| EP2994726 - ELASTICALLY DEFORMABLE LOAD BEARING STRUCTURE COMPRISING A MEASURING ASSEMBLY FOR THE LOAD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.12.2020 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 10.01.2020 | ||
| Former | Grant of patent is intended Status updated on 20.06.2019 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states DIGI SENS Holding AG Freiburgstrasse 59b 3280 Murten / CH | [2019/01] |
| Former [2016/26] | For all designated states Digisens AG Freiburgstrasse 65 3280 Murten / CH | ||
| Former [2016/11] | For all designated states Digisens AG Freiburgstrasse 65 3280 Murten / CH | ||
| For all designated states Lustenberger, Martin Chemin du Gerbey 11 1752 Villars sur Glâne / CH | Inventor(s) | 01 /
LUSTENBERGER, Martin Chemin du Gerbey 11 CH-1752 Villars sur Glâne / CH | [2016/11] | Representative(s) | Stump, Beat Stump & Partner AG Zimmergasse 16 8008 Zürich / CH | [2016/11] | Application number, filing date | 14724989.0 | 05.05.2014 | [2016/11] | WO2014CH00061 | Priority number, date | CH20130093413 | 08.05.2013 Original published format: CH 934132013 | [2016/11] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2014179897 | Date: | 13.11.2014 | Language: | DE | [2014/46] | Type: | A1 Application with search report | No.: | EP2994726 | Date: | 16.03.2016 | Language: | DE | The application published by WIPO in one of the EPO official languages on 13.11.2014 takes the place of the publication of the European patent application. | [2016/11] | Type: | B1 Patent specification | No.: | EP2994726 | Date: | 12.02.2020 | Language: | DE | [2020/07] | Search report(s) | International search report - published on: | EP | 13.11.2014 | Classification | IPC: | G01G1/18, G01G21/16, G01L5/00, G01G19/12, G01G19/18 | [2016/11] | CPC: |
G01G1/18 (EP,US);
B60P1/6409 (US);
B60P1/6463 (US);
B62D33/02 (US);
F16L3/18 (US);
G01G19/08 (US);
G01G21/161 (EP,US);
G01L5/00 (US);
G01L5/0014 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/11] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ELASTISCH DEFORMIERBARER LASTTRÄGER MIT EINER MESSANORDNUNG FÜR DIE LAST | [2016/11] | English: | ELASTICALLY DEFORMABLE LOAD BEARING STRUCTURE COMPRISING A MEASURING ASSEMBLY FOR THE LOAD | [2016/11] | French: | PORTE-CHARGE ÉLASTIQUEMENT DÉFORMABLE COMPRENANT UN DISPOSITIF DE MESURE DE LA CHARGE | [2016/11] | Entry into regional phase | 08.12.2015 | National basic fee paid | 08.12.2015 | Designation fee(s) paid | 08.12.2015 | Examination fee paid | Examination procedure | 08.12.2015 | Examination requested [2016/11] | 17.10.2016 | Amendment by applicant (claims and/or description) | 21.06.2019 | Communication of intention to grant the patent | 04.11.2019 | Fee for grant paid | 04.11.2019 | Fee for publishing/printing paid | 06.12.2019 | Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time | 16.12.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 13.11.2020 | No opposition filed within time limit [2021/03] | Request for further processing for: | The application is deemed to be withdrawn due to failure to fulfill actions required for granting the patent | 16.12.2019 | Request for further processing filed | 16.12.2019 | Full payment received (date of receipt of payment) Request granted | 10.01.2020 | Decision despatched | 17.10.2016 | Request for further processing filed | 17.10.2016 | Full payment received (date of receipt of payment) Request granted | 31.10.2016 | Decision despatched | Fees paid | Renewal fee | 20.05.2016 | Renewal fee patent year 03 | 23.05.2017 | Renewal fee patent year 04 | 25.05.2018 | Renewal fee patent year 05 | 23.05.2019 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.05.2014 | AL | 12.02.2020 | CY | 12.02.2020 | CZ | 12.02.2020 | DK | 12.02.2020 | EE | 12.02.2020 | ES | 12.02.2020 | FI | 12.02.2020 | HR | 12.02.2020 | IT | 12.02.2020 | LT | 12.02.2020 | LV | 12.02.2020 | MC | 12.02.2020 | MK | 12.02.2020 | MT | 12.02.2020 | PL | 12.02.2020 | RO | 12.02.2020 | RS | 12.02.2020 | SI | 12.02.2020 | SK | 12.02.2020 | SM | 12.02.2020 | TR | 12.02.2020 | IE | 05.05.2020 | LU | 05.05.2020 | BG | 12.05.2020 | NO | 12.05.2020 | GR | 13.05.2020 | BE | 31.05.2020 | IS | 12.06.2020 | PT | 05.07.2020 | [2022/31] |
| Former [2022/30] | HU | 05.05.2014 | |
| AL | 12.02.2020 | ||
| CY | 12.02.2020 | ||
| CZ | 12.02.2020 | ||
| DK | 12.02.2020 | ||
| EE | 12.02.2020 | ||
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| IT | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| MC | 12.02.2020 | ||
| MT | 12.02.2020 | ||
| PL | 12.02.2020 | ||
