blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3117095

EP3117095 - CONTROL OF A GROUP OF WIND TURBINES [Right-click to bookmark this link]
StatusThe patent has been granted
Status updated on  10.07.2020
Database last updated on 03.10.2024
FormerGrant of patent is intended
Status updated on  08.04.2020
FormerExamination is in progress
Status updated on  09.02.2018
FormerRequest for examination was made
Status updated on  16.12.2016
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024 [2024/41]
Applicant(s)For all designated states
Vestas Wind Systems A/S
Hedeager 42
8200 Aarhus N / DK
[2017/03]
Inventor(s)01 / SPRUCE, Chris
Red Roofs
58 Dorking Road
Leatherhead Surrey KT23 4PD / GB
02 / HALES, Kelvin
16 Rusham Park Avenue
Egham Surrey TW20 9NB / GB
 [2017/03]
Representative(s)Vestas Patents Department
Hedeager 42
8200 Aarhus N / DK
[2017/03]
Application number, filing date14711676.813.03.2014
[2017/03]
WO2014DK50060
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015135547
Date:17.09.2015
Language:EN
[2015/37]
Type: A1 Application with search report 
No.:EP3117095
Date:18.01.2017
Language:EN
The application published by WIPO in one of the EPO official languages on 17.09.2015 takes the place of the publication of the European patent application.
[2017/03]
Type: B1 Patent specification 
No.:EP3117095
Date:12.08.2020
Language:EN
[2020/33]
Search report(s)International search report - published on:EP17.09.2015
ClassificationIPC:F03D7/02, F03D7/04
[2017/03]
CPC:
F03D7/0292 (EP,US); F03D7/0284 (US); F03D7/048 (EP,US);
G05B19/042 (US); F05B2220/706 (EP,US); F05B2240/21 (EP,US);
F05B2240/50 (EP,US); F05B2240/912 (EP,US); F05B2260/40 (EP,US);
F05B2270/337 (EP,US); G05B2219/2619 (US); Y02E10/72 (EP,US);
Y02E10/728 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/03]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:STEUERUNG EINER GRUPPE VON WINDKRAFTANLAGEN[2020/18]
English:CONTROL OF A GROUP OF WIND TURBINES[2017/03]
French:CONTRÔLE D'UN GROUPE D'ÉOLIENNES[2020/18]
Former [2017/03]STEUERUNG EINER GRUPPE VON WINDTURBINEN
Former [2017/03]COMMANDE D'UN GROUPE D'ÉOLIENNES
Entry into regional phase12.09.2016National basic fee paid 
12.09.2016Designation fee(s) paid 
12.09.2016Examination fee paid 
Examination procedure12.09.2016Examination requested  [2017/03]
12.09.2016Date on which the examining division has become responsible
17.05.2017Amendment by applicant (claims and/or description)
12.02.2018Despatch of a communication from the examining division (Time limit: M06)
21.08.2018Reply to a communication from the examining division
07.06.2019Despatch of a communication from the examining division (Time limit: M06)
04.12.2019Reply to a communication from the examining division
09.04.2020Communication of intention to grant the patent
02.07.2020Fee for grant paid
02.07.2020Fee for publishing/printing paid
02.07.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  12.02.2018
Opposition(s)Opponent(s)01  12.05.2021  06.10.2022  WITHDRAWN
SUZLON Energy Ltd.
Kühnehöfe 3a
22761 Hamburg / DE
 [2022/45]
Former [2021/25]
Opponent(s)01  12.05.2021   
SUZLON Energy Ltd.
Kühnehöfe 3a
22761 Hamburg / DE
31.05.2021Invitation to proprietor to file observations on the notice of opposition
27.09.2021Reply of patent proprietor to notice(s) of opposition
07.10.2022Cancellation of oral proceeding that was planned for 07.12.2022
14.10.2022Despatch of communication that the opposition procedure will be closed
24.10.2022Legal effect of closure of opposition procedure [2023/10]
07.12.2022Date of oral proceedings
Fees paidRenewal fee
12.09.2016Renewal fee patent year 03
24.03.2017Renewal fee patent year 04
29.03.2018Renewal fee patent year 05
29.03.2019Renewal fee patent year 06
27.03.2020Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU13.03.2014
AL12.08.2020
AT12.08.2020
CY12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
MK12.08.2020
MT12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
PT14.12.2020
IE13.03.2021
LU13.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
[2024/41]
Former [2024/22]HU13.03.2014
AL12.08.2020
AT12.08.2020
CY12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
MK12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
PT14.12.2020
IE13.03.2021
LU13.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2023/30]HU13.03.2014
AL12.08.2020
AT12.08.2020
CY12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
PT14.12.2020
IE13.03.2021
LU13.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2023/27]HU13.03.2014
AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
PT14.12.2020
IE13.03.2021
LU13.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2023/20]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
PT14.12.2020
IE13.03.2021
LU13.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2022/34]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
IE13.03.2021
LU13.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2022/11]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
IE13.03.2021
LU13.03.2021
CH31.03.2021
LI31.03.2021
Former [2022/09]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
IE13.03.2021
LU13.03.2021
Former [2022/07]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
IE13.03.2021
Former [2021/45]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/36]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/34]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/28]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/25]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/24]AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/23]CZ12.08.2020
DK12.08.2020
EE12.08.2020
FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/22]CZ12.08.2020
DK12.08.2020
EE12.08.2020
FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/21]DK12.08.2020
FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RS12.08.2020
SE12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/12]FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RS12.08.2020
SE12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/10]FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
PL12.08.2020
RS12.08.2020
SE12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/09]FI12.08.2020
LT12.08.2020
SE12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
Former [2021/08]FI12.08.2020
LT12.08.2020
SE12.08.2020
BG12.11.2020
NO12.11.2020
Former [2021/07]FI12.08.2020
LT12.08.2020
NO12.11.2020
Cited inInternational search[A]US2007124025  (SCHRAM CHRISTIAN [DE], et al) [A] 1,12,13 * paragraphs [0011] , [0029] *;
 [XI]US2011140428  (WAKATA DAISUKE [JP], et al) [X] 1-5,10,12,13 * paragraphs [0016] , [0017] , [0 49] - [0080]; figure - * [I] 6-9,11;
 [A]WO2013000473  (VESTAS WIND SYS AS [DK], et al) [A] 1,12,13* page 14, line 3 - line 19; figure 4 *
OppositionUS2007124025
 US2011140428
 WO2013000473
 WO2013044925
 CN103595076
 DE102013002662
    - Danish Energinet, "Technical Regulation 3.2.5 for wind power plants with a power output greater than 11 kW", Document no. 55986/10, Technical Regulation 3.2.5, (20100930), pages 1 - 74, XP055489818
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.