blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3003892

EP3003892 - BAGS AND METHOD FOR MAKING SUCH BAGS [Right-click to bookmark this link]
Former [2016/15]BAG, METHOD FOR THE PRODUCTION OF A BAG AND MACHINE SYSTEM FOR THE PRODUCTION OF A BAG
[2019/48]
StatusNo opposition filed within time limit
Status updated on  19.02.2021
Database last updated on 02.09.2024
FormerThe patent has been granted
Status updated on  13.03.2020
FormerGrant of patent is intended
Status updated on  21.11.2019
FormerExamination is in progress
Status updated on  03.02.2017
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
Windmöller & Hölscher KG
Münsterstrasse 50
49525 Lengerich/Westf. / DE
[2016/15]
Inventor(s)01 / THIES, Jörg Christian
Am Telgenkamp 12
49201 Dissen / DE
 [2016/15]
Representative(s)(deleted)
[2020/16]
Former [2016/15]Vogel, Andreas, et al
Bals & Vogel Universitätsstrasse 142
44799 Bochum / DE
Application number, filing date14707363.926.02.2014
[2016/15]
WO2014EP53758
Priority number, dateDE20131010538124.05.2013         Original published format: DE102013105381
[2016/15]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2014187582
Date:27.11.2014
Language:DE
[2014/48]
Type: A1 Application with search report 
No.:EP3003892
Date:13.04.2016
Language:DE
The application published by WIPO in one of the EPO official languages on 27.11.2014 takes the place of the publication of the European patent application.
[2016/15]
Type: B1 Patent specification 
No.:EP3003892
Date:15.04.2020
Language:DE
[2020/16]
Search report(s)International search report - published on:EP27.11.2014
ClassificationIPC:B65D33/10
[2019/48]
CPC:
B65D33/105 (EP,US); B65D33/06 (US); B31B50/86 (EP,US);
B65D33/004 (US); B65D33/007 (US); B65D33/04 (US);
B31B2150/00 (EP,US); B31B2150/001 (EP,US); B31B2150/003 (EP,US);
B31B2160/20 (EP,US); B31B70/866 (EP,US) (-)
Former IPC [2016/15]B65D33/10, B31B1/86
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/15]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:BEUTEL SOWIE VERFAHREN ZUR HERSTELLUNG EINES BEUTELS[2019/48]
English:BAGS AND METHOD FOR MAKING SUCH BAGS[2019/48]
French:SAC D'EMBALLAGE ET PROCÉDÉ DE FABRICATION DE TELS SACS D'EMBALLAGE[2019/48]
Former [2016/15]BEUTEL, VERFAHREN ZUR HERSTELLUNG EINES BEUTELS SOWIE MASCHINENSYSTEM ZUR HERSTELLUNG EINES BEUTELS
Former [2016/15]BAG, METHOD FOR THE PRODUCTION OF A BAG AND MACHINE SYSTEM FOR THE PRODUCTION OF A BAG
Former [2016/15]SACHET, PROCÉDÉ SERVANT À FABRIQUER UN SACHET, ET SYSTÈME DE MACHINE SERVANT À FABRIQUER UN SACHET
Entry into regional phase04.01.2016National basic fee paid 
04.01.2016Designation fee(s) paid 
04.01.2016Examination fee paid 
Examination procedure18.12.2015Amendment by applicant (claims and/or description)
04.01.2016Examination requested  [2016/15]
01.02.2017Despatch of a communication from the examining division (Time limit: M04)
26.05.2017Reply to a communication from the examining division
06.07.2017Despatch of a communication from the examining division (Time limit: M04)
06.11.2017Reply to a communication from the examining division
23.01.2018Despatch of a communication from the examining division (Time limit: M04)
17.04.2018Reply to a communication from the examining division
16.07.2018Despatch of a communication from the examining division (Time limit: M04)
23.10.2018Reply to a communication from the examining division
04.03.2019Despatch of a communication from the examining division (Time limit: M04)
04.07.2019Reply to a communication from the examining division
22.11.2019Communication of intention to grant the patent
06.03.2020Fee for grant paid
06.03.2020Fee for publishing/printing paid
06.03.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  01.02.2017
Opposition(s)18.01.2021No opposition filed within time limit [2021/12]
Fees paidRenewal fee
29.02.2016Renewal fee patent year 03
