| EP3036386 - SWIMMING POOL HAVING AN INTEGRATED COUNTER-CURRENT SWIMMING SYSTEM AND PROCESS [Right-click to bookmark this link] | |||
| Former [2016/26] | SWIMMING POOL HAVING AN INTEGRATED COUNTER-CURRENT SWIMMING SYSTEM | ||
| [2020/21] | Status | Patent revoked Status updated on 10.01.2025 Database last updated on 11.04.2026 | |
| Former | The patent has been granted Status updated on 18.09.2020 | ||
| Former | Grant of patent is intended Status updated on 11.05.2020 | ||
| Former | Examination is in progress Status updated on 08.02.2019 | ||
| Former | Request for examination was made Status updated on 18.12.2016 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Binder, Siegfried Bannensieker Str. 28 31787 Hameln / DE | [2016/26] | Inventor(s) | 01 /
see applicant ... | [2016/26] | Representative(s) | Szaunig, Bernd Anwaltskanzlei Söffge & Söffge . Berg Moltkestrasse 3 - 5 80803 München / DE | [2016/26] | Application number, filing date | 14771183.2 | 18.05.2014 | [2016/26] | WO2014DE00254 | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2015176694 | Date: | 26.11.2015 | Language: | DE | [2015/47] | Type: | A1 Application with search report | No.: | EP3036386 | Date: | 29.06.2016 | Language: | DE | The application published by WIPO in one of the EPO official languages on 26.11.2015 takes the place of the publication of the European patent application. | [2016/26] | Type: | B1 Patent specification | No.: | EP3036386 | Date: | 21.10.2020 | Language: | DE | [2020/43] | Search report(s) | International search report - published on: | EP | 26.11.2015 | Classification | IPC: | E04H4/00, A63B69/12 | [2016/26] | CPC: |
A63B69/125 (EP,CN,US);
E04H4/0006 (EP,CN,US);
E04H4/12 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/26] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SCHWIMMBECKEN MIT EINER INTEGRIERTEN GEGENSTROMSCHWIMMANLAGE UND VERFAHREN | [2020/21] | English: | SWIMMING POOL HAVING AN INTEGRATED COUNTER-CURRENT SWIMMING SYSTEM AND PROCESS | [2020/21] | French: | PISCINE COMPRENANT UNE INSTALLATION DE NAGE À CONTRE-COURANT INTÉGRÉE ET PROCÉDÉ | [2020/21] |
| Former [2016/26] | SCHWIMMBECKEN MIT EINER INTEGRIERTEN GEGENSTROMSCHWIMMANLAGE | ||
| Former [2016/26] | SWIMMING POOL HAVING AN INTEGRATED COUNTER-CURRENT SWIMMING SYSTEM | ||
| Former [2016/26] | PISCINE COMPRENANT UNE INSTALLATION DE NAGE À CONTRE-COURANT INTÉGRÉE | Entry into regional phase | 21.03.2016 | National basic fee paid | 21.03.2016 | Designation fee(s) paid | 21.03.2016 | Examination fee paid | Examination procedure | 21.03.2016 | Examination requested [2016/26] | 04.11.2016 | Amendment by applicant (claims and/or description) | 15.11.2016 | Loss of particular rights, legal effect: Claims | 19.12.2016 | Despatch of communication of loss of particular rights: Claims {1} | 12.02.2019 | Despatch of a communication from the examining division (Time limit: M04) | 17.06.2019 | Reply to a communication from the examining division | 24.10.2019 | Despatch of a communication from the examining division (Time limit: M04) | 24.12.2019 | Reply to a communication from the examining division | 12.05.2020 | Communication of intention to grant the patent | 20.06.2020 | Receipt of the translation of the claim(s) | 09.09.2020 | Fee for grant paid | 09.09.2020 | Fee for publishing/printing paid | Opposition(s) | Opponent(s) | 01
20.07.2021
22.07.2021
ADMISSIBLE Speck Pumpen Verkaufsgesellschaft GmbH Hauptstrasse 1-3 91233 Neunkirchen a. Sand / DE Opponent's representative Reitstötter Kinzebach Patentanwälte Sternwartstraße 4 81679 München / DE | 02
21.07.2021
23.07.2021
ADMISSIBLE Uwe JetStream GmbH Buchstrasse 82 73510 Schwäbisch Gmünd / DE Opponent's representative Cohausz Hannig Borkowski Wißgott Patentanwaltskanzlei GbR Grafenberger Allee 337a 40235 Düsseldorf / DE | 03
21.07.2021
23.07.2021
ADMISSIBLE Hugo Lahme GmbH Kahlenbecker Str. 2 58256 Ennepetal / DE Opponent's representative Brötz, Helmut Rieder & Partner mbB Patentanwälte - Rechtsanwalt Yale-Allee 26 42329 Wuppertal / DE | 04
21.07.2021
28.07.2021
ADMISSIBLE Société Industrielle Radio Électrique Et Mécanique "SIREM" Lieu-dit le Pilon Miribel 01700 Saint-Maurice-de-Beynost / FR Opponent's representative Lavoix 62, rue de Bonnel 69448 Lyon Cedex 03 / FR | [2025/05] |
| Former [2021/35] | |||
| Opponent(s) | 01
20.07.2021
22.07.2021
ADMISSIBLE Speck Pumpen Verkaufsgesellschaft GmbH Hauptstrasse 1-3 91233 Neunkirchen a. Sand / DE Opponent's representative Reitstötter Kinzebach Patentanwälte Sternwartstrasse 4 81679 München / DE | ||
| 02
21.07.2021
23.07.2021
ADMISSIBLE Uwe JetStream GmbH Buchstrasse 82 73510 Schwäbisch Gmünd / DE Opponent's representative Cohausz Hannig Borkowski Wißgott Patentanwaltskanzlei GbR Schumannstraße 97-99 40237 Düsseldorf / DE | |||
| 03
21.07.2021
23.07.2021
ADMISSIBLE Hugo Lahme GmbH Kahlenbecker Str. 2 58256 Ennepetal / DE Opponent's representative Brötz, Helmut Rieder & Partner mbB Patentanwälte - Rechtsanwalt Yale-Allee 26 42329 Wuppertal / DE | |||
| 04
21.07.2021
28.07.2021
ADMISSIBLE Société Industrielle Radio Électrique Et Mécanique "SIREM" Lieu-dit le Pilon Miribel 01700 Saint-Maurice-de-Beynost / FR Opponent's representative Lavoix 62, rue de Bonnel 69448 Lyon Cedex 03 / FR | |||
| Former [2021/34] | |||
| Opponent(s) | 01
20.07.2021
22.07.2021
ADMISSIBLE Speck Pumpen Verkaufsgesellschaft GmbH Hauptstrasse 1-3 91233 Neunkirchen a. Sand / DE Opponent's representative Reitstötter Kinzebach Patentanwälte Sternwartstrasse 4 81679 München / DE | ||
| 02
21.07.2021
Uwe JetStream GmbH Buchstrasse 82 73510 Schwäbisch Gmünd / DE Opponent's representative Cohausz Hannig Borkowski Wißgott Patentanwaltskanzlei GbR Schumannstraße 97-99 40237 Düsseldorf / DE | |||
| 03
21.07.2021
