blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3036054

EP3036054 - PROCESS FOR PRODUCING A MULTILAYER PIPE BY EXPANSION [Right-click to bookmark this link]
Former [2016/26]PROCESS FOR PRODUCING A MULTILAYER PIPE BY EXPANSION AND MULTILAYER PIPE PRODUCED BY SAID PROCESS
[2020/32]
StatusNo opposition filed within time limit
Status updated on  05.11.2021
Database last updated on 22.08.2024
FormerThe patent has been granted
Status updated on  27.11.2020
FormerGrant of patent is intended
Status updated on  23.07.2020
FormerExamination is in progress
Status updated on  02.12.2019
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Vallourec Tubos Do Brasil S.A.
Av. Olinto Meireles, 65
Barreiro de Baixo
30640-010 Belo Horizonte, MG / BR
[2016/26]
Inventor(s)01 / SILVEIRA E SILVA, Júlio Márcio
Rua Adolfo Pereira 119/601
Anchieta
30310-350 Belo Horizonte-MG / BR
02 / EBELING, Timo
Rua Alessandra Salum Cadar 920/45
Buritis
30575-190 Belo Horizonte-MG / BR
03 / DA SILVA PERDIGÃO, Hezick
Rua Conde de Luminares 179
Madre Gertrudes
30512-720 Belo Horizonte-MG / BR
04 / GRANHA GIORGINI, Danielle
Rua Maria Heilbuth Surette 420/402
Buritis
30575-100 Belo Horizonte-MG / BR
05 / ALVES PINHEIRO, Gustavo
Av. Protásio de Oliveira Pena 50/402
Buritis
30575-360 Belo Horizonte-MG / BR
06 / AMES, Jochen Peter
R. Verdum 95/504
Grajaú
30431-183 Belo Horizonte-MG / BR
07 / DA SILVA PENNA, Antônio Wagner
Av. Juscelino Kubistchek 1314
Amazonas
Contagem-MG / BR
 [2016/26]
Representative(s)de Kernier, Gabriel
Cabinet Netter Conseils en Propriété Industrielle 36, avenue Hoche
75008 Paris / FR
[2016/26]
Application number, filing date14747803.623.07.2014
[2016/26]
WO2014BR00250
Priority number, dateBR2013102166323.08.2013         Original published format: BR102013021663
[2016/26]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO2014169367
Date:23.10.2014
Language:EN
[2014/43]
Type: A2 Application without search report 
No.:EP3036054
Date:29.06.2016
Language:EN
The application published by WIPO in one of the EPO official languages on 23.10.2014 takes the place of the publication of the European patent application.
[2016/26]
Type: B1 Patent specification 
No.:EP3036054
Date:30.12.2020
Language:EN
[2020/53]
Search report(s)International search report - published on:EP31.12.2014
ClassificationIPC:B21C37/15, B23P11/02, F16L9/04, B21C37/06
[2016/26]
CPC:
B21C37/154 (EP,KR,US); B21D39/04 (KR); B24C1/08 (KR);
F16L58/00 (US); F16L9/02 (EP,KR,US); F16N15/02 (KR);
B21C37/06 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/26]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:VERFAHREN ZUR HERSTELLUNG EINES MEHRSCHICHTIGEN ROHRES DURCH EXPANSION[2020/32]
English:PROCESS FOR PRODUCING A MULTILAYER PIPE BY EXPANSION[2020/32]
French:PROCESSUS DE PRODUCTION D'UN TUYAU À COUCHES MULTIPLES PAR EXPANSION[2020/32]
Former [2016/26]VERFAHREN ZUR HERSTELLUNG EINES MEHRSCHICHTIGEN ROHRES DURCH EXPANSION UND IN DIESEM VERFAHREN HERGESTELLTES MEHRSCHICHTIGES ROHR
Former [2016/26]PROCESS FOR PRODUCING A MULTILAYER PIPE BY EXPANSION AND MULTILAYER PIPE PRODUCED BY SAID PROCESS
Former [2016/26]PROCESSUS DE PRODUCTION D'UN TUYAU À COUCHES MULTIPLES PAR EXPANSION ET TUYAU À COUCHES MULTIPLES PRODUIT PAR LEDIT PROCESSUS
Entry into regional phase23.03.2016National basic fee paid 
23.03.2016Designation fee(s) paid 
23.03.2016Examination fee paid 
Examination procedure23.03.2016Examination requested  [2016/26]
28.04.2017Amendment by applicant (claims and/or description)
