blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2972660

EP2972660 - CONTROLLING POWER SUPPLY UNIT POWER CONSUMPTION DURING IDLE STATE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  03.07.2020
Database last updated on 05.07.2024
FormerThe patent has been granted
Status updated on  21.06.2019
FormerGrant of patent is intended
Status updated on  18.02.2019
FormerExamination is in progress
Status updated on  20.10.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Intel Corporation
2200 Mission College Boulevard
Santa Clara, CA 95054 / US
[2019/30]
Former [2016/03]For all designated states
Intel Corporation
2200 Mission College Boulevard
Santa Clara, CA 95054 / US
Inventor(s)01 / ROTEM, Efraim
8 Vizo st
34400 Haifa / IL
02 / GOULD, Benjamin J.
Yotam 22
34672 Haifa / IL
03 / HERMERDING II, James G.
1023 NW 112th Street
Vancouver, Washington 98685 / US
04 / RODRIGUEZ, Jorge P.
2878 SW Fairview Boulevard
Portland, Oregon 97205 / US
05 / NAVEH, Alon
17 Alexander Avenue
Sausalito, 94965 California / US
06 / ROSENZWEIG, Nir
Haemek 128 PO 96
23800 Givat Ella / IL
07 / DEGALAHAL, Vijay S R
C173, Sobha Magnolia
Bannergatta Road
Bangalore, DL 560029 / IN
 [2019/14]
Former [2016/03]01 / ROTEM, Efraim
8 Vizo st
34400 Haifa / IL
02 / GOULD, Benjamin J.
Yotam 22
34672 Haifa / IL
03 / HERMERDING II, James G.
1023 NW 112th Street
Vancouver, Washington 98685 / US
04 / RODRIGUEZ, Jorge P.
2566 NW Marshall St.
Portland, Oregon 97210 / US
05 / NAVEH, Alon
97 Usishkin St
47204 Ramat Hasharon / IL
06 / ROSENZWEIG, Nir
Haemek 128 PO 96
23800 Givat Ella / IL
07 / DEGALAHAL, Vijay S R
B151
Sobha Magnolia
Bannergatta Road
Bangalore 560029 / IN
Representative(s)HGF
HGF Limited
1 City Walk
Leeds LS11 9DX / GB
[N/P]
Former [2019/30]HGF Limited
Fountain Precinct
Balm Green
Sheffield S1 2JA / GB
Former [2016/03]Jennings, Vincent Louis
HGF Limited
Fountain Precinct
Balm Green
Sheffield S1 2JA / GB
Application number, filing date14765524.514.03.2014
[2016/03]
WO2014US27730
Priority number, dateIN2013CHE112315.03.2013         Original published format: IN 1123CH2013
[2017/16]
Former [2016/03]IN2013CHE112315.03.2013
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2014143674
Date:18.09.2014
Language:EN
[2014/38]
Type: A1 Application with search report 
No.:EP2972660
Date:20.01.2016
Language:EN
The application published by WIPO in one of the EPO official languages on 18.09.2014 takes the place of the publication of the European patent application.
[2016/03]
Type: B1 Patent specification 
No.:EP2972660
Date:24.07.2019
Language:EN
[2019/30]
Search report(s)International search report - published on:KR18.09.2014
(Supplementary) European search report - dispatched on:EP07.10.2016
ClassificationIPC:G06F1/32
[2016/03]
CPC:
G06F1/325 (EP,US); G06F1/3206 (EP,US); Y02D30/50 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/03]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:STEUERUNG DES STROMVERBRAUCHS EINER STROMVERSORGUNGSEINHEIT IM RUHEZUSTAND[2016/03]
English:CONTROLLING POWER SUPPLY UNIT POWER CONSUMPTION DURING IDLE STATE[2016/03]
French:CONTRÔLE DE LA CONSOMMATION ÉLECTRIQUE D'UNE UNITÉ D'ALIMENTATION ÉLECTRIQUE PENDANT UN ÉTAT DE VEILLE[2016/03]
Entry into regional phase13.08.2015National basic fee paid 
13.08.2015Search fee paid 
13.08.2015Designation fee(s) paid 
13.08.2015Examination fee paid 
Examination procedure13.08.2015Examination requested  [2016/03]
03.05.2017Amendment by applicant (claims and/or description)
19.10.2017Despatch of a communication from the examining division (Time limit: M04)
16.02.2018Reply to a communication from the examining division
14.01.2019Cancellation of oral proceeding that was planned for 17.01.2019
17.01.2019Date of oral proceedings (cancelled)
19.02.2019Communication of intention to grant the patent
07.06.2019Fee for grant paid
07.06.2019Fee for publishing/printing paid
07.06.2019Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  19.10.2017
Opposition(s)03.06.2020No opposition filed within time limit [2020/32]
Fees paidRenewal fee
10.03.2016Renewal fee patent year 03
10.03.2017Renewal fee patent year 04
13.03.2018Renewal fee patent year 05
13.03.2019Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU14.03.2014
AL24.07.2019
AT24.07.2019
CY24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
MK24.07.2019
MT24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
IE14.03.2020
LU14.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
[2022/32]
Former [2022/28]HU14.03.2014
AL24.07.2019
AT24.07.2019
CY24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
MT24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
IE14.03.2020
LU14.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
Former [2021/12]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
IE14.03.2020
LU14.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
Former [2021/07]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
IE14.03.2020
LU14.03.2020
CH31.03.2020
LI31.03.2020
Former [2021/04]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
LU14.03.2020
Former [2020/50]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/37]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/36]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/27]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
PT25.11.2019
IS24.02.2020
Former [2020/25]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SK24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
PT25.11.2019
IS24.02.2020
Former [2020/24]AL24.07.2019
AT24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
PT25.11.2019
IS24.02.2020
Former [2020/23]AL24.07.2019
AT24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/22]AL24.07.2019
AT24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
RS24.07.2019
SE24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/17]AL24.07.2019
AT24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
RS24.07.2019
SE24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/15]AL24.07.2019
AT24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
RS24.07.2019
SE24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/12]AT24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
RS24.07.2019
SE24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/11]AT24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
RS24.07.2019
SE24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
PT25.11.2019
Former [2020/10]AT24.07.2019
FI24.07.2019
LT24.07.2019
SE24.07.2019
BG24.10.2019
NO24.10.2019
PT25.11.2019
Former [2020/09]FI24.07.2019
LT24.07.2019
NO24.10.2019
Former [2020/08]LT24.07.2019
NO24.10.2019
Documents cited:Search[Y]US2006101295  (PARK JEONG-GYU [KR]) [Y] 1-15 * paragraphs [0038] , [0041] , [0062]; figure 2 *;
 [A]US2008065920  (SUGINAKA YUKARI [JP], et al) [A] 1-15* figure 1 *;
 [Y]US2008104436  (SAWYERS THOMAS P [US], et al) [Y] 1-15 * paragraph [0010] *
International search[Y]US2011078475  (JUENEMANN DALE [US], et al);
 [A]US2011246798  (BILGIN SELIM [US], et al);
 [Y]US2012079304  (WEISSMANN ELIEZER [IL], et al);
 [Y]US2013047012  (JUNG HWISUNG [US]);
 [A]US2013051304  (MATTHEWS BRAD [US], et al)
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.