Hugo Lahme GmbH Kahlenbecker Str. 2 58256 Ennepetal / DE Opponent's representative Brötz, Helmut Rieder & Partner mbB Patentanwälte - Rechtsanwalt Yale-Allee 26 42329 Wuppertal / DE | 04.08.2021 | Invitation to proprietor to file observations on the notice of opposition | 14.02.2022 | Reply of patent proprietor to notice(s) of opposition | 15.07.2022 | Despatch of communication that the patent will be revoked | 11.12.2024 | Legal effect of revocation of patent [2025/07] | Appeal following opposition | 10.09.2022 | Appeal received No. T2112/22 | 10.09.2022 | Payment of appeal fee | 15.11.2022 | Statement of grounds filed | 11.12.2024 | Result of appeal procedure: appeal of the proprietor was rejected | 23.12.2024 | Despatch of the decision of the Board of Appeal | 11.12.2024 | Date of oral proceedings | Fees paid | Renewal fee | 21.03.2016 | Renewal fee patent year 03 | 24.05.2017 | Renewal fee patent year 04 | 23.10.2018 | Renewal fee patent year 05 | 22.05.2019 | Renewal fee patent year 06 | 19.05.2020 | Renewal fee patent year 07 | Penalty fee | Additional fee for renewal fee | 31.05.2018 | 05   M06   Fee paid on   23.10.2018 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 21.10.2020 | CY | 21.10.2020 | DK | 21.10.2020 | EE | 21.10.2020 | FI | 21.10.2020 | HR | 21.10.2020 | LT | 21.10.2020 | LV | 21.10.2020 | MC | 21.10.2020 | MK | 21.10.2020 | MT | 21.10.2020 | PL | 21.10.2020 | RO | 21.10.2020 | RS | 21.10.2020 | SI | 21.10.2020 | SK | 21.10.2020 | SM | 21.10.2020 | TR | 21.10.2020 | BG | 21.01.2021 | NO | 21.01.2021 | GR | 22.01.2021 | IS | 21.02.2021 | PT | 22.02.2021 | IE | 18.05.2021 | LU | 18.05.2021 | BE | 31.05.2021 | FR | 31.05.2021 | [2026/04] |
| Former [2024/41] | AL | 21.10.2020 | |
| CY | 21.10.2020 | ||
| DK | 21.10.2020 | ||
| EE | 21.10.2020 | ||
| FI | 21.10.2020 | ||
| HR | 21.10.2020 | ||
| LT | 21.10.2020 | ||
| LV | 21.10.2020 | ||
| MC | 21.10.2020 | ||
| MK | 21.10.2020 | ||
| MT | 21.10.2020 | ||
| PL | 21.10.2020 | ||
| RO | 21.10.2020 | ||
| RS | 21.10.2020 | ||
| SI | 21.10.2020 | ||
| SK | 21.10.2020 | ||
| SM | 21.10.2020 | ||
| BG | 21.01.2021 | ||
| NO | 21.01.2021 | ||
| GR | 22.01.2021 | ||
| IS | 21.02.2021 | ||
| PT | 22.02.2021 | ||
| IE | 18.05.2021 | ||
| LU | 18.05.2021 | ||
| BE | 31.05.2021 | ||
| FR | 31.05.2021 | ||
| Former [2024/22] | AL | 21.10.2020 | |
| CY | 21.10.2020 | ||
| DK | 21.10.2020 | ||
| EE | 21.10.2020 | ||
| FI | 21.10.2020 | ||
| HR | 21.10.2020 | ||
| LT | 21.10.2020 | ||
| LV | 21.10.2020 | ||
| MC | 21.10.2020 | ||
| MK | 21.10.2020 | ||
| PL | 21.10.2020 | ||
| RO | 21.10.2020 | ||
| RS | 21.10.2020 | ||
| SI | 21.10.2020 | ||
| SK | 21.10.2020 | ||
| SM | 21.10.2020 | ||
| BG | 21.01.2021 | ||
| NO | 21.01.2021 | ||
| GR | 22.01.2021 | ||
| IS | 21.02.2021 | ||
| PT | 22.02.2021 | ||
| IE | 18.05.2021 | ||
| LU | 18.05.2021 | ||
| BE | 31.05.2021 | ||
