EP3027345 - METHOD FOR MACHINING TOOTH EDGES AND MACHINING STATION DESIGNED FOR THIS PURPOSE [Right-click to bookmark this link] | Status | Patent maintained as amended Status updated on 10.11.2023 Database last updated on 03.04.2025 | |
Former | The patent has been granted Status updated on 06.10.2017 | ||
Former | Grant of patent is intended Status updated on 06.08.2017 | Most recent event Tooltip | 10.11.2023 | Patent maintained (B2 publication) | published on 13.12.2023 [2023/50] | Applicant(s) | For all designated states Gleason-Pfauter Maschinenfabrik GmbH Daimlerstrasse 14 71636 Ludwigsburg / DE | [2016/23] | Inventor(s) | 01 /
KLEINBACH, Kurt Fichtenstraße 3 71717 Beilstein / DE | 02 /
KRESCHEL, Jürgen Seestraße 28 71282 Hemmingen / DE | 03 /
PHILIPPIN, Matthias Schillerstraße 13 71277 Rutesheim / DE | 04 /
WEPPELMANN, Edgar Birkenweg 2 71679 Asperg / DE | [2016/23] | Representative(s) | Leinweber & Zimmermann Patentanwalts-PartG mbB European Patent Attorneys Viktualienmarkt 8 80331 München / DE | [2023/50] |
Former [2016/23] | Leinweber & Zimmermann Rosental 7, II. Aufgang 80331 München / DE | Application number, filing date | 14745075.3 | 15.07.2014 | [2016/23] | WO2014EP01930 | Priority number, date | DE20131012797 | 31.07.2013 Original published format: DE102013012797 | [2016/23] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | WO2015014448 | Date: | 05.02.2015 | Language: | DE | [2015/05] | Type: | A2 Application without search report | No.: | EP3027345 | Date: | 08.06.2016 | Language: | DE | The application published by WIPO in one of the EPO official languages on 05.02.2015 takes the place of the publication of the European patent application. | [2016/23] | Type: | B1 Patent specification | No.: | EP3027345 | Date: | 08.11.2017 | Language: | DE | [2017/45] | Type: | B2 New European patent specification | No.: | EP3027345 | Date: | 13.12.2023 | Language: | DE | [2023/50] | Search report(s) | International search report - published on: | EP | 23.04.2015 | Classification | IPC: | B23F19/10, B23F5/16, B23F21/00 | [2016/23] | CPC: |
B23F19/102 (EP,US);
A47G25/80 (AT);
A47G25/86 (EP,AT);
B23F19/00 (EP);
B23F19/02 (EP);
B23F19/10 (EP,US);
B23F21/00 (EP,US);
B23F5/16 (EP);
B23F5/163 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/23] | Title | German: | VERFAHREN ZUM BEARBEITEN VON ZAHNKANTEN UND DAZU AUSGELEGTE BEARBEITUNGSSTATION | [2016/23] | English: | METHOD FOR MACHINING TOOTH EDGES AND MACHINING STATION DESIGNED FOR THIS PURPOSE | [2016/23] | French: | PROCÉDÉ D'USINAGE DES ARÊTES DE DENTS ET STATION D'USINAGE POUR METTRE EN OEUVRE LEDIT PROCÉDÉ | [2016/23] | Entry into regional phase | 14.01.2016 | National basic fee paid | 14.01.2016 | Designation