blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2991817

EP2991817 - ADAPTATION METHOD AND PRODUCTION METHOD FOR COMPONENTS PRODUCED BY MEANS OF SLM [Right-click to bookmark this link]
Former [2016/10]ADAPTATION METHOD AND PRODUCTION METHOD FOR COMPONENTS PRODUCED BY SLM
[2017/31]
StatusNo opposition filed within time limit
Status updated on  21.12.2018
Database last updated on 24.08.2024
FormerThe patent has been granted
Status updated on  12.01.2018
FormerGrant of patent is intended
Status updated on  14.09.2017
Most recent event   Tooltip10.07.2020Lapse of the patent in a contracting state
New state(s): IS
published on 12.08.2020  [2020/33]
Applicant(s)For all designated states
Siemens Aktiengesellschaft
Werner-von-Siemens-Straße 1
80333 München / DE
[2017/35]
Former [2016/10]For all designated states
Siemens Aktiengesellschaft
Wittelsbacherplatz 2
80333 München / DE
Inventor(s)01 / DEISS, Olga
Mündrathweg 46
40627 Düsseldorf / DE
02 / REINARZ, Bernd
Venusweg 2
45478 Mülheim an der Ruhr / DE
03 / VAN KAMPEN, Jaap
Le Bron de Vexelastraat
NL-6042 AR Roermond / NL
 [2018/07]
Former [2016/10]01 / DEISS, Olga
Mündrathweg 46
40627 Düsseldorf / DE
02 / REINARZ, Bernd
Rheinstrasse 5
40668 Meerbusch / DE
03 / VAN KAMPEN, Jaap
Le Bron de Vexelastraat
NL-6042 AR Roermond / NL
Application number, filing date14731225.016.06.2014
[2016/10]
WO2014EP62515
Priority number, dateEP2013017568009.07.2013         Original published format: EP 13175680
[2016/10]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2015003876
Date:15.01.2015
Language:DE
[2015/02]
Type: A1 Application with search report 
No.:EP2991817
Date:09.03.2016
Language:DE
The application published by WIPO in one of the EPO official languages on 15.01.2015 takes the place of the publication of the European patent application.
[2016/10]
Type: B1 Patent specification 
No.:EP2991817
Date:14.02.2018
Language:DE
[2018/07]
Search report(s)International search report - published on:EP15.01.2015
ClassificationIPC:B29C67/00
[2016/10]
CPC:
B29C64/153 (EP,US); B29C64/386 (EP,US); G05B19/4099 (US);
B33Y10/00 (EP,US); B33Y50/02 (EP,US); G05B2219/35134 (US);
G05B2219/49007 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/10]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:ANPASSUNGSVERFAHREN UND HERSTELLVERFAHREN FÜR MITTELS SLM GEFERTIGTE BAUTEILE[2016/10]
English:ADAPTATION METHOD AND PRODUCTION METHOD FOR COMPONENTS PRODUCED BY MEANS OF SLM[2017/31]
French:PROCÉDÉ D'ADAPTATION ET PROCÉDÉ DE FABRICATION POUR DES COMPOSANTS FABRIQUÉS PAR SLM[2017/31]
Former [2016/10]ADAPTATION METHOD AND PRODUCTION METHOD FOR COMPONENTS PRODUCED BY SLM
Former [2016/10]PROCÉDÉ D'AJUSTEMENT ET PROCÉDÉ DE FABRICATION POUR PIÈCES RÉALISÉES PAR FUSION SÉLECTIVE PAR LASER
Entry into regional phase03.12.2015National basic fee paid 
03.12.2015Designation fee(s) paid 
03.12.2015Examination fee paid 
Examination procedure03.12.2015Examination requested  [2016/10]
30.06.2016Amendment by applicant (claims and/or description)
15.09.2017Communication of intention to grant the patent
27.12.2017Receipt of the translation of the claim(s)
28.12.2017Fee for grant paid
28.12.2017Fee for publishing/printing paid
