blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3046863

EP3046863 - METHOD FOR OPERATING A LIFT CONTROL DEVICE [Right-click to bookmark this link]
Former [2016/30]METHOD FOR OPERATING AN ELEVATOR CONTROL DEVICE
[2021/47]
StatusNo opposition filed within time limit
Status updated on  14.04.2023
Database last updated on 26.07.2024
FormerThe patent has been granted
Status updated on  06.05.2022
FormerGrant of patent is intended
Status updated on  10.01.2022
FormerExamination is in progress
Status updated on  09.04.2021
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
INVENTIO AG
Seestrasse 55
6052 Hergiswil / CH
[2022/37]
Former [2022/23]For all designated states
Inventio AG
Seestrasse 55
6052 Hergiswil / CH
Former [2016/30]For all designated states
Inventio AG
Seestrasse 55
6052 Hergiswil / CH
Inventor(s)01 / COLOMBANO, Claudio
Allmendstrasse 5A
CH-6373 Ennetbürgen NW / CH
02 / BÜNTER, Adrian
Haltenrain 14
CH-6074 Giswil OW / CH
03 / PAICE, Andrew
Zelgweg 38
CH-5405Baden-Dättwil / CH
04 / LÜTHI, Philipp
Aeschenthürlistrasse 26
CH-6030 Ebikon / CH
05 / RÄBER, Thomas
Rosengartenhalde 7
CH-6006 Luzern / CH
 [2016/32]
Former [2016/30]01 / COLOMBANO, Claudio
Allmendstrasse 5A
CH-6373 Ennetbürgen NW / CH
02 / BÜNTER, Adrian
Haltenrain 14
CH-6074 Giswil OW / CH
03 / PAICE, Andrew
Zelgweg 38
CH-5405Baden-Dättwil / CH
04 / LÜTHI, Philipp
Oberdierikonerstrasse 17
CH-6030 Ebikon / CH
05 / RÄBER, Thomas
Rosengartenhalde 7
CH-6006 Luzern / CH
Representative(s)Inventio AG
Seestrasse 55
6052 Hergiswil / CH
[2022/23]
Application number, filing date14765955.115.09.2014
[2016/30]
WO2014EP69595
Priority number, dateEP2013018495918.09.2013         Original published format: EP 13184959
[2016/30]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2015039984
Date:26.03.2015
Language:DE
[2015/12]
Type: A1 Application with search report 
No.:EP3046863
Date:27.07.2016
Language:DE
The application published by WIPO in one of the EPO official languages on 26.03.2015 takes the place of the publication of the European patent application.
[2016/30]
Type: B1 Patent specification 
No.:EP3046863
Date:08.06.2022
Language:DE
[2022/23]
Search report(s)International search report - published on:EP26.03.2015
ClassificationIPC:B66B5/00
[2016/30]
CPC:
B66B5/0087 (EP,US); B66B1/3423 (US); B66B5/00 (EP,US);
B66B2201/406 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/30]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:VERFAHREN ZUM BETRIEB EINER AUFZUGSSTEUERUNGSEINRICHTUNG[2016/30]
English:METHOD FOR OPERATING A LIFT CONTROL DEVICE[2021/47]
French:PROCÉDÉ DESTINÉ AU FONCTIONNEMENT D'UN DISPOSITIF DE COMMANDE D'ASCENSEUR[2021/47]
Former [2016/30]METHOD FOR OPERATING AN ELEVATOR CONTROL DEVICE
Former [2016/30]PROCÉDÉ PERMETTANT DE FAIRE FONCTIONNER UN DISPOSITIF DE COMMANDE D'UN ASCENSEUR
Entry into regional phase03.03.2016National basic fee paid 
03.03.2016Designation fee(s) paid 
03.03.2016Examination fee paid 
Examination procedure03.03.2016Examination requested  [2016/30]
31.08.2016Amendment by applicant (claims and/or description)
13.04.2021Despatch of a communication from the examining division (Time limit: M04)
30.07.2021Reply to a communication from the examining division
11.01.2022Communication of intention to grant the patent
03.05.2022Fee for grant paid
03.05.2022Fee for publishing/printing paid
03.05.2022Receipt of the translation of the claim(s)
Opposition(s)10.03.2023No opposition filed within time limit [2023/20]
Fees paidRenewal fee
30.09.2016Renewal fee patent year 03
26.09.2017Renewal fee patent year 04
25.09.2018Renewal fee patent year 05
24.09.2019Renewal fee patent year 06
25.09.2020Renewal fee patent year 07
27.09.2021Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU15.09.2014
AL08.06.2022
CY08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
IT08.06.2022
LT08.06.2022
LV08.06.2022
MC08.06.2022
MK08.06.2022
NL08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
TR08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
AT15.09.2022
IE15.09.2022
LU15.09.2022
BE30.09.2022
IS08.10.2022
PT10.10.2022
[2024/29]
Former [2024/27]HU15.09.2014
AL08.06.2022
