| EP2949159 - MULTIPLE POWER CONTROL AND TIMING ADVANCE LOOPS DURING WIRELESS COMMUNICATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.04.2018 Database last updated on 11.04.2026 | |
| Former | The patent has been granted Status updated on 28.04.2017 | ||
| Former | Grant of patent is intended Status updated on 15.12.2016 | ||
| Former | Examination is in progress Status updated on 23.11.2016 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states Qualcomm Incorporated Attn: International IP Administration 5775 Morehouse Drive San Diego, CA 92121 / US | [2017/02] |
| Former [2015/49] | For all designated states Qualcomm Incorporated 5775 Morehouse Drive San Diego, CA 92121 / US | Inventor(s) | 01 /
CHEN, Wanshi 5775 Morehouse Drive San Diego, California 92121 / US | 02 /
XU, Hao 5775 Morehouse Drive San Diego, California 92121 / US | 03 /
GAAL, Peter 5775 Morehouse Drive San Diego, California 92121 / US | 04 /
WEI, Yongbin 5775 Morehouse Drive San Diego, California 92121 / US | [2015/49] | Representative(s) | Wegner, Hans Bardehle Pagenberg Partnerschaft mbB Patentanwälte, Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | [2015/49] | Application number, filing date | 14707259.9 | 24.01.2014 | [2015/49] | WO2014US13056 | Priority number, date | US201361756403P | 24.01.2013 Original published format: US 201361756403 P | US201414162664 | 23.01.2014 Original published format: US201414162664 | [2015/49] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014117029 | Date: | 31.07.2014 | Language: | EN | [2014/31] | Type: | A1 Application with search report | No.: | EP2949159 | Date: | 02.12.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 31.07.2014 takes the place of the publication of the European patent application. | [2015/49] | Type: | B1 Patent specification | No.: | EP2949159 | Date: | 31.05.2017 | Language: | EN | [2017/22] | Search report(s) | International search report - published on: | EP | 31.07.2014 | Classification | IPC: | H04W52/54, H04B7/26, H04W56/00 | [2015/49] | CPC: |
H04W52/54 (EP,CN,US);
H04L5/0028 (US);
H04B7/2681 (EP,US);
H04W52/221 (US);
H04W56/0005 (EP,CN,US);
H04W56/004 (EP,US);
H04W56/0045 (EP,CN,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/49] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | MEHRFACHENERGIESTEUERUNG UND ZEITVORLAUFSCHLEIFEN IN DER DRAHTLOSEN KOMMUNIKATION | [2015/49] | English: | MULTIPLE POWER CONTROL AND TIMING ADVANCE LOOPS DURING WIRELESS COMMUNICATION | [2015/49] | French: | BOUCLES MULTIPLES DE RÉGLAGE DE PUISSANCE ET D'AVANCE TEMPORELLE DURANT UNE COMMUNICATION SANS FIL | [2015/49] | Entry into regional phase | 06.07.2015 | National basic fee paid | 06.07.2015 | Designation fee(s) paid | 06.07.2015 | Examination fee paid | Examination procedure | 06.07.2015 | Examination requested [2015/49] | 01.03.2016 | Amendment by applicant (claims and/or description) | 12.07.2016 | Despatch of a communication from the examining division (Time limit: M04) | 15.11.2016 | Reply to a communication from the examining division | 16.12.2016 | Communication of intention to grant the patent | 21.04.2017 | Fee for grant paid | 21.04.2017 | Fee for publishing/printing paid | 21.04.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 12.07.2016 | Opposition(s) | 01.03.2018 | No opposition filed within time limit [2018/19] | Fees paid | Renewal fee | 17.12.2015 | Renewal fee patent year 03 | 09.01.2017 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.01.2014 | AL | 31.05.2017 | AT | 31.05.2017 | CY | 31.05.2017 | CZ | 31.05.2017 | DK | 31.05.2017 | EE | 31.05.2017 | ES | 31.05.2017 | FI | 31.05.2017 | HR | 31.05.2017 | IT | 31.05.2017 | LT | 31.05.2017 | LV | 31.05.2017 | MC | 31.05.2017 | MK | 31.05.2017 | NL | 31.05.2017 | PL | 31.05.2017 | PT | 31.05.2017 | RO | 31.05.2017 | RS | 31.05.2017 | SE | 31.05.2017 | SI | 31.05.2017 | SK | 31.05.2017 | SM | 31.05.2017 | TR | 31.05.2017 | BG | 31.08.2017 | NO | 31.08.2017 | GR | 01.09.2017 | IS | 30.09.2017 | IE | 24.01.2018 | LU | 24.01.2018 | MT | 24.01.2018 | BE | 31.01.2018 | CH | 31.01.2018 | LI | 31.01.2018 | [2020/34] |