| RO | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SI | 12.02.2020 | ||
| SK | 12.02.2020 | ||
| SM | 12.02.2020 | ||
| TR | 12.02.2020 | ||
| IE | 05.05.2020 | ||
| LU | 05.05.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| BE | 31.05.2020 | ||
| IS | 12.06.2020 | ||
| PT | 05.07.2020 | ||
| Former [2022/27] | HU | 05.05.2014 | |
| CY | 12.02.2020 | ||
| CZ | 12.02.2020 | ||
| DK | 12.02.2020 | ||
| EE | 12.02.2020 | ||
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| IT | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| MC | 12.02.2020 | ||
| MT | 12.02.2020 | ||
| PL | 12.02.2020 | ||
| RO | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SI | 12.02.2020 | ||
| SK | 12.02.2020 | ||
| SM | 12.02.2020 | ||
| TR | 12.02.2020 | ||
| IE | 05.05.2020 | ||
| LU | 05.05.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| BE | 31.05.2020 | ||
| IS | 12.06.2020 | ||
| PT | 05.07.2020 | ||
| Former [2021/24] | CZ | 12.02.2020 | |
| DK | 12.02.2020 | ||
| EE | 12.02.2020 | ||
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| IT | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| MC | 12.02.2020 | ||
| PL | 12.02.2020 | ||
| RO | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SI | 12.02.2020 | ||
| SK | 12.02.2020 | ||
| SM | 12.02.2020 | ||
| IE | 05.05.2020 | ||
| LU | 05.05.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| BE | 31.05.2020 | ||
| IS | 12.06.2020 | ||
| PT | 05.07.2020 | ||
| Former [2021/20] | CZ | 12.02.2020 | |
| DK | 12.02.2020 | ||
| EE | 12.02.2020 | ||
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| IT | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| MC | 12.02.2020 | ||
| PL | 12.02.2020 | ||
| RO | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SI | 12.02.2020 | ||
| SK | 12.02.2020 | ||
| SM | 12.02.2020 | ||
| IE | 05.05.2020 | ||
| LU | 05.05.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| PT | 05.07.2020 | ||
| Former [2021/15] | CZ | 12.02.2020 | |
| DK | 12.02.2020 | ||
| EE | 12.02.2020 | ||
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| IT | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| MC | 12.02.2020 | ||
| PL | 12.02.2020 | ||
| RO | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SI | 12.02.2020 | ||
| SK | 12.02.2020 | ||
| SM | 12.02.2020 | ||
| LU | 05.05.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| PT | 05.07.2020 | ||
| Former [2021/10] | CZ | 12.02.2020 | |
| DK | 12.02.2020 | ||
| EE | 12.02.2020 | ||
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| IT | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| MC | 12.02.2020 | ||
| PL | 12.02.2020 | ||
| RO | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SI | 12.02.2020 | ||
| SK | 12.02.2020 | ||
| SM | 12.02.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| PT | 05.07.2020 | ||
| Former [2020/50] | CZ | 12.02.2020 | |
| DK | 12.02.2020 | ||
| EE | 12.02.2020 | ||
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| RO | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SK | 12.02.2020 | ||
| SM | 12.02.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| PT | 05.07.2020 | ||
| Former [2020/49] | CZ | 12.02.2020 | |
| DK | 12.02.2020 | ||
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| RO | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SK | 12.02.2020 | ||
| SM | 12.02.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| PT | 05.07.2020 | ||
| Former [2020/48] | DK | 12.02.2020 | |
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| RO | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SM | 12.02.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| PT | 05.07.2020 | ||
| Former [2020/47] | DK | 12.02.2020 | |
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| Former [2020/40] | FI | 12.02.2020 | |
| HR | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| Former [2020/39] | FI | 12.02.2020 | |
| HR | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| Former [2020/38] | FI | 12.02.2020 | |
| HR | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| Former [2020/37] | FI | 12.02.2020 | |
| HR | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| NO | 12.05.2020 | ||
| Former [2020/35] | FI | 12.02.2020 | |
| NO | 12.05.2020 | Cited in | International search | [XI] US4095660 (JOHANSSON KURT EILERT et al.) | [XI] US3488997 (KLIEVER WALDO H et al.) | [XI] US4361199 (ULICNY THOMAS A et al.) [X] 1-5,7,11 * figures 1, 2 * * column 2, line 31 - column 3, line 13 * * column 3, line 14 - line 22 *[I] 6,8-10,12-14 | by applicant | JP2008002913 | WO2012106826 |