blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3044258

EP3044258 - PEROXIDE-CROSSLINKABLE COMPOSITIONS AND PROCESSES FOR THEIR MANUFACTURE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  13.07.2018
Database last updated on 05.10.2024
FormerThe patent has been granted
Status updated on  04.08.2017
FormerGrant of patent is intended
Status updated on  15.03.2017
Most recent event   Tooltip17.07.2020Lapse of the patent in a contracting state
New state(s): AL
published on 19.08.2020  [2020/34]
Applicant(s)For all designated states
Dow Global Technologies LLC
2040 Dow Center
Midland, MI 48674 / US
[2016/29]
Inventor(s)01 / TALREJA, Manish
400 Arcola Rd
RC-3178
Collegeville, PA 19426 / US
02 / COGEN, Jeffrey, M.
6 Braintree Ct.
Flemington, NJ 08822 / US
03 / GROOT-ENZERNIK, Gerrit
Schnetzerenbach 13
CH-8841 Gross / CH
04 / PERSON, Timothy, J.
1521 Finley Cir.
Pottstown, PA 19464 / US
05 / DUNCHUS, Neil, W.
6 Dogwood Trail
Kinnelon, NJ 07405 / US
06 / BUCKLER, Gary, W.
110 Bloomingdale Cir.
Victoria, TX 77904 / US
07 / GOETHEL, Gabriele
Roentgenstr. 7
06217 Merseburg / DE
08 / SENGUPTA, Saurav, S.
1776 Building
C21
Michigan Operations The Dow Chemical Company
Midland, MI 48640 / US
09 / ADAMCAZYK, Antoni
187 Dunellen Ave.
Piscataway, NJ 08854 / US
 [2017/36]
Former [2016/32]01 / TALREJA, Manish
400 Arcola Rd
RC-3178
Collegeville, PA 19426 / US
02 / COGEN, Jeffrey, M.
6 Braintree Ct.
Flemington, NJ 08822 / US
03 / GROOT-ENZERNIK, Gerrit
Schnetzerenbach 13
CH-8841 Gross / CH
04 / PERSON, Timothy, J.
1521 Finley Cir.
Pottstown, PA 19464 / US
05 / DUNCHUS, Neil, W.
6 Dogwood Trl.
Kinnelon, NJ 07405 / US
06 / BUCKLER, Gary, W.
110 Bloomingdale Cir.
Victoria, TX 77904 / US
07 / GOETHEL, Gabriele
Roentgenstr. 7
06217 Merseburg / DE
08 / SENGUPTA, Saurav, S.
1776 Building
C21
Michigan Operations The Dow Chemical Company
Midland, MI 48640 / US
09 / ADAMCAZYK, Antoni
187 Dunellen Ave.
Piscataway, NJ 08854 / US
Former [2016/29]01 / TALREJA, Manish
1141 Snyder Rd. k 9
Lansdale, PA 19446 / US
02 / COGEN, Jeffrey, M.
6 Braintree Ct.
Flemington, NJ 08822 / US
03 / GROOT-ENZERNIK, Gerrit
Schnetzerenbach 13
CH-8841 Gross / CH
04 / PERSON, Timothy, J.
1521 Finley Cir.
Pottstown, PA 19464 / US
05 / DUNCHUS, Neil, W.
6 Dogwood Trl.
Kinnelon, NJ 07405 / US
06 / BUCKLER, Gary, W.
110 Bloomingdale Cir.
Victoria, TX 77904 / US
07 / GOETHEL, Gabriele
Roentgenstr. 7
06217 Merseburg / DE
08 / SENGUPTA, Saurav, S.
119 Lincoln Rd.
Collegeville, PA 19426 / US
09 / ADAMCAZYK, Antoni
187 Dunellen Ave.
Piscataway, NJ 08854 / US
Representative(s)Boult Wade Tennant LLP
Salisbury Square House
8 Salisbury Square
London EC4Y 8AP / GB
[N/P]
Former [2016/29]Boult Wade Tennant
Verulam Gardens
70 Gray's Inn Road
London WC1X 8BT / GB
Application number, filing date14767259.608.09.2014
[2016/29]
WO2014US54526
Priority number, dateUS201361877405P13.09.2013         Original published format: US 201361877405 P
[2016/29]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015038467
Date:19.03.2015
Language:EN
[2015/11]
Type: A1 Application with search report 
No.:EP3044258
Date:20.07.2016
Language:EN
The application published by WIPO in one of the EPO official languages on 19.03.2015 takes the place of the publication of the European patent application.
