EP3038992 - NOVEL FIBERS, METHODS FOR THEIR PREPARATION AND USE IN THE MANUFACTURE OF REINFORCED ELEMENTS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.09.2020 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 27.09.2019 | ||
Former | Grant of patent is intended Status updated on 03.06.2019 | ||
Former | Examination is in progress Status updated on 12.04.2019 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Construction Research & Technology GmbH Dr.-Albert-Frank-Str. 32 83308 Trostberg / DE | [2016/27] | Inventor(s) | 01 /
KIERAT, Radoslaw Hauptstraße 1 83352 Altenmarkt / DE | 02 /
FEICHTENSCHLAGER, Bernhard Kolpingstraße 11 83278 Traunstein / DE | 03 /
HESSE, Christoph Erich-Zmarsly-Platz 3 85560 Ebersberg / DE | 04 /
HIRSEMANN, Dunja Lane 168 ShunChang Rd. Shanghai 200020 / CN | [2016/27] | Representative(s) | BASF IP Association BASF SE G-FLP-C006 67056 Ludwigshafen / DE | [2019/44] |
Former [2016/27] | BASF IP Association BASF SE ZRX-C6 67056 Ludwigshafen / DE | Application number, filing date | 14758314.0 | 21.08.2014 | [2016/27] | WO2014EP67807 | Priority number, date | EP20130181760 | 27.08.2013 Original published format: EP 13181760 | [2016/27] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015028380 | Date: | 05.03.2015 | Language: | EN | [2015/09] | Type: | A1 Application with search report | No.: | EP3038992 | Date: | 06.07.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 05.03.2015 takes the place of the publication of the European patent application. | [2016/27] | Type: | B1 Patent specification | No.: | EP3038992 | Date: | 30.10.2019 | Language: | EN | [2019/44] | Search report(s) | International search report - published on: | EP | 05.03.2015 | Classification | IPC: | C04B22/00, C04B20/00, E04C5/07, D06M11/00, D06M11/44, D06M11/45, D06M11/56, D06M11/79, D06M13/513, D06M15/233, D06M15/263, C04B28/04, D06M15/27, D06M15/347, D06M23/08, C04B20/10, // D06M101/06, D06M101/24 | [2019/25] | CPC: |
C04B20/0048 (EP,US);
C04B20/023 (EP,US);
C04B20/1055 (EP,US);
C04B20/1074 (EP,US);
C04B22/0086 (EP,US);
C04B22/00863 (EP,US);
C04B22/00867 (EP,US);
C04B28/04 (US);
D06M11/00 (EP,US);
D06M11/44 (EP,US);
D06M11/45 (EP,US);
D06M11/56 (EP,US);
D06M11/79 (EP,US);
D06M13/513 (EP,US);
D06M15/233 (EP,US);
D06M15/263 (EP,US);
D06M15/27 (EP,US);
D06M15/347 (EP,US);
D06M23/08 (EP,US);
E04C5/073 (EP,US);
D06M2101/06 (EP,US);
| C-Set: |
C04B20/023, C04B14/42, C04B16/0633, C04B16/0641, C04B18/24 (EP,US);
C04B20/023, C04B14/42, C04B16/06, C04B18/24 (US,EP);
C04B20/1055, C04B14/42, C04B16/0633, C04B16/0641, C04B18/24 (US,EP);
C04B20/1074, C04B14/42, C04B20/1029, C04B20/1051 (EP,US); |
Former IPC [2016/27] | C04B22/00, C04B20/00, C04B20/02, C04B20/10, C04B41/00, E04C5/07 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/27] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | NEUARTIGE FASERN, VERFAHREN ZU IHRER HERSTELLUNG UND VERWENDUNG ZUR HERSTELLUNG VON VERSTÄRKUNGSELEMENTEN | [2019/25] | English: | NOVEL FIBERS, METHODS FOR THEIR PREPARATION AND USE IN THE MANUFACTURE OF REINFORCED ELEMENTS | [2016/27] | French: | NOUVELLES FIBRES, LEURS PROCÉDÉS DE PRÉPARATION ET LEUR UTILISATION DANS LA FABRICATION D'ÉLÉMENTS RENFORCÉS | [2019/25] |
Former [2016/27] | NEUARTIGE FASERN, VERFAHREN ZU DEREN HERSTELLUNG UND VERWENDUNG BEI DER HERSTELLUNG VON VERSTÄRKUNGSELEMENTEN | ||
Former [2016/27] | NOUVELLES FIBRES, LEURS PROCÉDÉS DE PRÉPARATION ET D'UTILISATION DANS LA FABRICATION D'ÉLÉMENTS RENFORCÉS | Entry into regional phase | 29.03.2016 | National basic fee paid | 29.03.2016 | Designation fee(s) paid | 29.03.2016 | Examination fee paid | Examination procedure | 29.03.2016 | Examination requested [2016/27] | 13.10.2016 | Amendment by applicant (claims and/or description) | 16.04.2019 | Despatch of a communication from the examining division (Time limit: M04) | 30.04.2019 | Reply to a communication from the examining division | 04.06.2019 | Communication of intention to grant the patent | 20.09.2019 | Fee for grant paid | 20.09.2019 | Fee for publishing/printing paid | 20.09.