EP3004010 - A GLAZING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.02.2024 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 24.02.2023 | ||
Former | Grant of patent is intended Status updated on 19.10.2022 | ||
Former | Examination is in progress Status updated on 06.04.2019 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Pilkington Group Limited European Technical Centre Hall Lane, Lathom Nr. Ormskirk Lancashire L40 5UF / GB | [2016/15] | Inventor(s) | 01 /
RIDEALGH, John, Andrew 5 Primrose Hill Cuddington Northwich Cheshire CW8 2TZ / GB | 02 /
HURST, Simon, James 8 Glastonbury Close Sandymoor Runcorn Cheshire WA7 1QW / GB | 03 /
SLADE, Simon, John 193 Wigan Road Ormskirk Lancashire L39 2AT / GB | [2016/15] | Representative(s) | Denno, Richard Christopher Somer, et al Pilkington Group Limited European Technical Centre Hall Lane Lathom Ormskirk, Lancashire L40 5UF / GB | [2023/13] |
Former [2016/15] | Denno, Richard Christopher Somer, et al Pilkington Group Limited European Technical Centre Hall Lane Lathom GB-Ormskirk, Lancashire L40 5UF / GB | Application number, filing date | 14726739.7 | 22.05.2014 | [2016/15] | WO2014GB51569 | Priority number, date | GB20130009386 | 24.05.2013 Original published format: GB 201309386 | [2016/15] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014188196 | Date: | 27.11.2014 | Language: | EN | [2014/48] | Type: | A1 Application with search report | No.: | EP3004010 | Date: | 13.04.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 27.11.2014 takes the place of the publication of the European patent application. | [2016/15] | Type: | B1 Patent specification | No.: | EP3004010 | Date: | 29.03.2023 | Language: | EN | [2023/13] | Search report(s) | International search report - published on: | EP | 27.11.2014 | Classification | IPC: | C03C17/245, A01M29/08, C03C17/34, C03C17/36 | [2016/15] | CPC: |
A01M29/08 (EP,US);
C09D5/006 (US);
C03C17/3417 (EP,US);
C08K3/22 (US);
C08K3/36 (US);
C09D5/004 (US);
G02B1/115 (EP,US);
C03C2217/734 (EP,US);
C08K2003/2231 (US);
C08K2003/2241 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERGLASUNG | [2016/15] | English: | A GLAZING | [2016/15] | French: | VITRAGE | [2016/15] | Entry into regional phase | 04.01.2016 | National basic fee paid | 04.01.2016 | Designation fee(s) paid | 04.01.2016 | Examination fee paid | Examination procedure | 04.01.2016 | Examination requested [2016/15] | 01.08.2016 | Amendment by applicant (claims and/or description) | 10.04.2019 | Despatch of a communication from the examining division (Time limit: M06) | 18.11.2019 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 24.01.2020 | Reply to a communication from the examining division | 12.04.2021 | Despatch of a communication from the examining division (Time limit: M06) | 22.10.2021 | Reply to a communication from the examining division | 15.02.2022 | Despatch of a communication from the examining division (Time limit: M04) | 22.06.2022 | Reply to a communication from the examining division | 19.10.2022 | Communication of intention to grant the patent | 17.02.2023 | Fee for grant paid | 17.02.2023 | Fee for publishing/printing paid | 17.02.