03.12.2019Despatch of a communication from the examining division (Time limit: M04)
16.04.2020Reply to a communication from the examining division
24.07.2020Communication of intention to grant the patent
18.11.2020Fee for grant paid
18.11.2020Fee for publishing/printing paid
18.11.2020Receipt of the translation of the claim(s)
Opposition(s)01.10.2021No opposition filed within time limit [2021/49]
Fees paidRenewal fee
20.07.2016Renewal fee patent year 03
21.07.2017Renewal fee patent year 04
25.07.2018Renewal fee patent year 05
16.07.2019Renewal fee patent year 06
24.07.2020Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU23.07.2014
AL30.12.2020
AT30.12.2020
CY30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
MC30.12.2020
MK30.12.2020
NL30.12.2020
PL30.12.2020
RO30.12.2020
RS30.12.2020
SE30.12.2020
SI30.12.2020
SK30.12.2020
SM30.12.2020
TR30.12.2020
BG30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
IE23.07.2021
LU23.07.2021
BE31.07.2021
CH31.07.2021
LI31.07.2021
[2024/29]
Former [2024/22]HU23.07.2014
AL30.12.2020
AT30.12.2020
CY30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
MC30.12.2020
MK30.12.2020
NL30.12.2020
PL30.12.2020
RO30.12.2020
RS30.12.2020
SE30.12.2020
SI30.12.2020
SK30.12.2020
SM30.12.2020
BG30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
IE23.07.2021
LU23.07.2021
BE31.07.2021
CH31.07.2021
LI31.07.2021
Former [2023/33]HU23.07.2014
AL30.12.2020
AT30.12.2020
CY30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
MC30.12.2020
NL30.12.2020
PL30.12.2020
RO30.12.2020
RS30.12.2020
SE30.12.2020
SI30.12.2020
SK30.12.2020
SM30.12.2020
BG30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
IE23.07.2021
LU23.07.2021
BE31.07.2021
CH31.07.2021
LI31.07.2021
Former [2023/30]HU23.07.2014
AL30.12.2020
AT30.12.2020
CY30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
MC30.12.2020
NL30.12.2020
PL30.12.2020
RO30.12.2020
RS30.12.2020
SE30.12.2020
SI30.12.2020
SK30.12.2020
BG30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
IE23.07.2021
LU23.07.2021
BE31.07.2021
CH31.07.2021
LI31.07.2021
Former [2023/28]HU23.07.2014
AL30.12.2020
AT30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
MC30.12.2020
NL30.12.2020
PL30.12.2020
RO30.12.2020
RS30.12.2020
SE30.12.2020
SI30.12.2020
SK30.12.2020
BG30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
IE23.07.2021
LU23.07.2021
BE31.07.2021
CH31.07.2021
LI31.07.2021
Former [2022/35]AL30.12.2020
AT30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
MC30.12.2020
NL30.12.2020
PL30.12.2020
RO30.12.2020
RS30.12.2020
SE30.12.2020
SI30.12.2020
SK30.12.2020
BG30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
IE23.07.2021
LU23.07.2021
BE31.07.2021
CH31.07.2021
LI31.07.2021
Former [2022/34]AL30.12.2020
AT30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
MC30.12.2020
NL30.12.2020
PL30.12.2020
RO30.12.2020
RS30.12.2020
SE30.12.2020
SI30.12.2020
SK30.12.2020
BG30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
LU23.07.2021
BE31.07.2021
CH31.07.2021
LI31.07.2021
Former [2022/23]AL30.12.2020
AT30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
MC30.12.2020
NL30.12.2020
PL30.12.2020
RO30.12.2020
RS30.12.2020
SE30.12.2020
SI30.12.2020
SK30.12.2020
BG30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
LU23.07.2021
CH31.07.2021
LI31.07.2021
Former [2022/21]AL30.12.2020
AT30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
MC30.12.2020
NL30.12.2020
PL30.12.2020
RO30.12.2020
RS30.12.2020
SE30.12.2020
SI30.12.2020
SK30.12.2020
BG30.03.2021
GR31.03.2021
PT30.04.2021
CH31.07.2021
