EP3123878 - ELECTRONIC CIGARETTE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 19.04.2019 Database last updated on 24.07.2024 | |
Former | The patent has been granted Status updated on 11.05.2018 | ||
Former | Grant of patent is intended Status updated on 26.02.2018 | ||
Former | Request for examination was made Status updated on 30.12.2016 | ||
Former | The international publication has been made Status updated on 05.12.2016 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Shenzhen Smoore Technology Limited 2 Floor Building 8 No. 16 Dongcai Industrial Park Gushu Town Xixiang, Baoan District Shenzhen, Guangdong 518102 / CN | [2017/05] | Inventor(s) | 01 /
CHEN, Zhiping 2 Floor Building 8 No. 16 Dongcai Industrial Park Gushu, Xixiang, Baoan District Shenzhen Guangdong 518102 / CN | [2017/05] | Representative(s) | Cabinet Laurent & Charras Le Contemporain 50 Chemin de la Bruyère 69574 Dardilly Cedex / FR | [2017/05] | Application number, filing date | 14731532.9 | 27.03.2014 | [2017/05] | WO2014CN74181 | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015143662 | Date: | 01.10.2015 | Language: | ZH | [2015/39] | Type: | A1 Application with search report | No.: | EP3123878 | Date: | 01.02.2017 | Language: | EN | [2017/05] | Type: | B1 Patent specification | No.: | EP3123878 | Date: | 13.06.2018 | Language: | EN | [2018/24] | Search report(s) | International search report - published on: | CN | 01.10.2015 | (Supplementary) European search report - dispatched on: | EP | 11.10.2017 | Classification | IPC: | A24F47/00, A61M15/06, A61M11/04, // A61M16/00 | [2017/45] | CPC: |
A61M15/06 (EP,US);
A24F40/42 (EP,US);
A24F40/485 (EP,US);
A61M11/042 (EP,US);
A24F15/015 (EP,US);
A24F40/10 (EP,US);
A61M15/0021 (EP,US);
A61M2016/0018 (EP,US);
A61M2205/3653 (EP,US);
A61M2205/8206 (EP,US)
(-)
|
Former IPC [2017/05] | A24F47/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/05] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ELEKTRONISCHE ZIGARETTE | [2017/05] | English: | ELECTRONIC CIGARETTE | [2017/05] | French: | CIGARETTE ÉLECTRONIQUE | [2017/05] | Entry into regional phase | 27.06.2014 | Translation filed | 27.06.2014 | National basic fee paid | 27.06.2014 | Search fee paid | 27.06.2014 | Designation fee(s) paid | 27.06.2014 | Examination fee paid | Examination procedure | 27.06.2014 | Examination requested [2017/05] | 27.06.2014 | Date on which the examining division has become responsible | 20.11.2017 | Amendment by applicant (claims and/or description) | 27.02.2018 | Communication of intention to grant the patent | 02.05.2018 | Fee for grant paid | 02.05.2018 | Fee for publishing/printing paid | 02.05.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 27.02.2018 | Opposition(s) | 14.03.2019 | No opposition filed within time limit [2019/21] | Fees paid | Renewal fee | 25.03.2016 | Renewal fee patent year 03 | 24.03.2017 | Renewal fee patent year 04 | 23.03.2018 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.03.2014 | AL | 13.06.2018 | AT | 13.06.2018 | CY | 13.06.2018 | CZ | 13.06.2018 | DK | 13.06.2018 | EE | 13.06.2018 | ES | 13.06.2018 | FI | 13.06.2018 | HR | 13.06.2018 | IT | 13.06.2018 | LT | 13.06.2018 | LV | 13.06.2018 | MC | 13.06.2018 | MK | 13.06.2018 | NL | 13.06.2018 | PL | 13.06.2018 | RO | 13.06.2018 | RS | 13.06.2018 | SE | 13.06.2018 | SI | 13.06.2018 | SK | 13.06.2018 | SM | 13.06.2018 | TR | 13.06.2018 | BG | 13.09.2018 | NO | 13.09.2018 | GR | 14.09.2018 | IS | 13.10.2018 | PT | 15.10.2018 | [2022/31] |
Former [2021/32] | HU | 27.03.2014 | |
AL | 13.06.2018 | ||
AT | 13.06.2018 | ||
CY | 13.06.2018 | ||
CZ | 13.06.2018 | ||
DK | 13.06.2018 | ||
EE | 13.06.2018 | ||
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
IT | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
MC | 13.06.2018 | ||
NL | 13.06.2018 | ||
PL | 13.06.2018 | ||
RO | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
SI | 13.06.2018 | ||
SK | 13.06.2018 | ||
SM | 13.06.2018 | ||
TR | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
GR | 14.09.2018 | ||
IS | 13.10.2018 | ||
PT | 15.10.2018 | ||
Former [2020/29] | AL | 13.06.2018 | |
AT | 13.06.2018 | ||
CY | 13.06.2018 | ||
CZ | 13.06.2018 | ||
DK | 13.06.2018 | ||
EE | 13.06.2018 | ||
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
IT | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
MC | 13.06.2018 | ||
NL | 13.06.2018 | ||
PL | 13.06.2018 | ||
RO | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
SI | 13.06.2018 | ||
SK | 13.06.2018 | ||
SM | 13.06.2018 | ||
TR | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
GR | 14.09.2018 | ||
IS | 13.10.2018 | ||
PT | 15.10.2018 | ||
Former [2020/16] | AL | 13.06.2018 | |
AT | 13.06.2018 | ||
CY | 13.06.2018 | ||
CZ | 13.06.2018 | ||
DK | 13.06.2018 | ||
EE | 13.06.2018 | ||
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
IT | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
MC | 13.06.2018 | ||
NL | 13.06.2018 | ||
PL | 13.06.2018 | ||
RO | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
SI | 13.06.2018 | ||
