EP2994401 - TUBULAR CONVEYOR BELT OR POCKET CONVEYOR BELT HAVING A CHEVRON PROFILE (ANGLED-CAM PROFILE) OF THE CARRYING-SIDE COVER PLATE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.03.2020 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 05.04.2019 | ||
Former | Grant of patent is intended Status updated on 18.12.2018 | ||
Former | Examination is in progress Status updated on 21.07.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states ContiTech Transportbandsysteme GmbH Vahrenwalder Strasse 9 30165 Hannover / DE | [2016/11] | Inventor(s) | 01 /
MINKIN, Andrey Herman Hanker Str. 17b 37083 Göttingen / DE | [2016/11] | Representative(s) | Finger, Karsten Continental Aktiengesellschaft Patente und Lizenzen Postfach 169 30001 Hannover / DE | [2016/11] | Application number, filing date | 14708253.1 | 06.03.2014 | [2016/11] | WO2014EP54296 | Priority number, date | DE201310104595 | 06.05.2013 Original published format: DE102013104595 | DE201310106479 | 21.06.2013 Original published format: DE102013106479 | [2016/11] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2014180585 | Date: | 13.11.2014 | Language: | DE | [2014/46] | Type: | A1 Application with search report | No.: | EP2994401 | Date: | 16.03.2016 | Language: | DE | The application published by WIPO in one of the EPO official languages on 13.11.2014 takes the place of the publication of the European patent application. | [2016/11] | Type: | B1 Patent specification | No.: | EP2994401 | Date: | 08.05.2019 | Language: | DE | [2019/19] | Search report(s) | International search report - published on: | EP | 13.11.2014 | Classification | IPC: | B65G15/40, B65G15/42, B65G15/08 | [2016/11] | CPC: |
B65G15/42 (EP,US);
B65G15/08 (EP,US);
B65G15/40 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/11] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ROHRFÖRDERGURT ODER TASCHENFÖRDERGURT MIT CHEVRON-PROFILIERUNG (SCHRÄGNOCKEN-PROFILIERUNG) DER TRAGSEITIGEN DECKPLATTE | [2016/11] | English: | TUBULAR CONVEYOR BELT OR POCKET CONVEYOR BELT HAVING A CHEVRON PROFILE (ANGLED-CAM PROFILE) OF THE CARRYING-SIDE COVER PLATE | [2016/11] | French: | BANDE TRANSPORTEUSE TUBULAIRE OU BANDE TRANSPORTEUSE À POCHE DONT LA PLAQUE DE RECOUVREMENT CÔTÉ SUPPORT PRÉSENTE DES PROFILÉS EN CHEVRONS (PROFILÉS EN CAMES OBLIQUES) | [2016/11] | Entry into regional phase | 07.12.2015 | National basic fee paid | 07.12.2015 | Designation fee(s) paid | 07.12.2015 | Examination fee paid | Examination procedure | 07.12.2015 | Examination requested [2016/11] | 15.06.2016 | Amendment by applicant (claims and/or description) | 21.07.2017 | Despatch of a communication from the examining division (Time limit: M06) | 29.01.2018 | Reply to a communication from the examining division | 22.11.2018 | Date of oral proceedings | 14.12.2018 | Minutes of oral proceedings despatched | 19.12.2018 | Communication of intention to grant the patent | 22.03.2019 | Fee for grant paid | 22.03.2019 | Fee for publishing/printing paid | 22.03.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 21.07.2017 | Opposition(s) | 11.02.2020 | No opposition filed within time limit [2020/16] | Fees paid | Renewal fee | 31.03.2016 | Renewal fee patent year 03 | 31.03.2017 | Renewal fee patent year 04 | 03.04.2018 | Renewal fee patent year 05 | 01.04.2019 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 06.03.2014 | AL | 08.05.2019 | CY | 08.05.2019 | CZ | 08.05.2019 | DK | 08.05.2019 | EE | 08.05.2019 | ES | 08.05.2019 | FI | 08.05.2019 | HR | 08.05.2019 | IT | 08.05.2019 | LT | 08.05.2019 | LV | 08.05.2019 | MC | 08.05.2019 | MK | 08.05.2019 | MT | 08.05.2019 | NL | 08.05.2019 | PL | 08.05.2019 | RO | 08.05.2019 | RS | 08.05.2019 | SE | 08.05.2019 | SI | 08.05.2019 | SK | 08.05.2019 | SM | 08.05.2019 | TR | 08.05.2019 | BG | 08.08.2019 | NO | 08.08.2019 | GR | 09.08.2019 | IS | 08.09.2019 | PT | 08.09.2019 | [2022/31] |
Former [2022/30] | HU | 06.03.2014 | |
AL | 08.05.2019 | ||
CY | 08.05.2019 | ||
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