fee(s) paid | 14.01.2016 | Examination fee paid | Examination procedure | 14.01.2016 | Examination requested [2016/23] | 19.09.2016 | Amendment by applicant (claims and/or description) | 07.08.2017 | Communication of intention to grant the patent | 28.09.2017 | Fee for grant paid | 28.09.2017 | Fee for publishing/printing paid | 28.09.2017 | Receipt of the translation of the claim(s) | Opposition(s) | Opponent(s) | 01
27.07.2018
01.08.2018
ADMISSIBLE Profilator GmbH & Co. KG Buchenhofener Strasse 35 42329 Wuppertal / DE Opponent's representative Grundmann, Dirk Rieder & Partner mbB Patentanwälte - Rechtsanwalt Yale-Allee 26 42329 Wuppertal / DE | 02
03.08.2018
08.08.2018
ADMISSIBLE FELSOMAT GmbH & Co. KG Gutenbergstrasse 13 75203 Königsbach-Stein / DE Opponent's representative Kohler Schmid Möbus Patentanwälte Partnerschaftsgesellschaft mbB Gropiusplatz 10 70563 Stuttgart / DE | [N/P] |
Former [2018/37] | |||
Opponent(s) | 01
27.07.2018
01.08.2018
ADMISSIBLE Profilator GmbH & Co. KG Buchenhofener Strasse 35 42329 Wuppertal / DE Opponent's representative Grundmann, Dirk Rieder & Partner mbB Patentanwälte - Rechtsanwalt Corneliusstrasse 45 42329 Wuppertal / DE | ||
02
03.08.2018
08.08.2018
ADMISSIBLE FELSOMAT GmbH & Co. KG Gutenbergstrasse 13 75203 Königsbach-Stein / DE Opponent's representative Kohler Schmid Möbus Patentanwälte Partnerschaftsgesellschaft mbB Gropiusplatz 10 70563 Stuttgart / DE | |||
Former [2018/36] | |||
Opponent(s) | 01
27.07.2018
01.08.2018
ADMISSIBLE Profilator GmbH & Co. KG Buchenhofener Strasse 35 42329 Wuppertal / DE Opponent's representative Grundmann, Dirk Rieder & Partner mbB Patentanwälte - Rechtsanwalt Corneliusstrasse 45 42329 Wuppertal / DE | 21.08.2018 | Invitation to proprietor to file observations on the notice of opposition | 17.12.2018 | Reply of patent proprietor to notice(s) of opposition | 13.08.2020 | Cancellation of oral proceeding that was planned for 24.09.2020 | 24.09.2020 | Date of oral proceedings | 19.11.2021 | Date of oral proceedings | 07.01.2022 | Despatch of interlocutory decision in opposition | 07.01.2022 | Despatch of minutes of oral proceedings | 18.09.2023 | Legal effect of interlocutory decision in opposition | 09.10.2023 | Despatch of communication that the patent will be maintained as amended | 03.11.2023 | Fee for printing new specification paid | Appeal following opposition | 16.03.2022 | Appeal received No. T0613/22 | 16.03.2022 | Payment of appeal fee | 17.05.2022 | Statement of grounds filed | 18.09.2023 | Result of appeal procedure: appeal of the proprietor was rejected | 21.09.2023 | Despatch of the decision of the Board of Appeal | 04.03.2022 | Appeal received No. T0613/22 | 04.03.2022 | Payment of appeal fee | 13.05.2022 | Statement of grounds filed | 18.09.2023 | Result of appeal procedure: appeal of the proprietor was rejected | 21.09.2023 | Despatch of the decision of the Board of Appeal | Fees paid | Renewal fee | 11.07.2016 | Renewal fee patent year 03 | 27.07.2017 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 08.11.2017 | CY | 08.11.2017 | DK | 08.11.2017 | EE | 08.11.2017 | ES | 08.11.2017 | FI | 08.11.2017 | HR | 08.11.2017 | LT | 08.11.2017 | LV | 08.11.2017 | MC | 08.11.2017 | MK | 08.11.2017 | MT | 08.11.2017 | NL | 08.11.2017 | PL | 08.11.2017 | PT | 08.11.2017 | RO | 08.11.2017 | RS | 08.11.2017 | SE | 08.11.2017 | SI | 08.11.2017 | SM | 08.11.2017 | TR | 08.11.2017 | BG | 08.02.2018 | NO | 08.02.2018 | GR | 09.02.2018 | IS | 08.03.2018 | GB | 15.07.2018 | IE | 15.07.2018 | LU | 15.07.2018 | BE | 31.07.2018 | FR | 31.07.2018 | SK | 15.07.2020 | HU | 16.07.2020 | [2021/28] |
Former [2021/22] | AL | 08.11.2017 | |
CY | 08.11.2017 | ||
DK | 08.11.2017 | ||
EE | 08.11.2017 | ||
ES | 08.11.2017 | ||
FI | 08.11.2017 | ||
HR | 08.11.2017 | ||
LT | 08.11.2017 | ||
LV | 08.11.2017 | ||
MC | 08.11.2017 | ||
MK | 08.11.2017 | ||
MT | 08.11.2017 | ||
NL | 08.11.2017 | ||
PL | 08.11.2017 | ||
PT | 08.11.2017 | ||
RO | 08.11.2017 | ||
RS | 08.11.2017 | ||
SE | 08.11.2017 | ||
SI | 08.11.2017 | ||
SM | 08.11.2017 | ||
TR | 08.11.2017 | ||
BG | 08.02.2018 | ||
NO | 08.02.2018 | ||
GR | 09.02.2018 | ||
IS | 08.03.2018 | ||
GB | 15.07.2018 | ||
IE | 15.07.2018 | ||
LU | 15.07.2018 | ||
BE | 31.07.2018 | ||
FR | 31.07.2018 | ||
HU | 16.07.2020 | ||
Former [2020/34] | AL | 08.11.2017 | |
CY | 08.11.2017 | ||
DK | 08.11.2017 | ||
EE | 08.11.2017 | ||
ES | 08.11.2017 | ||
FI | 08.11.2017 | ||
HR | 08.11.2017 | ||
LT | 08.11.2017 | ||
LV | 08.11.2017 | ||
MC | 08.11.2017 | ||
MK | 08.11.2017 | ||
MT | 08.11.2017 | ||
NL | 08.11.2017 | ||
PL | 08.11.2017 | ||
PT | 08.11.2017 | ||
RO | 08.11.2017 | ||
RS | 08.11.2017 | ||
SE | 08.11.2017 | ||
SI | 08.11.2017 | ||
SM | 08.11.2017 | ||
TR | 08.11.2017 | ||
BG | 08.02.2018 | ||
NO | 08.02.2018 | ||
GR | 09.02.2018 | ||
IS | 08.03.2018 | ||
GB | 15.07.2018 | ||
IE | 15.07.2018 | ||
LU | 15.07.2018 | ||
BE | 31.07.2018 | ||
FR | 31.07.2018 | ||
Former [2020/31] | CY | 08.11.2017 | |
DK | 08.11.2017 | ||
EE | 08.11.2017 | ||
ES | 08.11.2017 | ||
FI | 08.11.2017 | ||
HR | 08.11.2017 | ||
LT | 08.11.2017 | ||
LV | 08.11.2017 | ||
MC | 08.11.2017 | ||
MK | 08.11.2017 | ||
MT | 08.11.2017 | ||
NL | 08.11.2017 | ||
PL | 08.11.2017 | ||
PT | 08.11.2017 | ||
RO | 08.11.2017 | ||
RS | 08.11.2017 | ||
SE | 08.11.2017 | ||
SI | 08.11.2017 | ||
SM | 08.11.2017 | ||
TR | 08.11.2017 | ||
BG | 08.02.2018 | ||
NO | 08.02.2018 | ||
GR | 09.02.2018 | ||
