blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3004802

EP3004802 - STRUCTURE NAVIGATION [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  20.10.2017
Database last updated on 09.09.2024
FormerExamination is in progress
Status updated on  09.12.2016
Most recent event   Tooltip20.10.2017Application deemed to be withdrawnpublished on 22.11.2017  [2017/47]
Applicant(s)For all designated states
BAE Systems PLC
6 Carlton Gardens
London SW1Y 5AD / GB
[2016/15]
Inventor(s)01 / APPLEGATE, Phillip, Roy
BAE Systems
Portsdown Technology Park
Southwick Road
Cosham
Portsmouth Hampshire PO6 3RU / GB
02 / BROWN, Stephen, William
BAE Systems
Lyon Way
Frimley Surrey GU16 7EX / GB
 [2016/15]
Representative(s)(deleted)
[2016/15]
Application number, filing date14728244.628.05.2014
[2016/15]
WO2014GB51615
Priority number, dateGB2013000955929.05.2013         Original published format: GB 201309559
EP2013027512729.05.2013         Original published format: EP 13275127
[2016/15]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2014191731
Date:04.12.2014
Language:EN
[2014/49]
Type: A1 Application with search report 
No.:EP3004802
Date:13.04.2016
Language:EN
The application published by WIPO in one of the EPO official languages on 04.12.2014 takes the place of the publication of the European patent application.
[2016/15]
Search report(s)International search report - published on:EP04.12.2014
ClassificationIPC:G01C21/20
[2016/15]
CPC:
G01C21/206 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/15]
TitleGerman:STRUKTURNAVIGATION[2016/15]
English:STRUCTURE NAVIGATION[2016/15]
French:NAVIGATION À TRAVERS UNE STRUCTURE[2016/15]
Entry into regional phase04.12.2015National basic fee paid 
04.12.2015Designation fee(s) paid 
04.12.2015Examination fee paid 
Examination procedure04.12.2015Examination requested  [2016/15]
11.07.2016Amendment by applicant (claims and/or description)
13.12.2016Despatch of a communication from the examining division (Time limit: M06)
24.06.2017Application deemed to be withdrawn, date of legal effect  [2017/47]
18.07.2017Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time  [2017/47]
Fees paidRenewal fee
20.05.2016Renewal fee patent year 03
Penalty fee
Additional fee for renewal fee
31.05.201704   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[X]US2011251787  (GUPTA RAJARSHI [US] ET AL) [X] 1-12,15 * paragraphs [0030] , [0031] , [0032] , [0038] , [0039] , [0056] , [0070] , [0074] - [0084] - [0105] , [0119]; figure 9 *;
 [X]DE19757199  (BOSCH GMBH ROBERT [DE]) [X] 1-6,10-12,15 * column 4, line 25 - column 6, line 39 *;
 [XI]EP1124110  (UNIV NEWCASTLE [GB]) [X] 1-6,10-13,15 * paragraph [0011] - paragraph [0025] * [I] 14;
 [A]US7840343  (SAKAMOTO HIROSHI [JP]) [A] 1,14 * column 16, line 58 - column 17, line 3 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.