blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3004591

EP3004591 - HEAT PUMP WITH A FIRST THERMAL FLUID ENERGY MACHINE AND A SECOND THERMAL FLUID ENERGY MACHINE WHICH ARE CONNECTED IN A CIRCUIT [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  06.04.2018
Database last updated on 20.05.2024
FormerRequest for examination was made
Status updated on  03.01.2018
Most recent event   Tooltip06.04.2018Application deemed to be withdrawnpublished on 09.05.2018  [2018/19]
Applicant(s)For all designated states
Siemens Aktiengesellschaft
Werner-von-Siemens-Straße 1
80333 München / DE
[2017/35]
Former [2016/15]For all designated states
Siemens Aktiengesellschaft
Wittelsbacherplatz 2
80333 München / DE
Inventor(s)01 / REZNIK, Daniel
Borgfelder Steig 8
13503 Berlin / DE
02 / STIESDAL, Henrik
Nørrevoldgade 45
5000 Odense C / DK
 [2016/15]
Application number, filing date14725971.705.05.2014
[2016/15]
WO2014EP59063
Priority number, dateEP2013017006431.05.2013         Original published format: EP 13170064
[2016/15]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report
No.:WO2014191157
Date:04.12.2014
Language:DE
[2014/49]
Type: A2 Application without search report 
No.:EP3004591
Date:13.04.2016
Language:DE
The application published by WIPO in one of the EPO official languages on 04.12.2014 takes the place of the publication of the European patent application.
[2016/15]
Search report(s)International search report - published on:EP26.03.2015
ClassificationIPC:F02C1/02, F02C6/14, F02C7/36, F25B1/053, F25B11/00, F28D20/00, F01K3/00, F01K13/00
[2016/15]
CPC:
F01K13/00 (EP); F01K3/00 (EP); F02C6/14 (EP);
F25B1/053 (EP); F25B1/10 (EP); F25B30/02 (EP);
F25B2339/047 (EP); F25B2400/072 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/15]
TitleGerman:WÄRMEPUMPE MIT EINER IN EINEM KREISLAUF GESCHALTETEN ERSTEN THERMISCHEN FLUIDENERGIE-MASCHINE UND ZWEITEN THERMISCHEN FLUIDENERGIE-MASCHINE[2016/15]
English:HEAT PUMP WITH A FIRST THERMAL FLUID ENERGY MACHINE AND A SECOND THERMAL FLUID ENERGY MACHINE WHICH ARE CONNECTED IN A CIRCUIT[2016/15]
French:POMPE À CHALEUR ÉQUIPÉE D'UNE PREMIÈRE MACHINE THERMIQUE À ÉNERGIE FLUIDIQUE ET D'UNE SECONDE MACHINE THERMIQUE À ÉNERGIE FLUIDE MONTÉES EN CIRCUIT[2016/15]
Entry into regional phase09.11.2015National basic fee paid 
09.11.2015Designation fee(s) paid 
09.11.2015Examination fee paid 
Examination procedure09.11.2015Examination requested  [2016/15]
19.07.2016Amendment by applicant (claims and/or description)
01.12.2017Application deemed to be withdrawn, date of legal effect  [2018/19]
04.01.2018Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time  [2018/19]
Fees paidRenewal fee
20.05.2016Renewal fee patent year 03
Penalty fee
Additional fee for renewal fee
31.05.201704   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[YA]US2010251712  (NAKHAMKIN MICHAEL [US]) [Y] 1-4,6,7 * paragraphs [0005] - [0027]; figures 1,2 * [A] 5,8;
 [Y]US4275310  (SUMMERS WILLIAM A ET AL) [Y] 1-4,6,7 * figures 1,2 *;
 [Y]EP2447501  (NUOVO PIGNONE SPA [IT]) [Y] 1-4,6,7 * figure 2 *;
 [A]EP2574865  (SIEMENS AG [DE]) [A] 1 * figure 2 *
by applicantWO2009044139
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.