EP2994647 - CENTRIFUGAL COMPRESSOR WITH INLET DUCT HAVING SWIRL GENERATORS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.01.2022 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 05.02.2021 | ||
Former | Grant of patent is intended Status updated on 20.09.2020 | ||
Former | Examination is in progress Status updated on 28.08.2020 | ||
Former | Grant of patent is intended Status updated on 13.05.2020 | ||
Former | Examination is in progress Status updated on 04.09.2019 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Imperial College Innovations Limited Level 1 Faculty Building c/o Imperial College Exhibition Road London SW7 2AZ / GB | [2019/41] |
Former [2016/11] | For all designated states Imperial Innovations Limited 52 Princes Gate South Kensington London, Greater London SW7 2PG / GB | Inventor(s) | 01 /
YANG, Mingyang 7 Limewood Close Ealing London W13 8HL / GB | 02 /
MARTINEZ-BOTAS, Ricardo 10 Queen Annes Close Middlesex TW2 5NN / GB | [2016/11] | Representative(s) | Howson, Richard Giles Bentham, et al Kilburn & Strode LLP Lacon London 84 Theobalds Road London WC1X 8NL / GB | [2021/10] |
Former [2016/11] | Howson, Richard G.B., et al Kilburn & Strode LLP 20 Red Lion Street London WC1R 4PJ / GB | Application number, filing date | 14725238.1 | 09.05.2014 | [2016/11] | WO2014GB51416 | Priority number, date | GB20130008381 | 09.05.2013 Original published format: GB 201308381 | [2016/11] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014181119 | Date: | 13.11.2014 | Language: | EN | [2014/46] | Type: | A1 Application with search report | No.: | EP2994647 | Date: | 16.03.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 13.11.2014 takes the place of the publication of the European patent application. | [2016/11] | Type: | B1 Patent specification | No.: | EP2994647 | Date: | 10.03.2021 | Language: | EN | [2021/10] | Search report(s) | International search report - published on: | EP | 13.11.2014 | Classification | IPC: | F04D29/42, F04D29/44 | [2016/11] | CPC: |
F04D29/441 (EP,US);
F04D17/10 (US);
F04D29/284 (US);
F04D29/4213 (EP,US);
F04D29/4233 (US);
F04D29/444 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/11] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | KREISELVERDICHTER MIT EINLASSKANAL MIT DRALLERZEUGERN | [2020/42] | English: | CENTRIFUGAL COMPRESSOR WITH INLET DUCT HAVING SWIRL GENERATORS | [2016/11] | French: | COMPRESSEUR CENTRIFUGE AVEC CONDUIT D'ENTRÉE MUNI DE GÉNÉRATEURS DE TOURBILLONNEMENT | [2016/11] |
Former [2016/11] | KREISELVERDICHTER MIT EINLASSKANAL MITWIRBELGENERATOREN | Entry into regional phase | 09.12.2015 | National basic fee paid | 09.12.2015 | Designation fee(s) paid | 09.12.2015 | Examination fee paid | Examination procedure | 09.12.2015 | Examination requested [2016/11] | 04.08.2016 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time | 04.08.2016 | Despatch of communication of loss of particular rights: Claims {1} | 14.10.2016 | Amendment by applicant (claims and/or description) | 09.09.2019 | Despatch of a communication from the examining division (Time limit: M04) | 20.12.2019 | Reply to a communication from the examining division | 14.05.2020 | Communication of intention to grant the patent | 27.08.2020 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 21.09.2020 | Communication of intention to grant the patent | 28.01.2021 | Fee for grant paid | 28.01.2021 | Fee for publishing/printing paid | 28.01.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 13.12.2021 | No opposition filed within time limit [2022/07] | Request for further processing for: | 14.10.2016 | Request for further processing filed | 14.10.2016 | Full payment received (date of receipt of payment) Request granted | 31.10.2016 | Decision despatched | 14.10.2016 | Request for further processing filed | 14.10.2016 | Full payment received (date of receipt of payment) Request granted | 31.10.2016 | Decision despatched | Fees paid | Renewal fee | 31.05.2016 | Renewal fee patent year 03 | 21.11.2017 | Renewal fee patent year 04 | 28.05.2018 | Renewal fee patent year 05 | 30.05.2019 | Renewal fee patent year 06 | 28.05.2020 | Renewal fee patent year 07 | Penalty fee | Additional fee for renewal fee | 31.05.2017 | 04   M06   Fee paid on   21.11.2017 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.05.2014 | AL | 10.03.2021 | AT | 10.03.2021 | CY | 10.03.2021 | CZ | 10.03.2021 | DK | 10.03.2021 | EE | 10.03.2021 | ES | 10.03.2021 | FI | 10.03.2021 | HR | 10.03.2021 | IT | 10.03.2021 | LT | 10.03.2021 | LV | 10.03.2021 | MC | 10.03.2021 | MK | 10.03.2021 | MT | 10.03.2021 | NL | 10.03.2021 | PL | 10.03.2021 | RO | 10.03.2021 | RS | 10.03.2021 | SE | 10.03.2021 | SI | 10.03.2021 | SK | 10.03.2021 | SM | 10.03.2021 | IE | 09.05.2021 | LU | 09.05.2021 | BE | 31.05.2021 | CH | 31.05.2021 | LI | 31.05.2021 | BG | 10.06.2021 | NO | 10.06.2021 | GR | 11.06.2021 | IS | 10.07.2021 | PT | 12.07.2021 | [2024/41] |