[2016/29]
Type: B1 Patent specification 
No.:EP3044258
Date:06.09.2017
Language:EN
[2017/36]
Search report(s)International search report - published on:EP19.03.2015
ClassificationIPC:C08K5/00, C08K5/3492, H01B3/30, H01B13/14
[2016/29]
CPC:
C08K5/372 (EP,CN,US); C08K5/005 (EP,CN,US); C08K5/14 (EP,CN,US);
C08K5/3435 (US); C08K5/34924 (EP,CN,US); H01B13/148 (EP,CN,US);
H01B3/308 (EP,CN,US); C08K5/34 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/29]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:PEROXIDVERNETZBARE ZUSAMMENSETZUNGEN UND VERFAHREN ZU DEREN HERSTELLUNG[2016/29]
English:PEROXIDE-CROSSLINKABLE COMPOSITIONS AND PROCESSES FOR THEIR MANUFACTURE[2016/29]
French:COMPOSITIONS RÉTICULABLES PAR PEROXYDE ET LEURS PROCÉDÉS DE PRODUCTION[2016/29]
Entry into regional phase01.03.2016National basic fee paid 
01.03.2016Designation fee(s) paid 
01.03.2016Examination fee paid 
Examination procedure09.04.2015Request for preliminary examination filed
International Preliminary Examining Authority: EP
01.03.2016Examination requested  [2016/29]
16.03.2017Communication of intention to grant the patent
26.07.2017Fee for grant paid
26.07.2017Fee for publishing/printing paid
26.07.2017Receipt of the translation of the claim(s)
Divisional application(s)EP17183592.9  / EP3257892
Opposition(s)07.06.2018No opposition filed within time limit [2018/33]
Fees paidRenewal fee
13.09.2016Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU08.09.2014
AL06.09.2017
AT06.09.2017
CY06.09.2017
CZ06.09.2017
DK06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
LT06.09.2017
LV06.09.2017
MC06.09.2017
MK06.09.2017
NL06.09.2017
PL06.09.2017
PT06.09.2017
RO06.09.2017
RS06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
TR06.09.2017
IE08.09.2017
LU08.09.2017
MT08.09.2017
BE30.09.2017
CH30.09.2017
LI30.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
[2020/34]
Former [2020/28]HU08.09.2014
AT06.09.2017
CY06.09.2017
CZ06.09.2017
DK06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
LT06.09.2017
LV06.09.2017
MC06.09.2017
MK06.09.2017
NL06.09.2017
PL06.09.2017
PT06.09.2017
RO06.09.2017
RS06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
TR06.09.2017
IE08.09.2017
LU08.09.2017
MT08.09.2017
BE30.09.2017
CH30.09.2017
LI30.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
Former [2020/16]HU08.09.2014
AT06.09.2017
CY06.09.2017
CZ06.09.2017
DK06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
LT06.09.2017
LV06.09.2017
MC06.09.2017
MK06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
RS06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
TR06.09.2017
IE08.09.2017
LU08.09.2017
MT08.09.2017
BE30.09.2017
CH30.09.2017
LI30.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
Former [2019/52]HU08.09.2014
AT06.09.2017
CY06.09.2017
CZ06.09.2017
DK06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
LT06.09.2017
LV06.09.2017
MC06.09.2017
MK06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
RS06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
IE08.09.2017
LU08.09.2017
MT08.09.2017
BE30.09.2017
CH30.09.2017
LI30.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
Former [2019/47]HU08.09.2014
AT06.09.2017
CY06.09.2017
CZ06.09.2017
DK06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
LT06.09.2017
LV06.09.2017
MC06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
RS06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
IE08.09.2017
LU08.09.2017
MT08.09.2017
BE30.09.2017
CH30.09.2017
LI30.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
Former [2019/31]HU08.09.2014
AT06.09.2017
CZ06.09.2017
DK06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
LT06.09.2017
LV06.09.2017
MC06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
RS06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
IE08.09.2017
LU08.09.2017
MT08.09.2017
BE30.09.2017
CH30.09.2017
LI30.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
Former [2018/43]AT06.09.2017
CZ06.09.2017
DK06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
LT06.09.2017
LV06.09.2017
MC06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
RS06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
IE08.09.2017
LU08.09.2017
MT08.09.2017
BE30.09.2017
CH30.09.2017
LI30.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
Former [2018/39]AT06.09.2017
CZ06.09.2017
DK06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
LT06.09.2017
LV06.09.2017
MC06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
RS06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
IE08.09.2017
LU08.09.2017
BE30.09.2017
CH30.09.2017
LI30.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
Former [2018/36]AT06.09.2017
CZ06.09.2017
DK06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
LT06.09.2017
LV06.09.2017
MC06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
RS06.09.2017
SK06.09.2017
SM06.09.2017
IE08.09.2017
LU08.09.2017
BE30.09.2017
CH30.09.2017
LI30.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
Former [2018/33]AT06.09.2017
CZ06.09.2017
DK06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
LT06.09.2017
LV06.09.2017
MC06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
RS06.09.2017
SK06.09.2017
SM06.09.2017
IE08.09.2017
LU08.09.2017
CH30.09.2017
LI30.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
Former [2018/24]AT06.09.2017
CZ06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
LT06.09.2017
LV06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
RS06.09.2017
SK06.09.2017
SM06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
Former [2018/23]AT06.09.2017
CZ06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
LT06.09.2017
LV06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
RS06.09.2017
SK06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
Former [2018/21]CZ06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
LT06.09.2017
LV06.09.2017
NL06.09.2017
RS06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
Former [2018/15]ES06.09.2017
FI06.09.2017
HR06.09.2017
LT06.09.2017
LV06.09.2017
NL06.09.2017
RS06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
Former [2018/12]ES06.09.2017
FI06.09.2017
HR06.09.2017
LT06.09.2017
LV06.09.2017
RS06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
Former [2018/11]ES06.09.2017
FI06.09.2017
HR06.09.2017
LT06.09.2017
RS06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
Former [2018/08]FI06.09.2017
LT06.09.2017
NO06.12.2017
Former [2018/07]LT06.09.2017
NO06.12.2017
Cited inInternational search[X]EP0870803  (PHILLIPS PETROLEUM CO [US]);
 [XY]EP1243614  (ATOFINA CHEM INC [US]);
 [Y]US2002169238  (CARONIA PAUL JOSEPH [US], et al);
 [X]US2013210945  (PICOT FABRICE [FR], et al)
by applicantUS3334081
 US4101445
 US4144202
 US4302565
 US4508842
 US4937299
 US5246783
 US5272236
 US5278272
 US5317036
 US5332793
 US5342907
 US5371145
 US5405901
 US5410003
 WO9921194
 US6187858
 US6187847
 US6496629
 US6656986
 US6714707
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.