LI31.07.2021
Former [2022/18]AL30.12.2020
AT30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
MC30.12.2020
NL30.12.2020
PL30.12.2020
RO30.12.2020
RS30.12.2020
SE30.12.2020
SI30.12.2020
SK30.12.2020
BG30.03.2021
GR31.03.2021
PT30.04.2021
Former [2022/13]AL30.12.2020
AT30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
NL30.12.2020
PL30.12.2020
RO30.12.2020
RS30.12.2020
SE30.12.2020
SI30.12.2020
SK30.12.2020
BG30.03.2021
GR31.03.2021
PT30.04.2021
Former [2022/10]AL30.12.2020
AT30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
NL30.12.2020
PL30.12.2020
RO30.12.2020
RS30.12.2020
SE30.12.2020
SK30.12.2020
BG30.03.2021
GR31.03.2021
PT30.04.2021
Former [2021/49]AL30.12.2020
AT30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
NL30.12.2020
PL30.12.2020
RO30.12.2020
RS30.12.2020
SE30.12.2020
SK30.12.2020
BG30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
Former [2021/45]AL30.12.2020
AT30.12.2020
CZ30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
NL30.12.2020
PL30.12.2020
RO30.12.2020
RS30.12.2020
SE30.12.2020
SK30.12.2020
BG30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
Former [2021/42]AT30.12.2020
CZ30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
NL30.12.2020
PL30.12.2020
RO30.12.2020
RS30.12.2020
SE30.12.2020
SK30.12.2020
BG30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
Former [2021/39]AT30.12.2020
CZ30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
NL30.12.2020
PL30.12.2020
RO30.12.2020
RS30.12.2020
SE30.12.2020
SK30.12.2020
BG30.03.2021
GR31.03.2021
PT30.04.2021
Former [2021/37]AT30.12.2020
CZ30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
NL30.12.2020
RO30.12.2020
RS30.12.2020
SE30.12.2020
SK30.12.2020
BG30.03.2021
GR31.03.2021
PT30.04.2021
Former [2021/36]CZ30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
NL30.12.2020
RO30.12.2020
RS30.12.2020
SE30.12.2020
SK30.12.2020
BG30.03.2021
GR31.03.2021
PT30.04.2021
Former [2021/35]CZ30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
NL30.12.2020
RO30.12.2020
RS30.12.2020
SE30.12.2020
SK30.12.2020
BG30.03.2021
GR31.03.2021
PT30.04.2021
Former [2021/34]CZ30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
NL30.12.2020
RS30.12.2020
SE30.12.2020
BG30.03.2021
GR31.03.2021
PT30.04.2021
Former [2021/33]FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
RS30.12.2020
SE30.12.2020
BG30.03.2021
GR31.03.2021
PT30.04.2021
Former [2021/28]FI30.12.2020
HR30.12.2020
LV30.12.2020
RS30.12.2020
SE30.12.2020
BG30.03.2021
GR31.03.2021
Former [2021/24]FI30.12.2020
LV30.12.2020
RS30.12.2020
SE30.12.2020
BG30.03.2021
GR31.03.2021
Former [2021/23]FI30.12.2020
LV30.12.2020
RS30.12.2020
SE30.12.2020
GR31.03.2021
Former [2021/22]FI30.12.2020
RS30.12.2020
Former [2021/20]FI30.12.2020
Cited inInternational search[A]US3156042  (REED DANIEL J) [A] 1,5,6,8,9,13,14 * the whole document *;
 [XI]JPS61283415  (KAWASAKI HEAVY IND LTD) [X] 1,11,14,17,19,20,26 * abstract * [I] 2,3,7,10,15,16,18,21;
 [A]US5097585  (KLEMM ROBERT E [US]) [A] 1,5,11,14* column 2, line 36 - column 7, line 15; figures 1-3 *;
 [XAI]WO2004103603  (CLADTEK INTERNAT PTY LTD [AU], et al) [X] 17,19,20,22-24,26 * page 2, paragraph l - page 3, paragraph l * * page 6, paragraph 6 - page 8, paragraph 3 * * page 11, paragraph l - page 12, paragraph 3; figures 1-7 * [A] 1,4,12,14 [I] 18,21,25;
 [X]DE102010044463  (AWS SCHAEFER TECHNOLOGIE GMBH [DE]) [X] 17,20,26 * the whole document *
ExaminationJPS5545553
by applicantUS3598156
 GB2085330
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.