IS | 08.03.2018 | ||
GB | 15.07.2018 | ||
IE | 15.07.2018 | ||
LU | 15.07.2018 | ||
BE | 31.07.2018 | ||
FR | 31.07.2018 | ||
Former [2020/28] | CY | 08.11.2017 | |
DK | 08.11.2017 | ||
EE | 08.11.2017 | ||
ES | 08.11.2017 | ||
FI | 08.11.2017 | ||
HR | 08.11.2017 | ||
LT | 08.11.2017 | ||
LV | 08.11.2017 | ||
MC | 08.11.2017 | ||
MT | 08.11.2017 | ||
NL | 08.11.2017 | ||
PL | 08.11.2017 | ||
PT | 08.11.2017 | ||
RO | 08.11.2017 | ||
RS | 08.11.2017 | ||
SE | 08.11.2017 | ||
SI | 08.11.2017 | ||
SM | 08.11.2017 | ||
TR | 08.11.2017 | ||
BG | 08.02.2018 | ||
NO | 08.02.2018 | ||
GR | 09.02.2018 | ||
IS | 08.03.2018 | ||
GB | 15.07.2018 | ||
IE | 15.07.2018 | ||
LU | 15.07.2018 | ||
BE | 31.07.2018 | ||
FR | 31.07.2018 | ||
Former [2020/16] | CY | 08.11.2017 | |
DK | 08.11.2017 | ||
EE | 08.11.2017 | ||
ES | 08.11.2017 | ||
FI | 08.11.2017 | ||
HR | 08.11.2017 | ||
LT | 08.11.2017 | ||
LV | 08.11.2017 | ||
MC | 08.11.2017 | ||
MT | 08.11.2017 | ||
NL | 08.11.2017 | ||
PL | 08.11.2017 | ||
RO | 08.11.2017 | ||
RS | 08.11.2017 | ||
SE | 08.11.2017 | ||
SI | 08.11.2017 | ||
SM | 08.11.2017 | ||
TR | 08.11.2017 | ||
BG | 08.02.2018 | ||
NO | 08.02.2018 | ||
GR | 09.02.2018 | ||
IS | 08.03.2018 | ||
GB | 15.07.2018 | ||
IE | 15.07.2018 | ||
LU | 15.07.2018 | ||
BE | 31.07.2018 | ||
FR | 31.07.2018 | ||
Former [2019/23] | CY | 08.11.2017 | |
DK | 08.11.2017 | ||
EE | 08.11.2017 | ||
ES | 08.11.2017 | ||
FI | 08.11.2017 | ||
HR | 08.11.2017 | ||
LT | 08.11.2017 | ||
LV | 08.11.2017 | ||
MC | 08.11.2017 | ||
MT | 08.11.2017 | ||
NL | 08.11.2017 | ||
PL | 08.11.2017 | ||
RO | 08.11.2017 | ||
RS | 08.11.2017 | ||
SE | 08.11.2017 | ||
SI | 08.11.2017 | ||
SM | 08.11.2017 | ||
BG | 08.02.2018 | ||
NO | 08.02.2018 | ||
GR | 09.02.2018 | ||
IS | 08.03.2018 | ||
GB | 15.07.2018 | ||
IE | 15.07.2018 | ||
LU | 15.07.2018 | ||
BE | 31.07.2018 | ||
FR | 31.07.2018 | ||
Former [2019/21] | CY | 08.11.2017 | |
DK | 08.11.2017 | ||
EE | 08.11.2017 | ||
ES | 08.11.2017 | ||
FI | 08.11.2017 | ||
HR | 08.11.2017 | ||
LT | 08.11.2017 | ||
LV | 08.11.2017 | ||
MC | 08.11.2017 | ||
MT | 08.11.2017 | ||
NL | 08.11.2017 | ||
PL | 08.11.2017 | ||
RO | 08.11.2017 | ||
RS | 08.11.2017 | ||
SE | 08.11.2017 | ||
SI | 08.11.2017 | ||
SM | 08.11.2017 | ||
BG | 08.02.2018 | ||
NO | 08.02.2018 | ||
GR | 09.02.2018 | ||
IS | 08.03.2018 | ||
GB | 15.07.2018 | ||
IE | 15.07.2018 | ||
LU | 15.07.2018 | ||
Former [2019/19] | CY | 08.11.2017 | |
DK | 08.11.2017 | ||
EE | 08.11.2017 | ||
ES | 08.11.2017 | ||
FI | 08.11.2017 | ||
HR | 08.11.2017 | ||
LT | 08.11.2017 | ||
LV | 08.11.2017 | ||
MC | 08.11.2017 | ||
MT | 08.11.2017 | ||
NL | 08.11.2017 | ||
PL | 08.11.2017 | ||
RO | 08.11.2017 | ||
RS | 08.11.2017 | ||