IT | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
MC | 08.05.2019 | ||
MT | 08.05.2019 | ||
NL | 08.05.2019 | ||
PL | 08.05.2019 | ||
RO | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
SI | 08.05.2019 | ||
SK | 08.05.2019 | ||
SM | 08.05.2019 | ||
TR | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
IS | 08.09.2019 | ||
PT | 08.09.2019 | ||
Former [2022/27] | HU | 06.03.2014 | |
AL | 08.05.2019 | ||
CY | 08.05.2019 | ||
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
IT | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
MC | 08.05.2019 | ||
MT | 08.05.2019 | ||
NL | 08.05.2019 | ||
PL | 08.05.2019 | ||
RO | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
SI | 08.05.2019 | ||
SK | 08.05.2019 | ||
SM | 08.05.2019 | ||
TR | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2020/50] | AL | 08.05.2019 | |
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
IT | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
MC | 08.05.2019 | ||
NL | 08.05.2019 | ||
PL | 08.05.2019 | ||
RO | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
SI | 08.05.2019 | ||
SK | 08.05.2019 | ||
SM | 08.05.2019 | ||
TR | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2020/25] | AL | 08.05.2019 | |
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
IT | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
PL | 08.05.2019 | ||
RO | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
SI | 08.05.2019 | ||
SK | 08.05.2019 | ||
SM | 08.05.2019 | ||
TR | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2020/17] | AL | 08.05.2019 | |
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
IT | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
RO | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
SK | 08.05.2019 | ||
SM | 08.05.2019 | ||
TR | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2020/14] | AL | 08.05.2019 | |
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
IT | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
RO | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
SK | 08.05.2019 | ||
SM | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2020/12] | AL | 08.05.2019 | |
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
IT | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
RO | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
SK | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2020/11] | AL | 08.05.2019 | |
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
RO | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
SK | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2020/10] | AL | 08.05.2019 | |
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
RO | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2020/09] | AL | 08.05.2019 | |
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2019/51] | AL | 08.05.2019 | |
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2019/50] | AL | 08.05.2019 | |
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2019/49] | AL | 08.05.2019 | |
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
LT | 08.05.2019 | ||
NL | 08.05.2019 | ||
SE | 08.05.2019 | ||
NO | 08.08.2019 | ||
PT | 08.09.2019 | ||
Former [2019/48] | ES | 08.05.2019 | |
FI | 08.05.2019 | ||
LT | 08.05.2019 | ||
SE | 08.05.2019 | ||
NO | 08.08.2019 | ||
PT | 08.09.2019 | ||
Former [2019/47] | ES | 08.05.2019 | |
FI | 08.05.2019 | ||
LT | 08.05.2019 | ||
NO | 08.08.2019 | Cited in | International search | [A]US810510 (ROBINS THOMAS JR [US]) [A] 8-10 * pages 1-5; figures 1-11 *; | [A]DE920477 (CONTINENTAL GUMMI WERKE AG) [A] 7* pages 1,2; figures 1-3 *; | [A]DE1182593 (KLEBER COLOMBES) [A] 1,11 * columns 1-4; figures 1-4 *; | [Y]JPS5883314U (-) [Y] 1-12 * figures 1-11 *; | [A]DE29720710U (HEISSENBERGER & PRETZLER GMBH [AT]) [A] 7 * pages 1-8; figures 1-7 *; | [A]US2001045344 (TSCHANTZ RICHARD W [US]) [A] 1 * pages 1-5; figures 1-14 *; | [A]JP2002370812 (BANDO CHEMICAL IND) [A] 1,5,6 * abstract *; | [Y]WO2004037689 (BRIDGESTONE CORP [JP], et al) [Y] 1-12 * abstract * |