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 03.01.2024 | No opposition filed within time limit [2024/10] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 24.01.2020 | Request for further processing filed | 24.01.2020 | Full payment received (date of receipt of payment) Request granted | 05.02.2020 | Decision despatched | Fees paid | Renewal fee | 31.05.2016 | Renewal fee patent year 03 | 31.05.2017 | Renewal fee patent year 04 | 01.06.2018 | Renewal fee patent year 05 | 31.05.2019 | Renewal fee patent year 06 | 02.06.2020 | Renewal fee patent year 07 | 31.05.2021 | Renewal fee patent year 08 | 31.05.2022 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 29.03.2023 | CZ | 29.03.2023 | DK | 29.03.2023 | EE | 29.03.2023 | ES | 29.03.2023 | FI | 29.03.2023 | HR | 29.03.2023 | IT | 29.03.2023 | LT | 29.03.2023 | LV | 29.03.2023 | MC | 29.03.2023 | NL | 29.03.2023 | RO | 29.03.2023 | RS | 29.03.2023 | SE | 29.03.2023 | SI | 29.03.2023 | SK | 29.03.2023 | SM | 29.03.2023 | IE | 22.05.2023 | LU | 22.05.2023 | CH | 31.05.2023 | LI | 31.05.2023 | NO | 29.06.2023 | GR | 30.06.2023 | IS | 29.07.2023 | PT | 31.07.2023 | [2024/26] |
Former [2024/24] | AT | 29.03.2023 | |
CZ | 29.03.2023 | ||
DK | 29.03.2023 | ||
EE | 29.03.2023 | ||
ES | 29.03.2023 | ||
FI | 29.03.2023 | ||
HR | 29.03.2023 | ||
LT | 29.03.2023 | ||
LV | 29.03.2023 | ||
MC | 29.03.2023 | ||
NL | 29.03.2023 | ||
RO | 29.03.2023 | ||
RS | 29.03.2023 | ||
SE | 29.03.2023 | ||
SI | 29.03.2023 | ||
SK | 29.03.2023 | ||
SM | 29.03.2023 | ||
IE | 22.05.2023 | ||
LU | 22.05.2023 | ||
CH | 31.05.2023 | ||
LI | 31.05.2023 | ||
NO | 29.06.2023 | ||
GR | 30.06.2023 | ||
IS | 29.07.2023 | ||
PT | 31.07.2023 | ||
Former [2024/21] | AT | 29.03.2023 | |
CZ | 29.03.2023 | ||
DK | 29.03.2023 | ||
EE | 29.03.2023 | ||
ES | 29.03.2023 | ||
FI | 29.03.2023 | ||
HR | 29.03.2023 | ||
LT | 29.03.2023 | ||
LV | 29.03.2023 | ||
MC | 29.03.2023 | ||
NL | 29.03.2023 | ||
RO | 29.03.2023 | ||
RS | 29.03.2023 | ||
SE | 29.03.2023 | ||
SK | 29.03.2023 | ||
SM | 29.03.2023 | ||
IE | 22.05.2023 | ||
LU | 22.05.2023 | ||
CH | 31.05.2023 | ||
LI | 31.05.2023 | ||
NO | 29.06.2023 | ||
GR | 30.06.2023 | ||
IS | 29.07.2023 | ||
PT | 31.07.2023 | ||
Former [2024/09] | AT | 29.03.2023 | |
CZ | 29.03.2023 | ||
DK | 29.03.2023 | ||
EE | 29.03.2023 | ||
ES | 29.03.2023 | ||
FI | 29.03.2023 | ||
HR | 29.03.2023 | ||
LT | 29.03.2023 | ||
LV | 29.03.2023 | ||
MC | 29.03.2023 | ||
NL | 29.03.2023 | ||
RO | 29.03.2023 | ||
RS | 29.03.2023 | ||
SE | 29.03.2023 | ||
SK | 29.03.2023 | ||
SM | 29.03.2023 | ||
LU | 22.05.2023 | ||
CH | 31.05.2023 | ||
LI | 31.05.2023 | ||
NO | 29.06.2023 | ||
GR | 30.06.2023 | ||
IS | 29.07.2023 | ||
PT | 31.07.2023 | ||
Former [2024/08] | AT | 29.03.2023 | |
EE | 29.03.2023 | ||
ES | 29.03.2023 | ||
FI | 29.03.2023 | ||
HR | 29.03.2023 | ||
LT | 29.03.2023 | ||
LV | 29.03.2023 | ||
MC | 29.03.2023 | ||
NL | 29.03.2023 | ||
RO | 29.03.2023 | ||
RS | 29.03.2023 | ||
SE | 29.03.2023 | ||
SK | 29.03.2023 | ||
SM | 29.03.2023 | ||
LU | 22.05.2023 | ||
NO | 29.06.2023 | ||
GR | 30.06.2023 | ||
IS | 29.07.2023 | ||
PT | 31.07.2023 | ||
Former [2023/50] | AT | 29.03.2023 | |
EE | 29.03.2023 | ||
ES | 29.03.2023 | ||
FI | 29.03.2023 | ||
HR | 29.03.2023 | ||
LT | 29.03.2023 | ||
LV | 29.03.2023 | ||
