blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3005617

EP3005617 - METHOD FOR EFFICIENTLY SUPPORTING MULTIPLE SIMULTANEOUS GROUP PTT CALLS REQUIRING LOW CALL SETUP LATENCY [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  19.03.2021
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  10.04.2020
FormerGrant of patent is intended
Status updated on  07.01.2020
FormerExamination is in progress
Status updated on  23.06.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Qualcomm Incorporated
5775 Morehouse Drive
San Diego, CA 92121-1714 / US
[2016/15]
Inventor(s)01 / ANCHAN, Kirankumar Bhoja
5775 Morehouse Drive
San Diego, California 92121-1714 / US
02 / MAHENDRAN, Arungundram Chandrasekaran
5775 Morehouse Drive
San Diego, California 92121-1714 / US
 [2016/15]
Representative(s)Tomkins & Co
5 Dartmouth Road
Dublin 6 / IE
[2020/20]
Former [2016/15]O'Neill, Aoife, et al
Tomkins & Co.
5 Dartmouth Road
Dublin 6 / IE
Application number, filing date14735738.828.05.2014
[2016/15]
WO2014US39802
Priority number, dateUS201361828266P29.05.2013         Original published format: US 201361828266 P
US20141428815627.05.2014         Original published format: US201414288156
[2016/15]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2014193959
Date:04.12.2014
Language:EN
[2014/49]
Type: A1 Application with search report 
No.:EP3005617
Date:13.04.2016
Language:EN
The application published by WIPO in one of the EPO official languages on 04.12.2014 takes the place of the publication of the European patent application.
[2016/15]
Type: B1 Patent specification 
No.:EP3005617
Date:13.05.2020
Language:EN
[2020/20]
Search report(s)International search report - published on:EP04.12.2014
ClassificationIPC:H04L12/18, H04W4/08, H04W76/00, H04M3/56
[2016/15]
CPC:
H04W4/10 (EP,US); H04L12/185 (EP,US); H04L12/1877 (EP,US);
H04L12/189 (EP,US); H04W4/08 (EP,US); H04W76/40 (EP,US);
H04M3/56 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/15]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:VERFAHREN ZUR EFFIZIENTEN UNTERSTÜTZUNG MEHRERER SIMULTANER PTT-GRUPPENRUFE MIT GERINGER VERBINDUNGSAUFBAULATENZ[2016/15]
English:METHOD FOR EFFICIENTLY SUPPORTING MULTIPLE SIMULTANEOUS GROUP PTT CALLS REQUIRING LOW CALL SETUP LATENCY[2016/15]
French:PROCÉDÉ POUR LA PRISE EN CHARGE EFFICACE D'UNE PLURALITÉ D'APPELS PTT DE GROUPE SIMULTANÉS EXIGEANT UN FAIBLE TEMPS DE LATENCE POUR L'ÉTABLISSEMENT D'UN APPEL[2016/15]
Entry into regional phase15.10.2015National basic fee paid 
15.10.2015Designation fee(s) paid 
15.10.2015Examination fee paid 
Examination procedure27.03.2015Request for preliminary examination filed
International Preliminary Examining Authority: EP
15.10.2015Examination requested  [2016/15]
24.06.2016Amendment by applicant (claims and/or description)
22.06.2017Despatch of a communication from the examining division (Time limit: M06)
21.12.2017Reply to a communication from the examining division
08.01.2020Communication of intention to grant the patent
03.04.2020Fee for grant paid
03.04.2020Fee for publishing/printing paid
03.04.2020Receipt of the translation of the claim(s)
Opposition(s)16.02.2021No opposition filed within time limit [2021/16]
Fees paidRenewal fee
06.05.2016Renewal fee patent year 03
08.05.2017Renewal fee patent year 04
07.05.2018Renewal fee patent year 05
08.05.2019Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU28.05.2014
AL13.05.2020
AT13.05.2020
CY13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
MK13.05.2020
MT13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
TR13.05.2020
IE28.05.2020
LU28.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
[2022/32]
Former [2022/27]HU28.05.2014
AL13.05.2020
AT13.05.2020
CY13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
MT13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
TR13.05.2020
IE28.05.2020
LU28.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/24]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
IE28.05.2020
LU28.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/20]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
IE28.05.2020
LU28.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/15]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
LU28.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/13]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/10]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/09]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SM13.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/08]AL13.05.2020
DK13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SM13.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/07]AL13.05.2020
DK13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
RS13.05.2020
SE13.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/04]AL13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
RS13.05.2020
SE13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/01]FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
RS13.05.2020
SE13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/51]FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
RS13.05.2020
SE13.05.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/50]FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
SE13.05.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/48]FI13.05.2020
LT13.05.2020
SE13.05.2020
NO13.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/47]LT13.05.2020
NO13.08.2020
IS13.09.2020
Former [2020/46]IS13.09.2020
Cited inInternational search[XI]US2003083087  (EKL RANDY L [US], et al) [X] 1-7,12,13,15,16,26-32,37,38,40,41,51-54 * abstract * * figures 3,5 * * paragraph [0001] * * paragraph [0004] * * paragraph [0013] * * paragraph [0016] * * paragraph [0031] - paragraph [0035] * * paragraph [0042] - paragraph [0045] *[I] 8-11,14,17-25,33-36,39,42-50
ExaminationUS2013121133
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.