SK | 13.06.2018 | ||
SM | 13.06.2018 | ||
TR | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
GR | 14.09.2018 | ||
IS | 13.10.2018 | ||
Former [2019/51] | AL | 13.06.2018 | |
AT | 13.06.2018 | ||
CY | 13.06.2018 | ||
CZ | 13.06.2018 | ||
DK | 13.06.2018 | ||
EE | 13.06.2018 | ||
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
IT | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
MC | 13.06.2018 | ||
NL | 13.06.2018 | ||
PL | 13.06.2018 | ||
RO | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
SI | 13.06.2018 | ||
SK | 13.06.2018 | ||
SM | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
GR | 14.09.2018 | ||
IS | 13.10.2018 | ||
Former [2019/46] | AT | 13.06.2018 | |
CY | 13.06.2018 | ||
CZ | 13.06.2018 | ||
DK | 13.06.2018 | ||
EE | 13.06.2018 | ||
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
IT | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
MC | 13.06.2018 | ||
NL | 13.06.2018 | ||
PL | 13.06.2018 | ||
RO | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
SI | 13.06.2018 | ||
SK | 13.06.2018 | ||
SM | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
GR | 14.09.2018 | ||
IS | 13.10.2018 | ||
Former [2019/26] | AT | 13.06.2018 | |
CY | 13.06.2018 | ||
CZ | 13.06.2018 | ||
DK | 13.06.2018 | ||
EE | 13.06.2018 | ||
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
IT | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
NL | 13.06.2018 | ||
PL | 13.06.2018 | ||
RO | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
SI | 13.06.2018 | ||
SK | 13.06.2018 | ||
SM | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
GR | 14.09.2018 | ||
IS | 13.10.2018 | ||
Former [2019/11] | AT | 13.06.2018 | |
CY | 13.06.2018 | ||
CZ | 13.06.2018 | ||
EE | 13.06.2018 | ||
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
IT | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
NL | 13.06.2018 | ||
PL | 13.06.2018 | ||
RO | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
SK | 13.06.2018 | ||
SM | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
GR | 14.09.2018 | ||
IS | 13.10.2018 | ||
Former [2019/10] | AT | 13.06.2018 | |
CY | 13.06.2018 | ||
CZ | 13.06.2018 | ||
EE | 13.06.2018 | ||
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
NL | 13.06.2018 | ||
PL | 13.06.2018 | ||
RO | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
SK | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
GR | 14.09.2018 | ||
IS | 13.10.2018 | ||
Former [2019/09] | CY | 13.06.2018 | |
EE | 13.06.2018 | ||
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
NL | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
GR | 14.09.2018 | ||
IS | 13.10.2018 | ||
Former [2019/08] | CY | 13.06.2018 | |
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
NL | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
GR | 14.09.2018 | ||
IS | 13.10.2018 | ||
Former [2019/03] | CY | 13.06.2018 | |
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
NL | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
GR | 14.09.2018 | ||
Former [2018/52] | CY | 13.06.2018 | |
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
GR | 14.09.2018 | ||
Former [2018/51] | CY | 13.06.2018 | |
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
Former [2018/50] | CY | 13.06.2018 | |
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
LT | 13.06.2018 | ||
SE | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
Former [2018/49] | CY | 13.06.2018 | |
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
LT | 13.06.2018 | ||
SE | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
Former [2018/47] | ES | 13.06.2018 | |
FI | 13.06.2018 | ||
LT | 13.06.2018 | ||
NO | 13.09.2018 | Documents cited: | Search | [XI]US2011011396 (FANG XIAOLIN [CN]) [X] 1,3-5,7,10 * abstract * * paragraphs [0001] - [0016] * [I] 2,6,8,9; | [XI]US2013192618 (LI YONGHAI [CN], et al) [X] 1,3-5,7,10 * abstract * * paragraphs [0029] - [0037] *[I] 2,6,8,9; | [XI]US8528569 (NEWTON KYLE D [US]) [X] 1,3-5,7,10 * abstract * * column 4, line 5 - column 7, line 15 * [I] 2,6,8,9; | [XI]US2013319438 (LIU QIUMING [CN]) [X] 1,3-5,7,10 * abstract * * paragraphs [0043] - [0056] * [I] 2,6,8,9 | International search | [Y]CN102326869 (ZHIPING CHEN) [Y] 1 * description, paragraphs [0034]-[0047] and figures 1-4 *; | [A]CN202276831U (JOY CHANGZHOU ELECTRONIC TECHNOLOGY CO LTD) [A] 1-10 * the whole document *; | [A]CN102499488 (JOY CHANGZHOU ELECTRONIC TECHNOLOGY CO LTD) [A] 1-10 * the whole document *; | [A]CN202445134U (ZHIGUO YAN) [A] 1-10 * the whole document *; | [Y]CN202890463U (SHENZHEN SEEGO TECHNOLOGY CO LTD) [Y] 1 * description, paragraph [0018] and figure 1 *; | [A]US2013192615 (TUCKER CHRISTOPHER S [US], et al) [A] 1-10 * the whole document *; | [A]US2013192618 (LI YONGHAI [CN], et al) [A] 1-10* the whole document *; | [A]CN203467677U (JOYETECH CHANGZHOU ELECTRONIC TECHNOLOGY CO LTD) [A] 1-10 * the whole document *; | [E]CN103932402 (SHENZHEN MICROVAPOR TECHNOLOGY CO LTD) [E] 1-10 * claims 1-10 *; | [E]CN203828071U (SHENZHEN SMOORE TECHNOLOGY LTD) [E] 1-10 * claims 1-10 * |