL | 25.09.2019 | |
AT | 25.09.2019 | ||
CZ | 25.09.2019 | ||
DK | 25.09.2019 | ||
EE | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
MC | 25.09.2019 | ||
PL | 25.09.2019 | ||
RO | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
SI | 25.09.2019 | ||
SK | 25.09.2019 | ||
SM | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
IS | 26.01.2020 | ||
PT | 27.01.2020 | ||
LU | 17.02.2020 | ||
Former [2020/48] | AL | 25.09.2019 | |
AT | 25.09.2019 | ||
CZ | 25.09.2019 | ||
DK | 25.09.2019 | ||
EE | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
PL | 25.09.2019 | ||
RO | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
SK | 25.09.2019 | ||
SM | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
IS | 26.01.2020 | ||
PT | 27.01.2020 | ||
LU | 17.02.2020 | ||
Former [2020/36] | AL | 25.09.2019 | |
AT | 25.09.2019 | ||
CZ | 25.09.2019 | ||
DK | 25.09.2019 | ||
EE | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
PL | 25.09.2019 | ||
RO | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
SK | 25.09.2019 | ||
SM | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
IS | 26.01.2020 | ||
PT | 27.01.2020 | ||
Former [2020/27] | AL | 25.09.2019 | |
AT | 25.09.2019 | ||
CZ | 25.09.2019 | ||
EE | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
PL | 25.09.2019 | ||
RO | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
SK | 25.09.2019 | ||
SM | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
PT | 27.01.2020 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AL | 25.09.2019 | |
AT | 25.09.2019 | ||
CZ | 25.09.2019 | ||
EE | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
PL | 25.09.2019 | ||
RO | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
SK | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
PT | 27.01.2020 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 25.09.2019 | |
AT | 25.09.2019 | ||
EE | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
PL | 25.09.2019 | ||
RO | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
PT | 27.01.2020 | ||
Former [2020/22] | AL | 25.09.2019 | |
EE | 25.09.2019 | ||
FI | 25.09.2019 | ||
HR | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
PT | 27.01.2020 | ||
Former [2020/11] | FI | 25.09.2019 | |
HR | 25.09.2019 | ||
LT | 25.09.2019 | ||
LV | 25.09.2019 | ||
RS | 25.09.2019 | ||
SE | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
GR | 26.12.2019 | ||
Former [2020/10] | FI | 25.09.2019 | |
LT | 25.09.2019 | ||
SE | 25.09.2019 | ||
BG | 25.12.2019 | ||
NO | 25.12.2019 | ||
Former [2020/09] | FI | 25.09.2019 | |
LT | 25.09.2019 | ||
NO | 25.12.2019 | ||
Former [2020/08] | LT | 25.09.2019 | |
NO | 25.12.2019 | Cited in | International search | [A]US2004029019 (CLARKE ROBERT LEWIS [US], et al)[A] 1-8; | [I]US2011244277 (GORDON II JOSEPH GROVER [US], et al) [I] 1-8 * paragraph [0053]; figures 5, 6 * |