blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2967164

EP2967164 - INTERLOCKING IMPACT PROTECTION SYSTEM FOR CONTACT SPORTS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  18.12.2020
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  10.01.2020
FormerGrant of patent is intended
Status updated on  16.09.2019
FormerRequest for examination was made
Status updated on  30.07.2019
FormerGrant of patent is intended
Status updated on  13.03.2019
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
NIKE Innovate C.V.
One Bowerman Drive
Beaverton, OR 97005-6453 / US
[2020/07]
Former [2016/03]For all designated states
NIKE Innovate C.V.
One Bowerman Drive
Beaverton, OR 97005-6453 / US
Inventor(s)01 / DEMAREST, Nathan
c/o Nike Inc.
One Bowerman Drive
Beaverton, Oregon 97005-6453 / US
 [2016/03]
Representative(s)Müller-Boré & Partner Patentanwälte PartG mbB
Friedenheimer Brücke 21
80639 München / DE
[2020/07]
Former [2016/03]Simpson, Kirsty Mairi
Withers & Rogers LLP
4 More London Riverside
London SE1 2AU / GB
Application number, filing date14769077.007.03.2014
[2016/03]
WO2014US21910
Priority number, dateUS20131383429915.03.2013         Original published format: US201313834299
[2016/03]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2014150027
Date:25.09.2014
Language:EN
[2014/39]
Type: A1 Application with search report 
No.:EP2967164
Date:20.01.2016
Language:EN
The application published by WIPO in one of the EPO official languages on 25.09.2014 takes the place of the publication of the European patent application.
[2016/03]
Type: B1 Patent specification 
No.:EP2967164
Date:12.02.2020
Language:EN
[2020/07]
Search report(s)International search report - published on:US25.09.2014
(Supplementary) European search report - dispatched on:EP21.09.2016
ClassificationIPC:A41D13/005, A63B71/12
[2016/42]
CPC:
A41D13/005 (EP,US); A63B71/1225 (EP,US); A63B2071/1241 (EP,US);
A63B2209/02 (EP,US); A63B2243/007 (EP,US)
Former IPC [2016/03]A41D13/015
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/03]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:INEINANDERGREIFENDES AUFPRALLSCHUTZSYSTEM FÜR KONTAKTSPORTARTEN[2016/03]
English:INTERLOCKING IMPACT PROTECTION SYSTEM FOR CONTACT SPORTS[2016/03]
French:SYSTÈME DE PROTECTION CONTRE UN IMPACT À VERROUILLAGE POUR SPORTS DE CONTACT[2016/03]
Entry into regional phase17.09.2015National basic fee paid 
17.09.2015Search fee paid 
17.09.2015Designation fee(s) paid 
17.09.2015Examination fee paid 
Examination procedure17.09.2015Examination requested  [2016/03]
10.03.2017Amendment by applicant (claims and/or description)
14.03.2019Communication of intention to grant the patent
22.07.2019Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
22.07.2019Fee for grant paid
22.07.2019Fee for publishing/printing paid
17.09.2019Communication of intention to grant the patent
27.12.2019Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  14.03.2019
Opposition(s)13.11.2020No opposition filed within time limit [2021/03]
Fees paidRenewal fee
10.03.2016Renewal fee patent year 03
10.03.2017Renewal fee patent year 04
13.03.2018Renewal fee patent year 05
13.03.2019Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU07.03.2014
AL12.02.2020
AT12.02.2020
CY12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
IT12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
MK12.02.2020
MT12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
SM12.02.2020
TR12.02.2020
IE07.03.2020
LU07.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
[2022/31]
Former [2022/30]HU07.03.2014
AL12.02.2020
AT12.02.2020
CY12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
IT12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
MT12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
SM12.02.2020
TR12.02.2020
IE07.03.2020
LU07.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2022/27]HU07.03.2014
AT12.02.2020
CY12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
IT12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
MT12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
SM12.02.2020
TR12.02.2020
IE07.03.2020
LU07.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2021/10]AT12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
IT12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
SM12.02.2020
IE07.03.2020
LU07.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2021/07]CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
NL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SK12.02.2020
SM12.02.2020
IE07.03.2020
LU07.03.2020
CH31.03.2020
LI31.03.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2021/04]CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
NL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SK12.02.2020
SM12.02.2020
LU07.03.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2020/52]CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
NL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SK12.02.2020
SM12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2020/50]CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
NL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SK12.02.2020
SM12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2020/49]CZ12.02.2020
DK12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
NL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SK12.02.2020
SM12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2020/48]DK12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
NL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SM12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2020/47]DK12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
NL12.02.2020
RS12.02.2020
SE12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
Former [2020/45]FI12.02.2020
HR12.02.2020
LV12.02.2020
NL12.02.2020
RS12.02.2020
SE12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
Former [2020/40]FI12.02.2020
HR12.02.2020
LV12.02.2020
RS12.02.2020
SE12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
Former [2020/39]FI12.02.2020
HR12.02.2020
LV12.02.2020
RS12.02.2020
SE12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
Former [2020/38]FI12.02.2020
HR12.02.2020
LV12.02.2020
RS12.02.2020
SE12.02.2020
NO12.05.2020
GR13.05.2020
Former [2020/37]FI12.02.2020
HR12.02.2020
LV12.02.2020
RS12.02.2020
SE12.02.2020
NO12.05.2020
Former [2020/35]FI12.02.2020
NO12.05.2020
Documents cited:Search[A]US2237892  (JACOB SQUIRE) [A] 1-15 * figure -; claim - *;
 [A]US2369531  (ROBERT CALTABIANO) [A] 1-15* figure -; claim - *;
 [A]US2012192340  (MINSON MATTHEW ALAN [US]) [A] 1-15 * figure -; claim - *
International search[Y]US2057942  (ALFRED FAY MARC AURELE);
 [X]US4479269  (BALLIET KARL E [US]);
 [Y]US6142848  (MADNER PETER [AU], et al);
 [Y]US6453973  (RUSSO RALPH [CA])
by applicantUS4479269
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.