Former [2024/22] | HU | 09.05.2014 | |
AL | 10.03.2021 | ||
AT | 10.03.2021 | ||
CY | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
IT | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
MK | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
IE | 09.05.2021 | ||
LU | 09.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2023/30] | HU | 09.05.2014 | |
AL | 10.03.2021 | ||
AT | 10.03.2021 | ||
CY | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
IT | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
IE | 09.05.2021 | ||
LU | 09.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2023/27] | HU | 09.05.2014 | |
AL | 10.03.2021 | ||
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
IT | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
IE | 09.05.2021 | ||
LU | 09.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2022/34] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
IT | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
IE | 09.05.2021 | ||
LU | 09.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2022/23] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
IT | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
IE | 09.05.2021 | ||
LU | 09.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2022/21] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
IE | 09.05.2021 | ||
LU | 09.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
PT | 12.07.2021 | ||
Former [2022/11] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SI | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
LU | 09.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
PT | 12.07.2021 | ||
Former [2022/10] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
LU | 09.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
PT | 12.07.2021 | ||
Former [2022/08] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
DK | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
LU | 09.05.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2022/07] | AL | 10.03.2021 | |
AT | 10.03.2021 | ||
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
MC | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2021/52] | AT | 10.03.2021 | |
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
PL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2021/51] | AT | 10.03.2021 | |
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
ES | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
IS | 10.07.2021 | ||
PT | 12.07.2021 | ||
Former [2021/50] | AT | 10.03.2021 | |
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
RO | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SK | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
PT | 12.07.2021 | ||
Former [2021/48] | AT | 10.03.2021 | |
CZ | 10.03.2021 | ||
EE | 10.03.2021 | ||
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
Former [2021/46] | AT | 10.03.2021 | |
FI | 10.03.2021 | ||
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
SM | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
Former [2021/43] | FI | 10.03.2021 | |
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
NL | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
Former [2021/38] | FI | 10.03.2021 | |
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
RS | 10.03.2021 | ||
SE | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
Former [2021/37] | FI | 10.03.2021 | |
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
LV | 10.03.2021 | ||
RS | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
Former [2021/36] | FI | 10.03.2021 | |
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
BG | 10.06.2021 | ||
NO | 10.06.2021 | ||
GR | 11.06.2021 | ||
Former [2021/35] | FI | 10.03.2021 | |
HR | 10.03.2021 | ||
LT | 10.03.2021 | ||
NO | 10.06.2021 | ||
Former [2021/33] | FI | 10.03.2021 | |
LT | 10.03.2021 | ||
NO | 10.06.2021 | Cited in | International search | [X]GB599735 (HARRY PEARSON) [X] 1-8,10,18,19 * the whole document * * page 2, lines 5-36 * * figures 1,2 *; | [XI]JPS5896197 (NISSAN MOTOR) [X] 1-8,10,11,14,16,18,19 * abstract * * figure 2 * [I] 17; | [A]EP0331902 (HITACHI LTD [JP]) [A] 1-19 * the whole document * * claim 3 ** figure 3 *; | [X]US5277541 (PALMER DONALD L [US]) [X] 1-11,14-16,18,19 * the whole document * * column 4, line 35 - column 5, line 17 * * column 7, lines 47-60 * * figures 3-7 *; | [X]DE10223876 (DAIMLER CHRYSLER AG [DE]) [X] 1,2,11,17-19 * the whole document * * paragraphs [0010] , [0028] , [0029] * * figures 3,4 *; | [X]US2004009061 (MCDONALD GARY [GB]) [X] 1-8,10-13,17-19 * the whole document * * paragraphs [0002] , [0026] - [0030] * * figures 1-3 * | Examination | US2006088412 |