EP3020229 - OPERATING COVERAGE-LIMITED DEVICES [Right-click to bookmark this link] | |||
Former [2016/20] | METHOD AND SYSTEM FOR OPERATING COVERAGE-LIMITED DEVICES | ||
[2019/24] | Status | No opposition filed within time limit Status updated on 11.06.2021 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 03.07.2020 | ||
Former | Grant of patent is intended Status updated on 27.02.2020 | ||
Former | Examination is in progress Status updated on 20.12.2019 | ||
Former | Grant of patent is intended Status updated on 24.09.2019 | ||
Former | Examination is in progress Status updated on 30.07.2019 | ||
Former | Grant of patent is intended Status updated on 17.06.2019 | ||
Former | Examination is in progress Status updated on 16.11.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Nokia Solutions and Networks Oy Karakaari 7 02610 Espoo / FI | [2019/36] |
Former [2016/20] | For all designated states Nokia Solutions and Networks Oy Karaportti 3 02610 Espoo / FI | Inventor(s) | 01 /
RATASUK, Rapeepat 4250 Forest Glen Drive Hoffman Estates, Illinois 60192 / US | 02 /
TAN, Jun 988 Cormer Drive Lake Zurich, Illinois 60047 / US | 03 /
YANG, Weidong 4425 Thornbark Court Hoffman Estates, Illinois 60192 / US | [2016/20] | Representative(s) | Nokia EPO representatives Nokia Technologies Oy Karakaari 7 02610 Espoo / FI | [2020/32] |
Former [2016/20] | Borgström, Markus Nokia Solutions and Networks GmbH & Co. KG T&I IPR Patent Administration St.-Martin-Straße 76 80240 München / DE | Application number, filing date | 14731576.6 | 12.06.2014 | [2016/20] | WO2014EP62174 | Priority number, date | US201313939092 | 10.07.2013 Original published format: US201313939092 | [2016/20] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015003868 | Date: | 15.01.2015 | Language: | EN | [2015/02] | Type: | A1 Application with search report | No.: | EP3020229 | Date: | 18.05.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 15.01.2015 takes the place of the publication of the European patent application. | [2016/20] | Type: | B1 Patent specification | No.: | EP3020229 | Date: | 05.08.2020 | Language: | EN | [2020/32] | Search report(s) | International search report - published on: | EP | 15.01.2015 | Classification | IPC: | H04W48/12, H04W4/70, H04W52/02, H04W88/10 | [2019/24] | CPC: |
H04W88/10 (EP,US);
H04L12/18 (US);
H04W4/06 (EP,US);
H04W4/70 (EP,US);
H04W48/12 (EP,US);
H04W52/0216 (EP,US);
|
Former IPC [2016/20] | H04W48/12, H04W4/00, H04W52/02, H04W88/10 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/20] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | BETREIBEN VON VORRICHTUNGEN MIT EINGESCHRÄNKTEM ABDECKUNGSBEREICH | [2019/24] | English: | OPERATING COVERAGE-LIMITED DEVICES | [2019/24] | French: | FAIRE FONCTIONNER DES DISPOSITIFS LIMITÉS EN COUVERTURE | [2019/24] |
Former [2016/20] | VERFAHREN UND SYSTEM ZUM BETREIBEN VON VORRICHTUNGEN MIT EINGESCHRÄNKTEM ABDECKUNGSBEREICH | ||
Former [2016/20] | METHOD AND SYSTEM FOR OPERATING COVERAGE-LIMITED DEVICES | ||
Former [2016/20] | PROCÉDÉ ET SYSTÈME POUR FAIRE FONCTIONNER DES DISPOSITIFS LIMITÉS EN COUVERTURE | Entry into regional phase | 10.02.2016 | National basic fee paid | 10.02.2016 | Designation fee(s) paid | 10.02.2016 | Examination fee paid | Examination procedure | 10.02.2016 | Examination requested [2016/20] | 27.07.2016 | Amendment by applicant (claims and/or description) | 16.11.2018 | Despatch of a communication from the examining division (Time limit: M04) | 12.03.2019 | Reply to a communication from the examining division | 18.06.2019 | Communication of intention to grant the patent | 30.07.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 25.09.2019 | Communication of intention to grant the patent | 18.12.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 28.02.2020 | Communication of intention to grant the patent | 26.06.2020 | Fee for grant paid | 26.06.2020 | Fee for publishing/printing paid | 26.06.