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 31.07.2020 | No opposition filed within time limit [2020/41] | Fees paid | Renewal fee | 31.08.2016 | Renewal fee patent year 03 | 31.08.2017 | Renewal fee patent year 04 | 31.08.2018 | Renewal fee patent year 05 | 02.09.2019 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.08.2014 | AL | 30.10.2019 | AT | 30.10.2019 | CY | 30.10.2019 | CZ | 30.10.2019 | DK | 30.10.2019 | EE | 30.10.2019 | FI | 30.10.2019 | HR | 30.10.2019 | LT | 30.10.2019 | LV | 30.10.2019 | MC | 30.10.2019 | MK | 30.10.2019 | MT | 30.10.2019 | NL | 30.10.2019 | PL | 30.10.2019 | RO | 30.10.2019 | RS | 30.10.2019 | SE | 30.10.2019 | SI | 30.10.2019 | SK | 30.10.2019 | SM | 30.10.2019 | TR | 30.10.2019 | BG | 30.01.2020 | NO | 30.01.2020 | GR | 31.01.2020 | IS | 29.02.2020 | PT | 02.03.2020 | [2022/32] |
Former [2022/27] | HU | 21.08.2014 | |
AL | 30.10.2019 | ||
AT | 30.10.2019 | ||
CY | 30.10.2019 | ||
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
MC | 30.10.2019 | ||
MT | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SI | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
TR | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2021/18] | AL | 30.10.2019 | |
AT | 30.10.2019 | ||
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
MC | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SI | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/51] | AL | 30.10.2019 | |
AT | 30.10.2019 | ||
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SI | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/37] | AL | 30.10.2019 | |
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/36] | AL | 30.10.2019 | |
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/35] | AL | 30.10.2019 | |
CZ | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/32] | AL | 30.10.2019 | |
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/25] | FI | 30.10.2019 | |
HR | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/24] | FI | 30.10.2019 | |
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
SE | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/23] | FI | 30.10.2019 | |
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
SE | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
PT | 02.03.2020 | ||
Former [2020/22] | FI | 30.10.2019 | |
LT | 30.10.2019 | ||
SE | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
PT | 02.03.2020 | ||
Former [2020/21] | NO | 30.01.2020 | Cited in | International search | [X]DE2945875 (WUESTEFELD DR BERND [DE]) [X] 1,3,6-8,11-13,16,18-21 * page 2, paragraph first - page 5, paragraph last; examples 1-5; claims 1-4 *; | [X]DE3602310 (ELKEM AS [NO]) [X] 1,5-8,11-21 * page 6, line 6 - page 15, line 16 * * page 16 - page 25; examples 1-2 * * claims 1-13; tables 1-3 *; | [XI]WO9739054 (KHASHOGGI E IND [US]) [X] 1,4,6-8,11-21 * page 1, lines 6-10 * * page 2, line 3 - page 3, line 32 * * page 4, line 20 - page 5, line 3 * * page 5, line 6 - page 12, line 17; figure 1; examples 1-4; claims 1-33 * [I] 2,3,5,9,10; | [X]WO2008052753 (MICHAEL C FAAS GMBH DR [DE], et al) [X] 1,6-8,11-21 * page 13, line 16 - page 24, line 15; claims 1-19 *; | [AD]WO2010026155 (CONSTR RES & TECH GMBH [DE], et al) [AD] 1-21* the whole document *; | [X] - SUN M ET AL, "Influence of corrosion on the interface between zinc phosphate steel fiber and cement", MATERIALS AND CORROSION - WERKSTOFFE UND KORROSION, WILEY-VCH, WEINHEIM, DE, vol. 63, no. 1, doi:10.1002/MACO.200905580, ISSN 0947-5117, (20120101), pages 67 - 72, (20100816), XP001572290 [X] 1,6-8,11-14,16,18-21 * chapter 1-3;; figure 4 * DOI: http://dx.doi.org/10.1002/maco.200905580 | by applicant | DE3602310 | EP0225036 | US5158996 | WO9739054 | US5705233 | US5731080 | US2008108732 | WO2010026155 | US2012146254 | EP2557185 | - SWAMY RN ET AL., MATERIAUX ET CONSTRCTIONS, (1975), vol. 8, no. 45, pages 235 - 254 | - KIM, YY ET AL., ACI STRUCTURAL JOURNAL, (2004), vol. 101, no. 6, pages 792 - 801 | - LI V.C. ET AL., ADVANCED CEMENT BASED MATERIALS, (1997), vol. 6, pages 1 - 20 | - "Developments in fiber-reinforcements for concrete", NAAMAN A.E.; MCGARRY F.J.; SULTAN, J.N., Technical Report, MIT, (197205), page 67 |