SE | 08.11.2017 | ||
SI | 08.11.2017 | ||
SM | 08.11.2017 | ||
BG | 08.02.2018 | ||
NO | 08.02.2018 | ||
GR | 09.02.2018 | ||
IS | 08.03.2018 | ||
IE | 15.07.2018 | ||
LU | 15.07.2018 | ||
Former [2019/17] | CY | 08.11.2017 | |
DK | 08.11.2017 | ||
EE | 08.11.2017 | ||
ES | 08.11.2017 | ||
FI | 08.11.2017 | ||
HR | 08.11.2017 | ||
LT | 08.11.2017 | ||
LV | 08.11.2017 | ||
MC | 08.11.2017 | ||
MT | 08.11.2017 | ||
NL | 08.11.2017 | ||
PL | 08.11.2017 | ||
RO | 08.11.2017 | ||
RS | 08.11.2017 | ||
SE | 08.11.2017 | ||
SI | 08.11.2017 | ||
SM | 08.11.2017 | ||
BG | 08.02.2018 | ||
NO | 08.02.2018 | ||
GR | 09.02.2018 | ||
IS | 08.03.2018 | ||
LU | 15.07.2018 | ||
Former [2019/15] | CY | 08.11.2017 | |
DK | 08.11.2017 | ||
EE | 08.11.2017 | ||
ES | 08.11.2017 | ||
FI | 08.11.2017 | ||
HR | 08.11.2017 | ||
LT | 08.11.2017 | ||
LV | 08.11.2017 | ||
MC | 08.11.2017 | ||
MT | 08.11.2017 | ||
NL | 08.11.2017 | ||
PL | 08.11.2017 | ||
RO | 08.11.2017 | ||
RS | 08.11.2017 | ||
SE | 08.11.2017 | ||
SI | 08.11.2017 | ||
SM | 08.11.2017 | ||
BG | 08.02.2018 | ||
NO | 08.02.2018 | ||
GR | 09.02.2018 | ||
IS | 08.03.2018 | ||
Former [2018/52] | CY | 08.11.2017 | |
DK | 08.11.2017 | ||
EE | 08.11.2017 | ||
ES | 08.11.2017 | ||
FI | 08.11.2017 | ||
HR | 08.11.2017 | ||
LT | 08.11.2017 | ||
LV | 08.11.2017 | ||
MT | 08.11.2017 | ||
NL | 08.11.2017 | ||
PL | 08.11.2017 | ||
RO | 08.11.2017 | ||
RS | 08.11.2017 | ||
SE | 08.11.2017 | ||
SI | 08.11.2017 | ||
SM | 08.11.2017 | ||
BG | 08.02.2018 | ||
NO | 08.02.2018 | ||
GR | 09.02.2018 | ||
IS | 08.03.2018 | ||
Former [2018/43] | CY | 08.11.2017 | |
DK | 08.11.2017 | ||
EE | 08.11.2017 | ||
ES | 08.11.2017 | ||
FI | 08.11.2017 | ||
HR | 08.11.2017 | ||
LT | 08.11.2017 | ||
LV | 08.11.2017 | ||
MT | 08.11.2017 | ||
NL | 08.11.2017 | ||
PL | 08.11.2017 | ||
RO | 08.11.2017 | ||
RS | 08.11.2017 | ||
SE | 08.11.2017 | ||
SM | 08.11.2017 | ||
BG | 08.02.2018 | ||
NO | 08.02.2018 | ||
GR | 09.02.2018 | ||
IS | 08.03.2018 | ||
Former [2018/40] | CY | 08.11.2017 | |
DK | 08.11.2017 | ||
EE | 08.11.2017 | ||
ES | 08.11.2017 | ||
FI | 08.11.2017 | ||
HR | 08.11.2017 | ||
LT | 08.11.2017 | ||
LV | 08.11.2017 | ||
NL | 08.11.2017 | ||
PL | 08.11.2017 | ||
RO | 08.11.2017 | ||
RS | 08.11.2017 | ||
SE | 08.11.2017 | ||
SM | 08.11.2017 | ||
BG | 08.02.2018 | ||
NO | 08.02.2018 | ||
GR | 09.02.2018 | ||
IS | 08.03.2018 | ||
Former [2018/37] | CY | 08.11.2017 | |
DK | 08.11.2017 | ||
EE | 08.11.2017 | ||
ES | 08.11.2017 | ||
FI | 08.11.2017 | ||
HR | 08.11.2017 | ||
LT | 08.11.2017 | ||
LV | 08.11.2017 | ||
NL | 08.11.2017 | ||
PL | 08.11.2017 | ||
RS | 08.11.2017 | ||
SE | 08.11.2017 | ||
SM | 08.11.2017 | ||
BG | 08.02.2018 | ||
NO | 08.02.2018 | ||
GR | 09.02.2018 | ||
