EP2976279 - DEVICE FOR EJECTING A FLAT OBJECT DURING CONVEYING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 31.05.2019 Database last updated on 20.07.2024 | |
Former | The patent has been granted Status updated on 22.06.2018 | ||
Former | Grant of patent is intended Status updated on 16.06.2018 | ||
Former | Examination is in progress Status updated on 23.05.2018 | ||
Former | Grant of patent is intended Status updated on 25.04.2018 | ||
Former | Examination is in progress Status updated on 25.11.2016 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states BOBST MEX SA Route de Faraz 3 1031 Mex / CH | [2016/04] | Inventor(s) | 01 /
BRIZZI, Nicolas Rue Bonne-de-Bourbon 10 CH-1920 Martigny / CH | [2016/04] | Representative(s) | Ehnle, Marcus Bobst Mex SA Case postale 1001 Lausanne / CH | [2018/30] |
Former [2016/04] | Ehnle, Marcus Bobst Mex SA Case postale CH-1001 Lausanne / CH | Application number, filing date | 14710189.3 | 06.03.2014 | [2016/04] | WO2014EP00580 | Priority number, date | EP20130001359 | 18.03.2013 Original published format: EP 13001359 | [2016/04] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2014146757 | Date: | 25.09.2014 | Language: | FR | [2014/39] | Type: | A1 Application with search report | No.: | EP2976279 | Date: | 27.01.2016 | Language: | FR | The application published by WIPO in one of the EPO official languages on 25.09.2014 takes the place of the publication of the European patent application. | [2016/04] | Type: | B1 Patent specification | No.: | EP2976279 | Date: | 25.07.2018 | Language: | FR | [2018/30] | Search report(s) | International search report - published on: | EP | 25.09.2014 | Classification | IPC: | B65H29/12, B65H29/62, B65G47/64, B65H29/58 | [2018/18] | CPC: |
B65H29/12 (EP,US);
B65G47/647 (EP,US);
B65H29/585 (EP,US);
B65H29/62 (EP,US);
B65G2201/022 (EP,US);
B65H2402/31 (EP,US);
B65H2404/2532 (EP,US);
B65H2404/2613 (EP,US);
B65H2404/2691 (EP,US);
B65H2701/1762 (EP,US)
(-)
|
Former IPC [2016/04] | B65H29/12, B65H29/62, B65G47/64 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/04] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VORRICHTUNG ZUM AUSSTOSSEN EINES FLACHEN GEGENSTANDES WÄHREND DER FÖRDERUNG | [2016/04] | English: | DEVICE FOR EJECTING A FLAT OBJECT DURING CONVEYING | [2016/04] | French: | DISPOSITIF D'EJECTION D'UN OBJET PLAT EN COURS DE CONVOYAGE | [2016/04] | Entry into regional phase | 11.09.2015 | National basic fee paid | 11.09.2015 | Designation fee(s) paid | 11.09.2015 | Examination fee paid | Examination procedure | 11.09.2015 | Examination requested [2016/04] | 27.04.2016 | Amendment by applicant (claims and/or description) | 29.11.2016 | Despatch of a communication from the examining division (Time limit: M04) | 07.04.2017 | Reply to a communication from the examining division | 31.08.2017 | Despatch of a communication from the examining division (Time limit: M04) | 21.12.2017 | Reply to a communication from the examining division | 26.04.2018 | Communication of intention to grant the patent | 22.05.2018 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 22.05.2018 | Fee for grant paid | 22.05.2018 | Fee for publishing/printing paid | 11.06.2018 | Communication of intention to grant the patent | 14.06.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 29.11.2016 | Opposition(s) | 26.04.2019 | No opposition filed within time limit [2019/27] | Fees paid | Renewal fee | 04.03.2016 | Renewal fee patent year 03 | 09.03.2017 | Renewal fee patent year 04 | 08.03.2018 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 06.03.2014 | AL | 25.07.2018 | AT | 25.07.2018 | CY | 25.07.2018 | CZ | 25.07.2018 | DK | 25.07.2018 | EE | 25.07.2018 | FI | 25.07.2018 | HR | 25.07.2018 | LT | 25.07.2018 | LV | 25.07.2018 | MC | 25.07.2018 | MK | 25.07.2018 | MT | 25.07.2018 | NL | 25.07.2018 | PL | 25.07.2018 | RO | 25.07.2018 | RS | 25.07.2018 | SE | 25.07.2018 | SI | 25.07.2018 | SM | 25.07.2018 | BG | 25.10.2018 | NO | 25.10.2018 | GR | 26.10.2018 | IS | 25.11.2018 | PT | 25.11.2018 | IE | 06.03.2019 | LU | 06.03.2019 | BE | 31.03.2019 | [2022/31] |
Former [2021/32] | HU | 06.03.2014 | |
AL | 25.07.2018 | ||
AT | 25.07.2018 | ||
CY | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
MT | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SM | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
PT | 25.11.2018 | ||
IE | 06.03.2019 | ||
LU | 06.03.2019 | ||
BE | 31.03.2019 | ||
Former [2021/26] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CY | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
MT | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SM | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
PT | 25.11.2018 | ||
IE | 06.03.2019 | ||
LU | 06.03.2019 | ||
BE | 31.03.2019 | ||
Former [2020/29] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
MT | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SM | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
PT | 25.11.2018 | ||
IE | 06.03.2019 | ||
LU | 06.03.2019 | ||
BE | 31.03.2019 | ||
Former [2020/12] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SM | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
IE | 06.03.2019 | ||
LU | 06.03.2019 | ||
BE | 31.03.2019 | ||
Former [2020/09] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SM | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
IE | 06.03.2019 | ||
LU | 06.03.2019 | ||
Former [2020/01] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SM | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
LU | 06.03.2019 | ||
Former [2019/46] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SM | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/37] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SM | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/26] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SM | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/24] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
EE | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/22] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
CZ | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/12] | AL | 25.07.2018 | |
AT | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/11] | AT | 25.07.2018 | |
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
LT | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/10] | AT | 25.07.2018 | |
FI | 25.07.2018 | ||
LT | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/08] | FI | 25.07.2018 | |
LT | 25.07.2018 | ||
NL | 25.07.2018 | ||
NO | 25.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/07] | LT | 25.07.2018 | |
NL | 25.07.2018 | ||
Former [2019/04] | NL | 25.07.2018 | Cited in | International search | [XAI]US4324522 (BUCCICONE VELIO S) [X] 1-8,10,12-14 * column 3, line 29 - line 49; figure - * [A] 11 [I] 9; | [A]EP2316766 (WILHELM BAHMUELLER MASCHB PRAEZ SWERKZEUGE GMBH [DE]) [A] 9 * the whole document *; | [A]DE2857565 (WINDMOELLER & HOELSCHER) [A] 1 * the whole document *; | [A]EP0884262 (BOBST SA [CH]) [A] 1 * abstract * | Examination | JPS4931776U | JPS5688065 | JPS55176230U | JPS5799860U | EP2554278 | GB858463 |