blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2972584

EP2972584 - ENHANCED RESOLUTION DLP PROJECTOR APPARATUS AND METHOD OF USING SAME [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  04.03.2022
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  26.03.2021
FormerGrant of patent is intended
Status updated on  05.11.2020
FormerExamination is in progress
Status updated on  16.09.2019
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
Stratasys Ltd.
2 Holzman Street
3rd Floor, Kiryat Weizmann Science Park
7670402 Rehovot / IL
[2016/03]
Inventor(s)01 / MILLER, Gershon
1 Hafetz Hayim Street
7621783 Rehovot / IL
 [2016/03]
Representative(s)Pearl Cohen Zedek Latzer Baratz UK LLP
The Gridiron Building
One Pancras Square
London N1C 4AG / GB
[2021/17]
Former [2016/03]Pearl Cohen Zedek Latzer Baratz UK LLP
The Gridiron Building
One Pancras Square
London N1C 4AG / GB
Application number, filing date14717485.813.03.2014
[2016/03]
WO2014IL50275
Priority number, dateUS201361782475P14.03.2013         Original published format: US 201361782475 P
[2016/03]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO2014141272
Date:18.09.2014
Language:EN
[2014/38]
Type: A2 Application without search report 
No.:EP2972584
Date:20.01.2016
Language:EN
The application published by WIPO in one of the EPO official languages on 18.09.2014 takes the place of the publication of the European patent application.
[2016/03]
Type: B1 Patent specification 
No.:EP2972584
Date:28.04.2021
Language:EN
[2021/17]
Search report(s)International search report - published on:EP06.11.2014
ClassificationIPC:B33Y40/00, G02B26/08, G03B21/50, G03B21/20, H04N9/31, G03B21/00
[2020/36]
CPC:
G02B26/0833 (EP,US); B29C64/129 (US); B29C64/135 (US);
B29C64/282 (US); B33Y30/00 (US); G03B21/2013 (EP,US);
G03B21/2033 (EP,US); G03F7/70058 (US); H04N9/3188 (EP,US);
B29C64/268 (EP,US); B29C64/277 (EP,US); G03B21/008 (EP,US) (-)
Former IPC [2016/03]G03B21/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/03]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:DLP-PROJEKTORVORRICHTUNG MIT VERBESSERTER AUFLÖSUNG UND VERFAHREN ZUR VERWENDUNG DAVON[2016/03]
English:ENHANCED RESOLUTION DLP PROJECTOR APPARATUS AND METHOD OF USING SAME[2016/03]
French:APPAREIL PROJECTEUR DLP À RÉSOLUTION AMÉLIORÉE ET SON PROCÉDÉ D'UTILISATION[2016/03]
Entry into regional phase14.10.2015National basic fee paid 
14.10.2015Designation fee(s) paid 
14.10.2015Examination fee paid 
Examination procedure14.10.2015Examination requested  [2016/03]
19.10.2015Amendment by applicant (claims and/or description)
19.09.2019Despatch of a communication from the examining division (Time limit: M06)
18.03.2020Reply to a communication from the examining division
29.04.2020Despatch of a communication from the examining division (Time limit: M04)
23.07.2020Reply to a communication from the examining division
06.11.2020Communication of intention to grant the patent
02.03.2021Fee for grant paid
02.03.2021Fee for publishing/printing paid
02.03.2021Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  19.09.2019
Opposition(s)31.01.2022No opposition filed within time limit [2022/14]
Fees paidRenewal fee
23.03.2016Renewal fee patent year 03
23.03.2017Renewal fee patent year 04
23.03.2018Renewal fee patent year 05
22.03.2019Renewal fee patent year 06
20.03.2020Renewal fee patent year 07
23.03.2021Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU13.03.2014
AL28.04.2021
AT28.04.2021
CY28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
MK28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
[2024/22]
Former [2024/20]HU13.03.2014
AL28.04.2021
AT28.04.2021
CY28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2024/18]HU13.03.2014
AL28.04.2021
AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/47]AL28.04.2021
AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/29]AL28.04.2021
AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/26]AL28.04.2021
AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/23]AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/10]AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
PT30.08.2021
IS22.12.2021
Former [2022/09]AT28.04.2021
CZ28.04.2021
DK28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/08]AT28.04.2021
CZ28.04.2021
DK28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RS28.04.2021
SE28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/07]AT28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RS28.04.2021
SE28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2021/52]AT28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RS28.04.2021
SE28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2021/51]AT28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
RS28.04.2021
SE28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2021/50]AT28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
SE28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
PT30.08.2021
Former [2021/49]AT28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
SE28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
Former [2021/47]AT28.04.2021
FI28.04.2021
LT28.04.2021
NL28.04.2021
BG28.07.2021
Former [2021/46]AT28.04.2021
FI28.04.2021
LT28.04.2021
Cited inInternational search[A]US6038067  (GEORGE JOHN S [US]) [A] 1-6* the whole document *;
 [A]EP2120455  (RICOH KK [JP]) [A] 1-6 * the whole document *;
 [A]US2010166430  (ALTEN STEVE [US]) [A] 1-6 * the whole document *;
 [XI]US2010328626  (MIYAZAKI TAKESHI [JP]) [X] 1 * the whole document * [I] 2-6
by applicantUS2005129941
 US6923634
 US2006023065
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.