CY08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
IT08.06.2022
LT08.06.2022
LV08.06.2022
MC08.06.2022
MK08.06.2022
NL08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
AT15.09.2022
IE15.09.2022
LU15.09.2022
BE30.09.2022
IS08.10.2022
PT10.10.2022
Former [2024/21]HU15.09.2014
AL08.06.2022
CY08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
IT08.06.2022
LT08.06.2022
LV08.06.2022
MC08.06.2022
NL08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
AT15.09.2022
IE15.09.2022
LU15.09.2022
BE30.09.2022
IS08.10.2022
PT10.10.2022
Former [2024/18]HU15.09.2014
AL08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
IT08.06.2022
LT08.06.2022
LV08.06.2022
MC08.06.2022
NL08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
AT15.09.2022
IE15.09.2022
LU15.09.2022
BE30.09.2022
IS08.10.2022
PT10.10.2022
Former [2024/11]AL08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
IT08.06.2022
LT08.06.2022
LV08.06.2022
MC08.06.2022
NL08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
AT15.09.2022
IE15.09.2022
LU15.09.2022
BE30.09.2022
IS08.10.2022
PT10.10.2022
Former [2024/09]AL08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
MC08.06.2022
NL08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
AT15.09.2022
IE15.09.2022
LU15.09.2022
BE30.09.2022
IS08.10.2022
PT10.10.2022
Former [2023/42]AL08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
MC08.06.2022
NL08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IE15.09.2022
LU15.09.2022
BE30.09.2022
IS08.10.2022
PT10.10.2022
Former [2023/33]AL08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
MC08.06.2022
NL08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IE15.09.2022
LU15.09.2022
IS08.10.2022
PT10.10.2022
Former [2023/30]AL08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
MC08.06.2022
NL08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
LU15.09.2022
IS08.10.2022
PT10.10.2022
Former [2023/25]AL08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
MC08.06.2022
NL08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
Former [2023/22]AL08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
MC08.06.2022
NL08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
Former [2023/21]AL08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
NL08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
Former [2023/17]AL08.06.2022
CZ08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
NL08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
Former [2023/12]CZ08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
NL08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
Former [2023/11]CZ08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
NL08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
PT10.10.2022
Former [2023/09]CZ08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
NL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
PT10.10.2022
Former [2023/02]ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
NL08.06.2022
RS08.06.2022
SE08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
Former [2022/50]ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
RS08.06.2022
SE08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
Former [2022/49]ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
SE08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
Former [2022/47]ES08.06.2022
FI08.06.2022
LT08.06.2022
SE08.06.2022
NO08.09.2022
Cited inInternational search[Y]US2003080851  (GERSTENKORN BERNHARD [CH]) [Y] 6 * abstract * * paragraph [0027] *;
 [XYI]JP2004099301  (MITSUBISHI ELEC BUILDING TECHN) [X] 1,3,4,7-12 * abstract * * paragraphs [0011] - [0019] * [Y] 5,6 [I] 2;
 [XAY]JP2010228907  (MITSUBISHI ELEC BUILDING TECHN) [X] 9-12 * abstract * * paragraph [0023] * [A] 1-4,6-8 [Y] 5;
 [A]US2011247901  (WILKE MICHAEL [DE], et al) [A] 1-12 * abstract * * paragraphs [0015] - [0021] *;
 [A]WO2012062957  (KONE CORP [FI], et al) [A] 1-12 * abstract ** page 9, line 17 - page 12, line 4 *;
 [XP]WO2014048826  (INVENTIO AG [CH]) [XP] 1,4,7-12 * abstract * * page 13, line 1 - page 15, line 8 * * page 16, line 6 - page 17, line 20 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.