Opposition(s)15.11.2018No opposition filed within time limit [2019/04]
Fees paidRenewal fee
21.06.2016Renewal fee patent year 03
19.06.2017Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU16.06.2014
AL14.02.2018
CY14.02.2018
EE14.02.2018
HR14.02.2018
LT14.02.2018
LV14.02.2018
MC14.02.2018
MK14.02.2018
MT14.02.2018
RO14.02.2018
RS14.02.2018
SI14.02.2018
SM14.02.2018
TR14.02.2018
BG14.05.2018
GR15.05.2018
IS14.06.2018
IE16.06.2018
[2020/33]
Former [2020/31]HU16.06.2014
AL14.02.2018
CY14.02.2018
EE14.02.2018
HR14.02.2018
LT14.02.2018
LV14.02.2018
MC14.02.2018
MK14.02.2018
MT14.02.2018
RO14.02.2018
RS14.02.2018
SI14.02.2018
SM14.02.2018
TR14.02.2018
BG14.05.2018
GR15.05.2018
IE16.06.2018
Former [2020/30]HU16.06.2014
AL14.02.2018
CY14.02.2018
EE14.02.2018
HR14.02.2018
LT14.02.2018
LV14.02.2018
MC14.02.2018
MT14.02.2018
RO14.02.2018
RS14.02.2018
SI14.02.2018
SM14.02.2018
TR14.02.2018
BG14.05.2018
GR15.05.2018
IE16.06.2018
Former [2020/16]AL14.02.2018
CY14.02.2018
EE14.02.2018
HR14.02.2018
LT14.02.2018
LV14.02.2018
MC14.02.2018
MT14.02.2018
RO14.02.2018
RS14.02.2018
SI14.02.2018
SM14.02.2018
TR14.02.2018
BG14.05.2018
GR15.05.2018
IE16.06.2018
Former [2019/19]AL14.02.2018
CY14.02.2018
EE14.02.2018
HR14.02.2018
LT14.02.2018
LV14.02.2018
MC14.02.2018
MT14.02.2018
RO14.02.2018
RS14.02.2018
SI14.02.2018
SM14.02.2018
BG14.05.2018
GR15.05.2018
IE16.06.2018
Former [2019/15]AL14.02.2018
CY14.02.2018
EE14.02.2018
HR14.02.2018
LT14.02.2018
LV14.02.2018
MC14.02.2018
MT14.02.2018
RO14.02.2018
RS14.02.2018
SI14.02.2018
SM14.02.2018
BG14.05.2018
GR15.05.2018
Former [2019/13]AL14.02.2018
CY14.02.2018
EE14.02.2018
HR14.02.2018
LT14.02.2018
LV14.02.2018
MT14.02.2018
RO14.02.2018
RS14.02.2018
SI14.02.2018
SM14.02.2018
BG14.05.2018
GR15.05.2018
Former [2018/52]AL14.02.2018
CY14.02.2018
EE14.02.2018
HR14.02.2018
LT14.02.2018
LV14.02.2018
MT14.02.2018
RO14.02.2018
RS14.02.2018
SM14.02.2018
BG14.05.2018
GR15.05.2018
Former [2018/50]AL14.02.2018
CY14.02.2018
EE14.02.2018
HR14.02.2018
LT14.02.2018
LV14.02.2018
MT14.02.2018
RO14.02.2018
RS14.02.2018
BG14.05.2018
GR15.05.2018
Former [2018/46]AL14.02.2018
CY14.02.2018
HR14.02.2018
LT14.02.2018
LV14.02.2018
MT14.02.2018
RS14.02.2018
BG14.05.2018
GR15.05.2018
Former [2018/43]CY14.02.2018
HR14.02.2018
LT14.02.2018
LV14.02.2018
MT14.02.2018
RS14.02.2018
BG14.05.2018
GR15.05.2018
Former [2018/40]CY14.02.2018
HR14.02.2018
LT14.02.2018
LV14.02.2018
RS14.02.2018
BG14.05.2018
GR15.05.2018
Former [2018/37]CY14.02.2018
HR14.02.2018
LT14.02.2018
GR15.05.2018
Former [2018/35]CY14.02.2018
HR14.02.2018
LT14.02.2018
Cited inInternational search[XI]WO2005080029  (BEGO MEDICAL AG [DE], et al) [X] 1-4,6 * page 2, line 19 - page 5, line 6 * * page 10, line 1 - page 11, line 20 * * page 14, line 14 - line 18 * * claim - * * figure 7 * [I] 5,7;
 [XI]EP2186625  (GLOBAL FILTRATION SYSTEMS INC [US]) [X] 1-4,6 * the whole document * [I] 5,7;
 [XI]US2009072447  (HULL CHARLES W [US], et al) [X] 1-4,6 * the whole document * [I] 5,7;
 [A]DE102011113445  (MTU AERO ENGINES GMBH [DE]) [A] 7 * paragraph [0001] - paragraph [0003] * * paragraph [0021] * * paragraph [0029] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.