EP2965425 - VOLTAGE LEVEL SHIFTER WITH A LOW-LATENCY VOLTAGE BOOST CIRCUIT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 28.08.2020 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 20.09.2019 | ||
Former | Grant of patent is intended Status updated on 06.05.2019 | ||
Former | Examination is in progress Status updated on 16.03.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Qualcomm Incorporated 5775 Morehouse Drive San Diego, CA 92121-1714 / US | [2016/02] | Inventor(s) | 01 /
RAJAEE, Omid 5775 Morehouse Drive San Diego, California 92121-1714 / US | 02 /
ZHENG, Wei 5775 Morehouse Drive San Diego, California 92121-1714 / US | 03 /
ALLADI, Dinesh Jagannath 5775 Morehouse Drive San Diego, California 92121-1714 / US | 04 /
GUO, Yuhua 5775 Morehouse Drive San Diego, California 92121-1714 / US | [2016/02] | Representative(s) | Wimmer, Hubert Wagner & Geyer Partnerschaft mbB Patent- und Rechtsanwälte Gewürzmühlstrasse 5 80538 München / DE | [2019/43] |
Former [2016/02] | Wimmer, Hubert WAGNER & GEYER Gewürzmühlstrasse 5 80538 München / DE | Application number, filing date | 14711409.4 | 04.03.2014 | [2016/02] | WO2014US20238 | Priority number, date | US201313787590 | 06.03.2013 Original published format: US201313787590 | [2016/02] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014138033 | Date: | 12.09.2014 | Language: | EN | [2014/37] | Type: | A1 Application with search report | No.: | EP2965425 | Date: | 13.01.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 12.09.2014 takes the place of the publication of the European patent application. | [2016/02] | Type: | B1 Patent specification | No.: | EP2965425 | Date: | 23.10.2019 | Language: | EN | [2019/43] | Search report(s) | International search report - published on: | EP | 12.09.2014 | Classification | IPC: | H03K3/356, H03K19/0185, H03K19/017, H03K5/156 | [2019/20] | CPC: |
H03K5/1565 (EP,US);
H03K19/01714 (EP,US);
H03K19/018521 (EP,US);
H03K3/012 (US);
H03K3/35613 (EP,US);
H03L5/00 (US)
|
Former IPC [2016/02] | H03K3/356, H03K19/0185, H03K19/017 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/02] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SPANNUNGSPEGELTRENNER MIT EINER SPANNUNGSERHÖHUNGSSCHALTUNG MIT NIEDRIGER LATENZ | [2016/02] | English: | VOLTAGE LEVEL SHIFTER WITH A LOW-LATENCY VOLTAGE BOOST CIRCUIT | [2016/02] | French: | DISPOSITIF DE DÉCALAGE DE NIVEAU DE TENSION DOTÉ D'UN CIRCUIT SURVOLTEUR À FAIBLE TEMPS D'ATTENTE | [2016/02] | Entry into regional phase | 11.08.2015 | National basic fee paid | 11.08.2015 | Designation fee(s) paid | 11.08.2015 | Examination fee paid | Examination procedure | 11.08.2015 | Examination requested [2016/02] | 22.04.2016 | Amendment by applicant (claims and/or description) | 15.03.2018 | Despatch of a communication from the examining division (Time limit: M04) | 25.07.2018 | Reply to a communication from the examining division | 26.02.2019 | Despatch of a communication from the examining division (Time limit: M01) | 26.03.2019 | Reply to a communication from the examining division | 07.05.2019 | Communication of intention to grant the patent | 12.09.2019 | Fee for grant paid | 12.09.2019 | Fee for publishing/printing paid | 12.09.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 15.03.2018 | Opposition(s) | 24.07.2020 | No opposition filed within time limit [2020/40] | Fees paid | Renewal fee | 14.01.2016 | Renewal fee patent year 03 | 07.03.2017 | Renewal fee patent year 04 | 08.03.2018 | Renewal fee patent year 05 | 08.03.2019 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 04.03.2014 | AL | 23.10.2019 | AT | 23.10.2019 | CY | 23.10.2019 | CZ | 23.10.2019 | DK | 23.10.2019 | EE | 23.10.2019 | ES | 23.10.2019 | FI | 23.10.2019 | HR | 23.10.2019 | IT | 23.10.2019 | LT | 23.10.2019 | LV | 23.10.2019 | MC | 23.10.2019 | MK | 23.10.2019 | MT | 23.10.2019 | NL | 23.10.2019 | PL | 23.10.2019 | RO | 23.10.2019 | RS | 23.10.2019 | SE | 23.10.2019 | SI | 23.10.2019 | SK | 23.10.2019 | SM | 23.10.2019 | TR | 23.10.2019 | BG | 23.01.2020 | NO | 23.01.2020 | GR | 24.01.2020 | IS | 23.02.2020 | PT | 24.02.2020 | IE | 04.03.2020 | LU | 04.03.2020 | BE | 31.03.2020 | CH | 31.03.2020 | LI | 31.03.2020 | [2022/32] |
Former [2022/27] | HU | 04.03.2014 | |
AL | 23.10.2019 | ||
AT | 23.10.2019 | ||
CY | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
MT | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
TR | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
IE | 04.03.2020 | ||
LU | 04.03.2020 | ||
BE | 31.03.2020 | ||
CH | 31.03.2020 | ||
LI | 31.03.2020 | ||
Former [2021/12] | AL | 23.10.2019 | |
AT | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
IE | 04.03.2020 | ||
LU | 04.03.2020 | ||
BE | 31.03.2020 | ||
CH | 31.03.2020 | ||
LI | 31.03.2020 | ||
Former [2021/07] | AL | 23.10.2019 | |
AT | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
IE | 04.03.2020 | ||
LU | 04.03.2020 | ||
CH | 31.03.2020 | ||
LI | 31.03.2020 | ||
Former [2021/04] | AL | 23.10.2019 | |
AT | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
LU | 04.03.2020 | ||
Former [2020/50] | AL | 23.10.2019 | |
AT | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/38] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/37] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/36] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/35] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/32] | AL | 23.10.2019 | |
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/25] | ES | 23.10.2019 | |
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/24] | ES | 23.10.2019 | |
FI | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/23] | ES | 23.10.2019 | |
FI | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
PT | 24.02.2020 | ||
Former [2020/22] | FI | 23.10.2019 | |
LT | 23.10.2019 | ||
NL | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
PT | 24.02.2020 | ||
Former [2020/21] | NL | 23.10.2019 | |
NO | 23.01.2020 | ||
Former [2020/20] | NL | 23.10.2019 | Cited in | International search | [XI]US2002180508 (KANNO YUSUKE [JP], et al) [X] 1-7,10-20 * paragraphs [0055] - [0059] - [0069] - [0070]; figures 1,2 * [I] 8,9; | [XAI]US2007001743 (WEI DERRICK C [US], et al) [X] 1-7,10,14-20 * paragraphs [0044] , [0045]; figures 6,7,8 * [A] 11-13 [I] 8,9; | [XAI]JP2007311906 (ASAHI KASEI DENSHI KK) [X] 1-7,10,14-20 * figures 8,9 * [A] 11-13 [I] 8,9 | Examination | US2011063012 | by applicant | US6288591 | US7777547 |