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 07.05.2021 | No opposition filed within time limit [2021/28] | Fees paid | Renewal fee | 10.06.2016 | Renewal fee patent year 03 | 16.06.2017 | Renewal fee patent year 04 | 12.06.2018 | Renewal fee patent year 05 | 13.06.2019 | Renewal fee patent year 06 | 15.06.2020 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.06.2014 | AL | 05.08.2020 | AT | 05.08.2020 | CY | 05.08.2020 | CZ | 05.08.2020 | DK | 05.08.2020 | EE | 05.08.2020 | ES | 05.08.2020 | FI | 05.08.2020 | HR | 05.08.2020 | IT | 05.08.2020 | LT | 05.08.2020 | LV | 05.08.2020 | MC | 05.08.2020 | MK | 05.08.2020 | RO | 05.08.2020 | RS | 05.08.2020 | SE | 05.08.2020 | SI | 05.08.2020 | SK | 05.08.2020 | SM | 05.08.2020 | TR | 05.08.2020 | BG | 05.11.2020 | NO | 05.11.2020 | GR | 06.11.2020 | IS | 05.12.2020 | PT | 07.12.2020 | [2024/29] |
Former [2024/22] | HU | 12.06.2014 | |
AL | 05.08.2020 | ||
AT | 05.08.2020 | ||
CY | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
MK | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2023/30] | HU | 12.06.2014 | |
AL | 05.08.2020 | ||
AT | 05.08.2020 | ||
CY | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2023/29] | HU | 12.06.2014 | |
AL | 05.08.2020 | ||
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2022/08] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/36] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/34] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/28] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/25] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/23] | AT | 05.08.2020 | |
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/22] | AT | 05.08.2020 | |
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/21] | AT | 05.08.2020 | |
DK | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/10] | AT | 05.08.2020 | |
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/09] | AT | 05.08.2020 | |
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
LT | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
PT | 07.12.2020 | ||
Former [2021/08] | ES | 05.08.2020 | |
FI | 05.08.2020 | ||
LT | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
PT | 07.12.2020 | ||
Former [2021/07] | FI | 05.08.2020 | |
LT | 05.08.2020 | ||
NO | 05.11.2020 | Cited in | International search | [XAI]US2009111499 (BOSCH PETER [US], et al) [X] 1,12,23 * abstract * * figures 3,4 * * paragraph [0029] - paragraph [0037] * [A] 25 [I] 1-5,7-16,18-24; | [XAYI]US2010246462 (LINDGREN STEFAN [SE], et al) [X] 1,12,23 * abstract * * figure 3 * * paragraph [0021] * * paragraph [0041] - paragraph [0043] * * paragraph [0050] * * claims 1-11 * [A] 25 [Y] 6,17 [I] 1-5,7-16,18-24; | [YA] - INTERDIGITAL COMMUNICATIONS, "Triggering a detached MTC device", 3GPP DRAFT; S2-110673_TRIGGERING_A_DETACHED_DEVICE_DISC, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20110215), vol. SA WG2, no. Salt Lake City; 20110221, XP050523859 [Y] 6,17 * 1. Background * * 2.1 Solution 1- Trigger indication using the broadcast channel * * figure 1 * [A] 25 | [A] - NOKIA SIEMENS NETWORKS ET AL, "Conclusions from Coverage Enhancement Study for MTC", vol. RAN WG1, no. Fukuoka, Japan; 20130520 - 20130524, (20130511), 3GPP DRAFT; R1-132299, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_73/Docs/, (20130511), XP050698065 [A] 1-25 * 1. Introduction * * 2. Coverage Enhancement Techniques * | [A] - MEDIATEK INC, "On Required System Functionalities for MTC UEs Operating in Enhanced Coverage Mode", vol. RAN WG1, no. St Julian; 20130128 - 20130201, (20130119), 3GPP DRAFT; R1-130218 ON REQUIRED SYSTEM FUNCTIONALITIES FOR MTC UES OPERATING IN ENHANCED COVERAGE MODE, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_72/Docs/, (20130119), XP050663598 [A] 1-25 * 1. Introduction * * 2.2 System Information * * 2.3 Random Access * * 9.3 Required system functionality * | [A] - "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Study on provision of low-cost Machine-Type Communications (MTC) User Equipments (UEs) based on LTE (Release 12)", 3GPP STANDARD; 3GPP TR 36.888, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20130625), vol. RAN WG1, no. V12.0.0, pages 1 - 55, XP050692861 [A] 1-25 * 9.4 Concepts for coverage improvement * * 9.5 Analysis of Physical Channels and Signals * |