| Former [2020/31] | HU | 24.01.2014 | |
| AT | 31.05.2017 | ||
| CY | 31.05.2017 | ||
| CZ | 31.05.2017 | ||
| DK | 31.05.2017 | ||
| EE | 31.05.2017 | ||
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| IT | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| MC | 31.05.2017 | ||
| MK | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| PL | 31.05.2017 | ||
| PT | 31.05.2017 | ||
| RO | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| SI | 31.05.2017 | ||
| SK | 31.05.2017 | ||
| SM | 31.05.2017 | ||
| TR | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| IE | 24.01.2018 | ||
| LU | 24.01.2018 | ||
| MT | 24.01.2018 | ||
| BE | 31.01.2018 | ||
| CH | 31.01.2018 | ||
| LI | 31.01.2018 | ||
| Former [2020/30] | HU | 24.01.2014 | |
| AT | 31.05.2017 | ||
| CZ | 31.05.2017 | ||
| DK | 31.05.2017 | ||
| EE | 31.05.2017 | ||
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| IT | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| MC | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| PL | 31.05.2017 | ||
| PT | 31.05.2017 | ||
| RO | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| SI | 31.05.2017 | ||
| SK | 31.05.2017 | ||
| SM | 31.05.2017 | ||
| TR | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| IE | 24.01.2018 | ||
| LU | 24.01.2018 | ||
| MT | 24.01.2018 | ||
| BE | 31.01.2018 | ||
| CH | 31.01.2018 | ||
| LI | 31.01.2018 | ||
| Former [2020/28] | AT | 31.05.2017 | |
| CZ | 31.05.2017 | ||
| DK | 31.05.2017 | ||
| EE | 31.05.2017 | ||
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| IT | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| MC | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| PL | 31.05.2017 | ||
| PT | 31.05.2017 | ||
| RO | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| SI | 31.05.2017 | ||
| SK | 31.05.2017 | ||
| SM | 31.05.2017 | ||
| TR | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| IE | 24.01.2018 | ||
| LU | 24.01.2018 | ||
| MT | 24.01.2018 | ||
| BE | 31.01.2018 | ||
| CH | 31.01.2018 | ||
| LI | 31.01.2018 | ||
| Former [2020/15] | AT | 31.05.2017 | |
| CZ | 31.05.2017 | ||
| DK | 31.05.2017 | ||
| EE | 31.05.2017 | ||
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| IT | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| MC | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| PL | 31.05.2017 | ||
| RO | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| SI | 31.05.2017 | ||
| SK | 31.05.2017 | ||
| SM | 31.05.2017 | ||
| TR | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| IE | 24.01.2018 | ||
| LU | 24.01.2018 | ||
| MT | 24.01.2018 | ||
| BE | 31.01.2018 | ||
| CH | 31.01.2018 | ||
| LI | 31.01.2018 | ||
| Former [2020/08] | AT | 31.05.2017 | |
| CZ | 31.05.2017 | ||
| DK | 31.05.2017 | ||
| EE | 31.05.2017 | ||
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| IT | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| MC | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| PL | 31.05.2017 | ||
| RO | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| SI | 31.05.2017 | ||
| SK | 31.05.2017 | ||
| SM | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| IE | 24.01.2018 | ||
| LU | 24.01.2018 | ||
| MT | 24.01.2018 | ||
| BE | 31.01.2018 | ||
| CH | 31.01.2018 | ||
| LI | 31.01.2018 | ||
| Former [2019/30] | AT | 31.05.2017 | |
| CZ | 31.05.2017 | ||
| DK | 31.05.2017 | ||
| EE | 31.05.2017 | ||
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| IT | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| MC | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| PL | 31.05.2017 | ||
| RO | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| SI | 31.05.2017 | ||
| SK | 31.05.2017 | ||
| SM | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| IE | 24.01.2018 | ||
| LU | 24.01.2018 | ||
| BE | 31.01.2018 | ||
| CH | 31.01.2018 | ||
| LI | 31.01.2018 | ||
| Former [2019/09] | AT | 31.05.2017 | |
| CZ | 31.05.2017 | ||