| FR | 31.05.2021 | ||
| Former [2023/30] | AL | 21.10.2020 | |
| CY | 21.10.2020 | ||
| DK | 21.10.2020 | ||
| EE | 21.10.2020 | ||
| FI | 21.10.2020 | ||
| HR | 21.10.2020 | ||
| LT | 21.10.2020 | ||
| LV | 21.10.2020 | ||
| MC | 21.10.2020 | ||
| PL | 21.10.2020 | ||
| RO | 21.10.2020 | ||
| RS | 21.10.2020 | ||
| SI | 21.10.2020 | ||
| SK | 21.10.2020 | ||
| SM | 21.10.2020 | ||
| BG | 21.01.2021 | ||
| NO | 21.01.2021 | ||
| GR | 22.01.2021 | ||
| IS | 21.02.2021 | ||
| PT | 22.02.2021 | ||
| IE | 18.05.2021 | ||
| LU | 18.05.2021 | ||
| BE | 31.05.2021 | ||
| FR | 31.05.2021 | ||
| Former [2022/34] | AL | 21.10.2020 | |
| DK | 21.10.2020 | ||
| EE | 21.10.2020 | ||
| FI | 21.10.2020 | ||
| HR | 21.10.2020 | ||
| LT | 21.10.2020 | ||
| LV | 21.10.2020 | ||
| MC | 21.10.2020 | ||
| PL | 21.10.2020 | ||
| RO | 21.10.2020 | ||
| RS | 21.10.2020 | ||
| SI | 21.10.2020 | ||
| SK | 21.10.2020 | ||
| SM | 21.10.2020 | ||
| BG | 21.01.2021 | ||
| NO | 21.01.2021 | ||
| GR | 22.01.2021 | ||
| IS | 21.02.2021 | ||
| PT | 22.02.2021 | ||
| IE | 18.05.2021 | ||
| LU | 18.05.2021 | ||
| BE | 31.05.2021 | ||
| FR | 31.05.2021 | ||
| Former [2022/23] | AL | 21.10.2020 | |
| DK | 21.10.2020 | ||
| EE | 21.10.2020 | ||
| FI | 21.10.2020 | ||
| HR | 21.10.2020 | ||
| LT | 21.10.2020 | ||
| LV | 21.10.2020 | ||
| MC | 21.10.2020 | ||
| PL | 21.10.2020 | ||
| RO | 21.10.2020 | ||
| RS | 21.10.2020 | ||
| SI | 21.10.2020 | ||
| SK | 21.10.2020 | ||
| SM | 21.10.2020 | ||
| BG | 21.01.2021 | ||
| NO | 21.01.2021 | ||
| GR | 22.01.2021 | ||
| IS | 21.02.2021 | ||
| PT | 22.02.2021 | ||
| IE | 18.05.2021 | ||
| LU | 18.05.2021 | ||
| FR | 31.05.2021 | ||
| Former [2022/21] | AL | 21.10.2020 | |
| DK | 21.10.2020 | ||
| EE | 21.10.2020 | ||
| FI | 21.10.2020 | ||
| HR | 21.10.2020 | ||
| LT | 21.10.2020 | ||
| LV | 21.10.2020 | ||
| MC | 21.10.2020 | ||
| PL | 21.10.2020 | ||
| RO | 21.10.2020 | ||
| RS | 21.10.2020 | ||
| SI | 21.10.2020 | ||
| SK | 21.10.2020 | ||
| SM | 21.10.2020 | ||
| BG | 21.01.2021 | ||
| NO | 21.01.2021 | ||
| GR | 22.01.2021 | ||
| PT | 22.02.2021 | ||
| IE | 18.05.2021 | ||
| LU | 18.05.2021 | ||
| IS | 24.12.2021 | ||
| Former [2022/10] | AL | 21.10.2020 | |
| DK | 21.10.2020 | ||
| EE | 21.10.2020 | ||
| FI | 21.10.2020 | ||
| HR | 21.10.2020 | ||
| LT | 21.10.2020 | ||
| LV | 21.10.2020 | ||
| MC | 21.10.2020 | ||
| PL | 21.10.2020 | ||
| RO | 21.10.2020 | ||
| RS | 21.10.2020 | ||
| SI | 21.10.2020 | ||
| SK | 21.10.2020 | ||
| SM | 21.10.2020 | ||
| BG | 21.01.2021 | ||
| NO | 21.01.2021 | ||
| GR | 22.01.2021 | ||
| PT | 22.02.2021 | ||
| LU | 18.05.2021 | ||
| IS | 24.12.2021 | ||
| Former [2022/09] | AL | 21.10.2020 | |
| DK | 21.10.2020 | ||
| EE | 21.10.2020 | ||
| FI | 21.10.2020 | ||
| HR | 21.10.2020 | ||
| LT | 21.10.2020 | ||
| LV | 21.10.2020 | ||
| MC | 21.10.2020 | ||
| PL | 21.10.2020 | ||
| RO | 21.10.2020 | ||
