blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2994576

EP2994576 - BLOCK, FLOOD PROTECTION BARRIER AND A METHOD FOR PRODUCING A BARRIER OF THIS TYPE [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  18.12.2020
Database last updated on 26.06.2024
FormerExamination is in progress
Status updated on  02.12.2016
Most recent event   Tooltip18.12.2020Application deemed to be withdrawnpublished on 20.01.2021  [2021/03]
Applicant(s)For all designated states
Resco Consulting GmbH
Hauptstraße 151
8141 Unterpremstätten / AT
[2016/11]
Inventor(s)01 / SCHERCKL, Helmut
sausal 216
A-8443 Pistorf / AT
 [2016/11]
Representative(s)Hübscher & Partner Patentanwälte GmbH
Spittelwiese 4
4020 Linz / AT
[N/P]
Application number, filing date14723687.123.04.2014
[2016/11]
WO2014AT50102
Priority number, dateAT2013005030806.05.2013         Original published format: AT 503082013
[2016/11]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2014179823
Date:13.11.2014
Language:DE
[2014/46]
Type: A1 Application with search report 
No.:EP2994576
Date:16.03.2016
Language:DE
The application published by WIPO in one of the EPO official languages on 13.11.2014 takes the place of the publication of the European patent application.
[2016/11]
Search report(s)International search report - published on:EP13.11.2014
ClassificationIPC:E02B3/14, E02B3/06, E04B2/08, E02D29/02
[2016/11]
CPC:
E02B3/14 (EP,US); E04C1/39 (AT); E02B3/10 (US);
E02B3/08 (AT); E02B3/106 (EP,US); E02B7/10 (US);
E04B2/08 (EP,AT,US); E04C1/00 (US); E04C1/395 (EP,US);
E04B2002/0206 (EP,US); E04B2002/0228 (EP,US); E04B2002/0234 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/11]
Extension statesBA30.11.2015
ME30.11.2015
TitleGerman:STEIN, HOCHWASSERDAMM SOWIE VERFAHREN ZUR HERSTELLUNG EINES SOLCHEN[2016/11]
English:BLOCK, FLOOD PROTECTION BARRIER AND A METHOD FOR PRODUCING A BARRIER OF THIS TYPE[2016/11]
French:BLOC, LEVÉE DE PROTECTION CONTRE LES INONDATIONS ET PROCÉDÉ DE PRODUCTION CORRESPONDANT[2016/11]
Entry into regional phase30.11.2015National basic fee paid 
30.11.2015Designation fee(s) paid 
30.11.2015Examination fee paid 
Examination procedure30.11.2015Examination requested  [2016/11]
11.07.2016Amendment by applicant (claims and/or description)
02.12.2016Invitation to indicate the basis for amendments (Time limit: M01)
29.12.2016Reply to an invitation to indicate the basis for amendments
14.04.2020Despatch of a communication from the examining division (Time limit: M04)
25.08.2020Application deemed to be withdrawn, date of legal effect  [2021/03]
15.09.2020Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time  [2021/03]
Fees paidRenewal fee
10.06.2016Renewal fee patent year 03
28.04.2017Renewal fee patent year 04
12.04.2018Renewal fee patent year 05
29.04.2019Renewal fee patent year 06
Penalty fee
Additional fee for renewal fee
30.04.201603   M06   Fee paid on   10.06.2016
30.04.202007   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[A]GB191509474  (SOUTH JAMES THOMAS [GB]) [A] 1-5 * page 2, line 38 - line 47; figure 7 *;
 [A]US2392551  (JAMES ROE) [A] 1-5* line 37 - column 2, line 52; figures 1-4 *;
 [A]GB1388117  (WEEKS H H J) [A] 1-5 * page 2, line 106 - line 112; figure 3 *;
 [XI]FR2729684  (LINANT JEAN JACQUES [FR]) [X] 1,2,8,9,11 * page 4, line 10 - page 5, line 18; figures 1-6 * * page 1, line 1 - line 3 * [I] 3-7,10;
 [XI]DE202004014358U  (KREHER BETON GMBH [DE]) [X] 1,6,10,11 * paragraph [0059] - paragraph [0062]; figures 1,2,4,5,6, 15, 18,19 * * paragraph [0063] * [I] 2-4,8,9
by applicantDE8715879U
 DE19745941
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.