blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3183788

EP3183788 - ELECTRIC FIELD CONTROL DEVICE FOR HIGH POWER CABLE AND METHOD FOR MANUFACTURING THEREOF [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.02.2021
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  06.03.2020
FormerGrant of patent is intended
Status updated on  07.10.2019
FormerExamination is in progress
Status updated on  27.04.2018
FormerRequest for examination was made
Status updated on  26.05.2017
FormerThe international publication has been made
Status updated on  18.11.2016
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
NKT HV Cables AB
Verkövägen 102
371 60 Lyckeby / SE
[2020/12]
Former [2017/38]For all designated states
NKT HV Cables GmbH
Brown Boveri Strasse 6
5400 Baden / CH
Former [2017/26]For all designated states
ABB HV Cables (Switzerland) GmbH
Brown Boveri Strasse 6
5400 Baden, Aargau / CH
Inventor(s)01 / FÄLTH, Fredrik
Byggmästaregatan 2C
S-371 38 Karlskrona / SE
02 / SALTZER, Markus
Patrullvägen 9
S-371 52 Karlskrona / SE
03 / BVMP, Santhosh
H. No: 14-76/2 P&T Colony
Behind PostOffice
Dilsuknagar
Hyderabad Andrapradesh 500060 / IN
04 / GHORBANI, Hossein
Törngatan 2B
21565 Malmö / SE
 [2017/26]
Representative(s)Kransell & Wennborg KB
P.O. Box 27834
115 93 Stockholm / SE
[2020/15]
Former [2017/26]Axell, Kristina
ABB AB
Intellectual Property
Forskargränd 7
721 78 Västerås / SE
Application number, filing date14756031.222.08.2014
[2017/26]
WO2014EP67930
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2016026538
Date:25.02.2016
Language:EN
[2016/08]
Type: A1 Application with search report 
No.:EP3183788
Date:28.06.2017
Language:EN
The application published by WIPO in one of the EPO official languages on 25.02.2016 takes the place of the publication of the European patent application.
[2017/26]
Type: B1 Patent specification 
No.:EP3183788
Date:08.04.2020
Language:EN
[2020/15]
Search report(s)International search report - published on:EP25.02.2016
ClassificationIPC:H02G15/068
[2017/26]
CPC:
H02G15/068 (EP,KR,US); H01B19/04 (EP,KR,US); H01B7/18 (US);
H01B7/28 (EP,KR,US); H02G1/14 (EP,KR,US); H02G1/145 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/26]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:VORRICHTUNG ZUR STEUERUNG EINES ELEKTRISCHEN FELDES FÜR HOCHLEISTUNGSKABEL UND VERFAHREN ZUR HERSTELLUNG DAVON[2017/26]
English:ELECTRIC FIELD CONTROL DEVICE FOR HIGH POWER CABLE AND METHOD FOR MANUFACTURING THEREOF[2017/26]
French:DISPOSITIF DE COMMANDE DE CHAMP ÉLECTRIQUE POUR CÂBLE À HAUTE PUISSANCE ET SON PROCÉDÉ DE FABRICATION[2017/26]
Entry into regional phase22.03.2017National basic fee paid 
22.03.2017Designation fee(s) paid 
22.03.2017Examination fee paid 
Examination procedure14.04.2016Request for preliminary examination filed
International Preliminary Examining Authority: EP
11.11.2016Date on which the examining division has become responsible
22.03.2017Examination requested  [2017/26]
26.04.2018Despatch of a communication from the examining division (Time limit: M04)
24.08.2018Reply to a communication from the examining division
19.09.2018Despatch of a communication from the examining division (Time limit: M04)
09.01.2019Reply to a communication from the examining division
23.01.2019Despatch of a communication from the examining division (Time limit: M04)
22.05.2019Reply to a communication from the examining division
08.10.2019Communication of intention to grant the patent
29.01.2020Fee for grant paid
29.01.2020Fee for publishing/printing paid
29.01.2020Receipt of the translation of the claim(s)
Opposition(s)12.01.2021No opposition filed within time limit [2021/11]
Fees paidRenewal fee
22.03.2017Renewal fee patent year 03
22.08.2017Renewal fee patent year 04
14.08.2018Renewal fee patent year 05
14.08.2019Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU22.08.2014
AL08.04.2020
AT08.04.2020
CY08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
MK08.04.2020
MT08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
TR08.04.2020
BG08.07.2020
IS08.08.2020
PT17.08.2020
GB22.08.2020
IE22.08.2020
LU22.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
[2022/32]
Former [2022/27]HU22.08.2014
AL08.04.2020
AT08.04.2020
CY08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
MT08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
TR08.04.2020
BG08.07.2020
IS08.08.2020
PT17.08.2020
GB22.08.2020
IE22.08.2020
LU22.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
Former [2021/38]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
IS08.08.2020
PT17.08.2020
GB22.08.2020
IE22.08.2020
LU22.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
Former [2021/37]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
IS08.08.2020
PT17.08.2020
IE22.08.2020
LU22.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
Former [2021/36]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
IS08.08.2020
PT17.08.2020
LU22.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
Former [2021/24]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
IS08.08.2020
PT17.08.2020
LU22.08.2020
CH31.08.2020
LI31.08.2020
Former [2021/20]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
IS08.08.2020
PT17.08.2020
LU22.08.2020
CH31.08.2020
LI31.08.2020
Former [2021/18]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/10]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/09]AL08.04.2020
AT08.04.2020
CZ08.04.2020
DK08.04.2020
EE08.04.2020
ES08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SM08.04.2020
BG08.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/08]AL08.04.2020
DK08.04.2020
ES08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SM08.04.2020
BG08.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/04]AL08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
RS08.04.2020
SE08.04.2020
BG08.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/01]HR08.04.2020
LT08.04.2020
LV08.04.2020
RS08.04.2020
SE08.04.2020
BG08.07.2020
IS08.08.2020
PT17.08.2020
Former [2020/51]HR08.04.2020
LT08.04.2020
LV08.04.2020
RS08.04.2020
SE08.04.2020
IS08.08.2020
PT17.08.2020
Former [2020/50]HR08.04.2020
LT08.04.2020
LV08.04.2020
SE08.04.2020
IS08.08.2020
PT17.08.2020
Former [2020/49]LT08.04.2020
SE08.04.2020
IS08.08.2020
PT17.08.2020
Former [2020/47]LT08.04.2020
IS08.08.2020
Former [2020/46]IS08.08.2020
Cited inInternational search[XA]DD135264  (NIEMANN DIETER, et al) [X] 1-10 * the whole document * [A] 13;
 [X]DE1950325  (SIEMENS AG) [X] 1-3,5-9,11 * the whole document *;
 [A]EP0491447  (SIEMENS AG [DE]) [A] 1 * abstract *
ExaminationEP2639264
 WO2013004748
 EP2752448
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.