| RS | 21.10.2020 | ||
| SI | 21.10.2020 | ||
| SK | 21.10.2020 | ||
| SM | 21.10.2020 | ||
| BG | 21.01.2021 | ||
| NO | 21.01.2021 | ||
| GR | 22.01.2021 | ||
| IS | 21.02.2021 | ||
| PT | 22.02.2021 | ||
| LU | 18.05.2021 | ||
| Former [2022/07] | AL | 21.10.2020 | |
| DK | 21.10.2020 | ||
| EE | 21.10.2020 | ||
| FI | 21.10.2020 | ||
| HR | 21.10.2020 | ||
| LT | 21.10.2020 | ||
| LV | 21.10.2020 | ||
| MC | 21.10.2020 | ||
| PL | 21.10.2020 | ||
| RO | 21.10.2020 | ||
| RS | 21.10.2020 | ||
| SI | 21.10.2020 | ||
| SK | 21.10.2020 | ||
| SM | 21.10.2020 | ||
| BG | 21.01.2021 | ||
| NO | 21.01.2021 | ||
| GR | 22.01.2021 | ||
| IS | 21.02.2021 | ||
| PT | 22.02.2021 | ||
| Former [2021/51] | AL | 21.10.2020 | |
| DK | 21.10.2020 | ||
| EE | 21.10.2020 | ||
| FI | 21.10.2020 | ||
| HR | 21.10.2020 | ||
| LT | 21.10.2020 | ||
| LV | 21.10.2020 | ||
| PL | 21.10.2020 | ||
| RO | 21.10.2020 | ||
| RS | 21.10.2020 | ||
| SI | 21.10.2020 | ||
| SK | 21.10.2020 | ||
| SM | 21.10.2020 | ||
| BG | 21.01.2021 | ||
| NO | 21.01.2021 | ||
| GR | 22.01.2021 | ||
| IS | 21.02.2021 | ||
| PT | 22.02.2021 | ||
| Former [2021/50] | AL | 21.10.2020 | |
| DK | 21.10.2020 | ||
| EE | 21.10.2020 | ||
| ES | 21.10.2020 | ||
| FI | 21.10.2020 | ||
| HR | 21.10.2020 | ||
| LT | 21.10.2020 | ||
| LV | 21.10.2020 | ||
| PL | 21.10.2020 | ||
| RO | 21.10.2020 | ||
| RS | 21.10.2020 | ||
| SI | 21.10.2020 | ||
| SK | 21.10.2020 | ||
| SM | 21.10.2020 | ||
| BG | 21.01.2021 | ||
| NO | 21.01.2021 | ||
| GR | 22.01.2021 | ||
| IS | 21.02.2021 | ||
| PT | 22.02.2021 | ||
| Former [2021/45] | AL | 21.10.2020 | |
| DK | 21.10.2020 | ||
| EE | 21.10.2020 | ||
| ES | 21.10.2020 | ||
| FI | 21.10.2020 | ||
| HR | 21.10.2020 | ||
| LT | 21.10.2020 | ||
| LV | 21.10.2020 | ||
| PL | 21.10.2020 | ||
| RO | 21.10.2020 | ||
| RS | 21.10.2020 | ||
| SK | 21.10.2020 | ||
| SM | 21.10.2020 | ||
| BG | 21.01.2021 | ||
| NO | 21.01.2021 | ||
| GR | 22.01.2021 | ||
| IS | 21.02.2021 | ||
| PT | 22.02.2021 | ||
| Former [2021/37] | DK | 21.10.2020 | |
| EE | 21.10.2020 | ||
| ES | 21.10.2020 | ||
| FI | 21.10.2020 | ||
| HR | 21.10.2020 | ||
| LT | 21.10.2020 | ||
| LV | 21.10.2020 | ||
| PL | 21.10.2020 | ||
| RO | 21.10.2020 | ||
| RS | 21.10.2020 | ||
| SK | 21.10.2020 | ||
| SM | 21.10.2020 | ||
| BG | 21.01.2021 | ||
| NO | 21.01.2021 | ||
| GR | 22.01.2021 | ||
| IS | 21.02.2021 | ||
| PT | 22.02.2021 | ||
| Former [2021/36] | EE | 21.10.2020 | |
| ES | 21.10.2020 | ||
| FI | 21.10.2020 | ||
| HR | 21.10.2020 | ||
| LT | 21.10.2020 | ||
| LV | 21.10.2020 | ||
| PL | 21.10.2020 | ||
| RO | 21.10.2020 | ||
| RS | 21.10.2020 | ||
| SK | 21.10.2020 | ||
| SM | 21.10.2020 | ||
| BG | 21.01.2021 | ||
| NO | 21.01.2021 | ||
| GR | 22.01.2021 | ||
| IS | 21.02.2021 | ||
| PT | 22.02.2021 | ||
| Former [2021/35] | ES | 21.10.2020 | |
| FI | 21.10.2020 | ||