IS | 08.03.2018 | ||
Former [2018/35] | CY | 08.11.2017 | |
DK | 08.11.2017 | ||
EE | 08.11.2017 | ||
ES | 08.11.2017 | ||
FI | 08.11.2017 | ||
HR | 08.11.2017 | ||
LT | 08.11.2017 | ||
LV | 08.11.2017 | ||
NL | 08.11.2017 | ||
RS | 08.11.2017 | ||
SE | 08.11.2017 | ||
BG | 08.02.2018 | ||
NO | 08.02.2018 | ||
GR | 09.02.2018 | ||
IS | 08.03.2018 | ||
Former [2018/24] | ES | 08.11.2017 | |
FI | 08.11.2017 | ||
HR | 08.11.2017 | ||
LT | 08.11.2017 | ||
LV | 08.11.2017 | ||
NL | 08.11.2017 | ||
RS | 08.11.2017 | ||
SE | 08.11.2017 | ||
BG | 08.02.2018 | ||
NO | 08.02.2018 | ||
GR | 09.02.2018 | ||
IS | 08.03.2018 | ||
Former [2018/23] | ES | 08.11.2017 | |
FI | 08.11.2017 | ||
HR | 08.11.2017 | ||
LT | 08.11.2017 | ||
NL | 08.11.2017 | ||
RS | 08.11.2017 | ||
SE | 08.11.2017 | ||
NO | 08.02.2018 | ||
GR | 09.02.2018 | ||
IS | 08.03.2018 | ||
Former [2018/22] | ES | 08.11.2017 | |
FI | 08.11.2017 | ||
LT | 08.11.2017 | ||
NL | 08.11.2017 | ||
NO | 08.02.2018 | Cited in | International search | [Y]US2295148 (WITHAM WINFRED A) [Y] 20* the whole document *; | [XY]US2683399 (DODGE WALLACE H) [X] 1,2,4,8-11,16-19,21 * the whole document * [Y] 3,5,6,13-15,20,22; | [X]GB818135 (NAT BROACH & MACH) [X] 1,2,10,21 * the whole document *; | [X]DE2157619 (MASCHINEN- UND ZAHNRADFABRIK [DE]) [X] 1,2,10,21 * the whole document *; | [X]JPS618221 (MITSUBISHI HEAVY IND LTD) [X] 1,2,7,10,12,21 * abstract *; | [Y]EP2537615 (KLINGELNBERG AG [CH]) [Y] 3,5,6,13-15,22 * paragraph [0023] - paragraph [0023]; figure - * * paragraph [0119] - paragraph [0121] * | Examination | FR1447376 | Opposition | DE243514 | US2295148 | US2683399 | GB818135 | DE2157619 | DE3312984 | JPS618221 | EP0107826 | DE3734653 | JPS6451224 | DE4319326 | EP1270127 | DE102006019325 | DE102007015357 | WO2009017248 | EP1495824 | DE102009018405 | EP2246138 | DE102009019433 | EP2520391 | WO2012159942 | EP2537615 | US3264940 | DE102009003601 | WO2012152660 | EP0107826 | - Bernard & Company, "Gear Pointing Animation - GMTA", Youtube, (20120904), URL: https://www.youtube.com/watch?v=seePhM7jhh4, XP054978757 | - "Die Ergänzende Zahnformung", THOMAS BAUSCH et al., Innovative Zahnradfertigung, expert Verlag, (20060000), pages 304 - 327, XP009187196 | - "Fase", Wikipedia, (20130327), pages 1 - 2, URL: https://de.wikipedia.org/wiki/Fase, XP055512847 | - Präwema Antriebstechnik GmbH, "High Speed Chamfering", Firmendruckschrift | - "Schnittdaten Fermo", Uddeholm, (20050203), XP055512856 | - "Verfahren und Maschinen", Thomas Bausch, Innovative Zahnradfertigung, Expert -Verlag, (20060000), vol. 3, page 322,325, XP055511380 | - "Verfahren und Maschinen", Thomas Bausch, Innovative Zahnradfertigung, Expert -Verlag, (20060000), vol. 3, page 322,325 |