NL | 29.03.2023 | ||
RO | 29.03.2023 | ||
RS | 29.03.2023 | ||
SE | 29.03.2023 | ||
SK | 29.03.2023 | ||
SM | 29.03.2023 | ||
NO | 29.06.2023 | ||
GR | 30.06.2023 | ||
IS | 29.07.2023 | ||
PT | 31.07.2023 | ||
Former [2023/49] | AT | 29.03.2023 | |
EE | 29.03.2023 | ||
ES | 29.03.2023 | ||
FI | 29.03.2023 | ||
HR | 29.03.2023 | ||
LT | 29.03.2023 | ||
LV | 29.03.2023 | ||
NL | 29.03.2023 | ||
RO | 29.03.2023 | ||
RS | 29.03.2023 | ||
SE | 29.03.2023 | ||
SM | 29.03.2023 | ||
NO | 29.06.2023 | ||
GR | 30.06.2023 | ||
PT | 31.07.2023 | ||
Former [2023/48] | AT | 29.03.2023 | |
EE | 29.03.2023 | ||
ES | 29.03.2023 | ||
FI | 29.03.2023 | ||
HR | 29.03.2023 | ||
LT | 29.03.2023 | ||
LV | 29.03.2023 | ||
NL | 29.03.2023 | ||
RS | 29.03.2023 | ||
SE | 29.03.2023 | ||
SM | 29.03.2023 | ||
NO | 29.06.2023 | ||
GR | 30.06.2023 | ||
PT | 31.07.2023 | ||
Former [2023/46] | ES | 29.03.2023 | |
FI | 29.03.2023 | ||
HR | 29.03.2023 | ||
LT | 29.03.2023 | ||
LV | 29.03.2023 | ||
NL | 29.03.2023 | ||
RS | 29.03.2023 | ||
SE | 29.03.2023 | ||
SM | 29.03.2023 | ||
NO | 29.06.2023 | ||
GR | 30.06.2023 | ||
PT | 31.07.2023 | ||
Former [2023/38] | FI | 29.03.2023 | |
HR | 29.03.2023 | ||
LT | 29.03.2023 | ||
LV | 29.03.2023 | ||
NL | 29.03.2023 | ||
RS | 29.03.2023 | ||
SE | 29.03.2023 | ||
NO | 29.06.2023 | ||
GR | 30.06.2023 | ||
Former [2023/37] | FI | 29.03.2023 | |
HR | 29.03.2023 | ||
LT | 29.03.2023 | ||
LV | 29.03.2023 | ||
RS | 29.03.2023 | ||
SE | 29.03.2023 | ||
NO | 29.06.2023 | ||
GR | 30.06.2023 | ||
Former [2023/36] | FI | 29.03.2023 | |
HR | 29.03.2023 | ||
LT | 29.03.2023 | ||
LV | 29.03.2023 | ||
RS | 29.03.2023 | ||
SE | 29.03.2023 | ||
NO | 29.06.2023 | ||
Former [2023/35] | HR | 29.03.2023 | |
LT | 29.03.2023 | ||
RS | 29.03.2023 | ||
NO | 29.06.2023 | ||
Former [2023/34] | LT | 29.03.2023 | |
RS | 29.03.2023 | ||
Former [2023/33] | LT | 29.03.2023 | Cited in | International search | [Y]US6165598 (NELSON DOUGLAS [US]) [Y] 15-17,19 * col. 1, l. 57-59; col. 5, l. 33-46 *; | [Y]EP1110450 (MEYERHUBER ALFRED DR [DE]) [Y] 1 * paragraphs [0004] , [0008] , [0011] , [0014] , [0019] , [0021]; figures 1,2 *; | [Y]EP1479294 (MEYERHUBER ALFRED DR [DE], et al) [Y] 1-20 * Fig. 5; [0007], [0014](3), [0016], [0020], [0031] *; | [A]US2007190343 (ARKLES BARRY C [US]) [A] 1-20 * paragraphs [0006] , [0017] - paragraph [0019] *; | [Y]US2009130349 (ALVAREZ JEMSSY [US]) [Y] 1-20 * Fig. 1; [0006]-[0008], [0013]-[0020], [0024] *; | [A]US2011256325 (SANDERSON KEVIN DAVID [GB], et al) [A] 1-20 * paragraphs [0019] , [0022] - paragraphs [0024] , [0029]; example 1 *; | [XY]US2013032202 (NGHIEM BERNARD [FR], et al) [X] 1-14,18,20 * Fig. 1; [0012]-[0014], [0017], [0025], [0027], [0046]-[0048] * [Y] 15-17,19; | [A]US2013087720 (CESNIK GERHARD [AT], et al) [A] 1-20 * paragraphs [0009] , [0017] , [0018] , [0020] , [0036] , [0037] , [0039] , [0065] - paragraph [0074]; figures 1-4 *; | [A] - HEIKO HAUPT, "Auf dem Weg zu einem neuen Mythos? Warum UV-Glas zur Vermeidung von Vogelschlag noch nicht empfohlen werden kann", BERICHTE ZUM VOGELSCHUTZ, (20110101), vol. 47/48, pages 143 - 160, XP055065078 [A] 1-20 * p. 152: "4 Perspektive für UV-Markierungen: Viele offene Fragen"-p. 155 * | Examination | US5952084 | US2013003208 |