| HR | 21.10.2020 | ||
| LT | 21.10.2020 | ||
| LV | 21.10.2020 | ||
| PL | 21.10.2020 | ||
| RO | 21.10.2020 | ||
| RS | 21.10.2020 | ||
| SK | 21.10.2020 | ||
| SM | 21.10.2020 | ||
| BG | 21.01.2021 | ||
| NO | 21.01.2021 | ||
| GR | 22.01.2021 | ||
| IS | 21.02.2021 | ||
| PT | 22.02.2021 | ||
| Former [2021/33] | ES | 21.10.2020 | |
| FI | 21.10.2020 | ||
| HR | 21.10.2020 | ||
| LT | 21.10.2020 | ||
| LV | 21.10.2020 | ||
| PL | 21.10.2020 | ||
| RS | 21.10.2020 | ||
| SM | 21.10.2020 | ||
| BG | 21.01.2021 | ||
| NO | 21.01.2021 | ||
| GR | 22.01.2021 | ||
| IS | 21.02.2021 | ||
| PT | 22.02.2021 | ||
| Former [2021/32] | ES | 21.10.2020 | |
| FI | 21.10.2020 | ||
| HR | 21.10.2020 | ||
| LV | 21.10.2020 | ||
| PL | 21.10.2020 | ||
| RS | 21.10.2020 | ||
| SM | 21.10.2020 | ||
| BG | 21.01.2021 | ||
| NO | 21.01.2021 | ||
| GR | 22.01.2021 | ||
| IS | 21.02.2021 | ||
| PT | 22.02.2021 | ||
| Former [2021/28] | ES | 21.10.2020 | |
| FI | 21.10.2020 | ||
| HR | 21.10.2020 | ||
| LV | 21.10.2020 | ||
| PL | 21.10.2020 | ||
| RS | 21.10.2020 | ||
| BG | 21.01.2021 | ||
| NO | 21.01.2021 | ||
| GR | 22.01.2021 | ||
| IS | 21.02.2021 | ||
| PT | 22.02.2021 | ||
| Former [2021/25] | ES | 21.10.2020 | |
| FI | 21.10.2020 | ||
| LV | 21.10.2020 | ||
| PL | 21.10.2020 | ||
| RS | 21.10.2020 | ||
| BG | 21.01.2021 | ||
| NO | 21.01.2021 | ||
| GR | 22.01.2021 | ||
| IS | 21.02.2021 | ||
| PT | 22.02.2021 | ||
| Former [2021/24] | FI | 21.10.2020 | |
| LV | 21.10.2020 | ||
| RS | 21.10.2020 | ||
| BG | 21.01.2021 | ||
| NO | 21.01.2021 | ||
| GR | 22.01.2021 | ||
| PT | 22.02.2021 | ||
| Former [2021/23] | FI | 21.10.2020 | |
| LV | 21.10.2020 | ||
| RS | 21.10.2020 | ||
| NO | 21.01.2021 | ||
| GR | 22.01.2021 | ||
| PT | 22.02.2021 | ||
| Former [2021/22] | FI | 21.10.2020 | |
| RS | 21.10.2020 | ||
| NO | 21.01.2021 | ||
| PT | 22.02.2021 | ||
| Former [2021/21] | FI | 21.10.2020 | |
| PT | 22.02.2021 | ||
| Former [2021/20] | FI | 21.10.2020 | Cited in | International search | [XYI] CH707215 (MÜLLER PETER A et al.) | [XYI] FR2918290 (EMMENDOERFFER CLAUDE LOUIS et al.) | [XYI] DE3143322 (SCHYDLO MARTIN et al.) | [XYI] DE2319902 (CILLICHEMIE et al.) | [YD] DE202012011034 (BINDER SIEGFRIED et al.) | [XYI] AT506821 (FRAENKEL ANDRES et al.) [X] 1,5,6,17,21,23 * figures 1,2 * * paragraph [0022] *[Y] 2,14-16,18-20,22 [I] 4,7,10-13 | by applicant | DE202011106999 | DE202012011034 | DE3313549 | DE102006061504 | DE2401040 | Opposition | CH707215 | FR2918290 | DE3143322 | DE2319902 | DE202012011034 | AT506821 | AU2009213035 | US6030180 | US2010050335 | DE202011106999 | US2010306916 | US6170095 | US2008148470 | DE202012011034 | CH707215 | FR2918290 | CH707215 | FR2918290 | DE3143322 | DE2319902 | DE202012011034 | AT506821 | DE7630719 | DE202011106999 | WO2015176694 | US10508462 | CN106460400 | FR2918290 | AT506821 | DE3143322 | DE69209861 | US2012144578 | US2010258206 | US2010058528 | US2010005335 | DE202012011034 | CH707215 | DE2319902 | US6030180 | DE202011106999 | ANONYMOUS: "Swimming pool equipment - Part 3: Additional specific safety requirements and test methods for inlets and outlets and water/air based water leisure features DIN EN 13451-3", DIN EN 13451-3, 1 November 2013 (2013-11-01), pages 1 - 32, XP055830612 | "Catalogue 2014/15 JetStream UWE", CATALOGUE 2014/15 JETSTREAM UWE, 19 December 2013 (2013-12-19), pages 1 - 97, Retrieved from the Internet | ANONYMOUS: "MONTAGE- UND BEDIENUNGSANLEITUNG BAMBO 2", JETSTREAM UWE, 1 May 2012 (2012-05-01), pages 1 - 28, XP055830617, Retrieved from the Internet | ANONYMOUS: "Gegenstromanlagen geniee deine Freiheit.", FLUVO, 1 April 2013 (2013-04-01), pages 1 - 13, XP055830622, Retrieved from the Internet | "PLANUNG VON SCHWIMMBADERN", 1 January 1989, article CHRISTOPH SAUNUS: "PLANUNG VON SCHWIMMBADERN", pages: 284 - 287, XP055933509 | ANONYMOUS: "Vermeidung von Gefahren an Ansaug-Ablauf- und Zulaufanlagen in Schwimm- und Badebecken", DEUTSCHE GESELLSCHAFT FR DAS BADEWESEN E.V., 1 May 2007 (2007-05-01), XP055933514 | ANONYMOUS: "Swimming pool equipment - Part 3: Additional specific safety requirements and test methods for inlets and outlets and water/air based water leisure features DIN EN 13451-3", DIN EN 13451-3, 1 November 2013 (2013-11-01), pages 1 - 32, XP055830612 | ANONYMOUS: "GEGENSTROMSCHWIMMANLAGEN BGA 160-230 BGA 160-115 ", BINDER MECA TEC DIRVE MADE IN GERMANY, 1 January 2012 (2012-01-01), XP055933470 | ANONYMOUS: "TURBINENSCHWIMMANLAGE BGA 160, BGA 320 ", BINDER MECA TEC DIRVE MADE IN GERMANY, 1 January 2015 (2015-01-01), XP055933474 | CROSSFIELD FILM: "Binder - die Gegenstromanlage - Gegenstromschwimmanlage", YOUTUBE, XP055933480, Retrieved from the Internet | BINDER GEGENSTROMANLAGEN & MOTOREN: "Schwimmen auf der Stelle - Die Gegenstromanlage", YOUTUBE, XP055933484, Retrieved from the Internet | ANONYMOUS: "DIN EN 13451-1", DEUTSCHE NORM, 1 November 2011 (2011-11-01), XP055933487 | ANONYMOUS: "DIN EN 13451-1", DEUTSCHE NORM, 1 November 2011 (2011-11-01), XP055933487 | ANONYMOUS: "din en 13451-2", DEUTSCHE NORM, 1 July 2001 (2001-07-01), XP055934027 | ANONYMOUS: "DIN EN 13451-3", DEUTSCH NORM, 1 November 2011 (2011-11-01), XP055934033 | ANONYMOUS: "GEGENSTROMSCHWIMMANLAGEN BGA 160-230 BGA 160-115 ", BINDER MECA TEC DIRVE MADE IN GERMANY, 1 January 2012 (2012-01-01), XP055933470 | "Technisches Datenblatt Gegen- stromanlagen", GOOGLE | ANONYMOUS: "bta_BADU_Jet-primavera Einbau-Gegenstrom-Schwimmanlage", _BADU_JET-PRIMAVERA, 1 October 2012 (2012-10-01), XP055934040, [retrieved on 20220622] | ANONYMOUS: "Komplettprogramm / Complete pro-gramme", FITSTAR, 1 March 2012 (2012-03-01), XP055934047 | ANONYMOUS: "schwimmbadpumpen ", SPA AND HOME SCHWIMMBADER WELLNES TECHNIK, 1 January 2014 (2014-01-01), XP055934052 |