| DK | 31.05.2017 | ||
| EE | 31.05.2017 | ||
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| IT | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| PL | 31.05.2017 | ||
| RO | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| SI | 31.05.2017 | ||
| SK | 31.05.2017 | ||
| SM | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| IE | 24.01.2018 | ||
| LU | 24.01.2018 | ||
| BE | 31.01.2018 | ||
| CH | 31.01.2018 | ||
| LI | 31.01.2018 | ||
| Former [2018/52] | AT | 31.05.2017 | |
| CZ | 31.05.2017 | ||
| DK | 31.05.2017 | ||
| EE | 31.05.2017 | ||
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| IT | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| PL | 31.05.2017 | ||
| RO | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| SI | 31.05.2017 | ||
| SK | 31.05.2017 | ||
| SM | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| LU | 24.01.2018 | ||
| BE | 31.01.2018 | ||
| CH | 31.01.2018 | ||
| LI | 31.01.2018 | ||
| Former [2018/50] | AT | 31.05.2017 | |
| CZ | 31.05.2017 | ||
| DK | 31.05.2017 | ||
| EE | 31.05.2017 | ||
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| IT | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| PL | 31.05.2017 | ||
| RO | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| SI | 31.05.2017 | ||
| SK | 31.05.2017 | ||
| SM | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| LU | 24.01.2018 | ||
| BE | 31.01.2018 | ||
| Former [2018/47] | AT | 31.05.2017 | |
| CZ | 31.05.2017 | ||
| DK | 31.05.2017 | ||
| EE | 31.05.2017 | ||
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| IT | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| PL | 31.05.2017 | ||
| RO | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| SI | 31.05.2017 | ||
| SK | 31.05.2017 | ||
| SM | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| LU | 24.01.2018 | ||
| Former [2018/25] | AT | 31.05.2017 | |
| CZ | 31.05.2017 | ||
| DK | 31.05.2017 | ||
| EE | 31.05.2017 | ||
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| IT | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| PL | 31.05.2017 | ||
| RO | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| SI | 31.05.2017 | ||
| SK | 31.05.2017 | ||
| SM | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| Former [2018/11] | AT | 31.05.2017 | |
| CZ | 31.05.2017 | ||
| DK | 31.05.2017 | ||
| EE | 31.05.2017 | ||
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| IT | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| PL | 31.05.2017 | ||
| RO | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| SK | 31.05.2017 | ||
| SM | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| Former [2018/10] | AT | 31.05.2017 | |
| CZ | 31.05.2017 | ||
| DK | 31.05.2017 | ||
| EE | 31.05.2017 | ||
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| RO | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| SK | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| Former [2018/09] | AT | 31.05.2017 | |
| DK | 31.05.2017 | ||
| EE | 31.05.2017 | ||
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| Former [2017/52] | AT | 31.05.2017 | |
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| Former [2017/50] | AT | 31.05.2017 | |
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| Former [2017/49] | AT | 31.05.2017 | |
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | Cited in | International search | [XI] INTEL CORPORATION: "Enhancements on MAC procedures to support CA with multiple TA", 3GPP DRAFT; R2-113214 MTA MAC, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG2, no. Barcelona, Spain; 20110509, 3 May 2011 (2011-05-03), XP050495381 [X] 1,3,5,11,13,16,18,21,23,25 * the whole document *[I] 2,4,6-10,12,14,15,17,19,20,22,24,26-30 | [A] "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical layer procedures (Release 11)", 3GPP STANDARD; 3GPP TS 36.213, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. V11.1.0, 20 December 2012 (2012-12-20), pages 1 - 160, XP050691223 [A] 1-30 * chapter 4; chapter 5.1 * |