28.02.2017Renewal fee patent year 04
28.02.2018Renewal fee patent year 05
28.02.2019Renewal fee patent year 06
10.01.2020Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU26.02.2014
AL15.04.2020
CY15.04.2020
CZ15.04.2020
DK15.04.2020
EE15.04.2020
ES15.04.2020
FI15.04.2020
HR15.04.2020
LT15.04.2020
LV15.04.2020
MC15.04.2020
MK15.04.2020
NL15.04.2020
PL15.04.2020
RO15.04.2020
RS15.04.2020
SE15.04.2020
SI15.04.2020
SK15.04.2020
SM15.04.2020
BG15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
[2024/22]
Former [2023/30]HU26.02.2014
AL15.04.2020
CY15.04.2020
CZ15.04.2020
DK15.04.2020
EE15.04.2020
ES15.04.2020
FI15.04.2020
HR15.04.2020
LT15.04.2020
LV15.04.2020
MC15.04.2020
NL15.04.2020
PL15.04.2020
RO15.04.2020
RS15.04.2020
SE15.04.2020
SI15.04.2020
SK15.04.2020
SM15.04.2020
BG15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2023/27]HU26.02.2014
AL15.04.2020
CZ15.04.2020
DK15.04.2020
EE15.04.2020
ES15.04.2020
FI15.04.2020
HR15.04.2020
LT15.04.2020
LV15.04.2020
MC15.04.2020
NL15.04.2020
PL15.04.2020
RO15.04.2020
RS15.04.2020
SE15.04.2020
SI15.04.2020
SK15.04.2020
SM15.04.2020
BG15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2021/41]AL15.04.2020
CZ15.04.2020
DK15.04.2020
EE15.04.2020
ES15.04.2020
FI15.04.2020
HR15.04.2020
LT15.04.2020
LV15.04.2020
MC15.04.2020
NL15.04.2020
PL15.04.2020
RO15.04.2020
RS15.04.2020
SE15.04.2020
SI15.04.2020
SK15.04.2020
SM15.04.2020
BG15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2021/24]AL15.04.2020
CZ15.04.2020
DK15.04.2020
EE15.04.2020
ES15.04.2020
FI15.04.2020
HR15.04.2020
LT15.04.2020
LV15.04.2020
NL15.04.2020
PL15.04.2020
RO15.04.2020
RS15.04.2020
SE15.04.2020
SI15.04.2020
SK15.04.2020
SM15.04.2020
BG15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2021/10]AL15.04.2020
CZ15.04.2020
DK15.04.2020
EE15.04.2020
ES15.04.2020
FI15.04.2020
HR15.04.2020
LT15.04.2020
LV15.04.2020
NL15.04.2020
PL15.04.2020
RO15.04.2020
RS15.04.2020
SE15.04.2020
SK15.04.2020
SM15.04.2020
BG15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2021/09]AL15.04.2020
CZ15.04.2020
DK15.04.2020
EE15.04.2020
ES15.04.2020
FI15.04.2020
HR15.04.2020
LT15.04.2020
LV15.04.2020
NL15.04.2020
RO15.04.2020
RS15.04.2020
SE15.04.2020
SM15.04.2020
BG15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2021/08]AL15.04.2020
DK15.04.2020
ES15.04.2020
FI15.04.2020
HR15.04.2020
LT15.04.2020
LV15.04.2020
NL15.04.2020
RO15.04.2020
RS15.04.2020
SE15.04.2020
SM15.04.2020
BG15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2021/04]AL15.04.2020
FI15.04.2020
HR15.04.2020
LT15.04.2020
LV15.04.2020
NL15.04.2020
RS15.04.2020
SE15.04.2020
BG15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2021/01]FI15.04.2020
HR15.04.2020
LT15.04.2020
LV15.04.2020
NL15.04.2020
RS15.04.2020
SE15.04.2020
BG15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2020/51]FI15.04.2020
HR15.04.2020
LT15.04.2020
LV15.04.2020
NL15.04.2020
RS15.04.2020
SE15.04.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2020/50]FI15.04.2020
HR15.04.2020
LT15.04.2020
LV15.04.2020
NL15.04.2020
SE15.04.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2020/48]FI15.04.2020
LT15.04.2020
NL15.04.2020
SE15.04.2020
NO15.07.2020
IS15.08.2020
PT17.08.2020
Former [2020/47]LT15.04.2020
NO15.07.2020
IS15.08.2020
Former [2020/46]IS15.08.2020
Cited inInternational search[XI]US2985355  (READ ROBERT E) [X] 1,32 * column 4, line 60 - column 10, line 74; figures 1-15; claims 1,2,5,6 * [I] 2-31;
 [A]FR1370903  (WINDMOLLER & HOLSCHER FA) [A] 1,17-32* figures 2,8,15a,15b,16,17 *;
 [A]DE4238655  (WINDMOELLER & HOELSCHER [DE]) [A] 1,17-32 * abstract * * column 2, line 44 - column 3, line 33 *;
 [A]DE9403188U  (BISCHOF & KLEIN [DE]) [A] 1-16,32 * page 7, line 7 - page 10, paragraph 2; figures 1-5 *;
 [AD]EP0781710  (FISCHER & KRECKE GMBH & CO [DE]) [AD] 1-16,32 * abstract *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.