EP3186195 - METHOD AND APPARATUS FOR DECALCIFYING EFFLUENT OF A WATER TREATMENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 16.10.2020 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 08.11.2019 | ||
Former | Grant of patent is intended Status updated on 02.07.2019 | ||
Former | Examination is in progress Status updated on 29.12.2017 | ||
Former | Request for examination was made Status updated on 02.06.2017 | ||
Former | The international publication has been made Status updated on 27.03.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Industriewater Eerbeek B.V. Kanaalweg 8 A 6961 LW Eerbeek / NL | [2017/27] | Inventor(s) | 01 /
HULSHOF, Walter Antonius Maria c/o Kanaalweg 8A NL-6961 LW Eerbeek / NL | [2017/27] | Representative(s) | V.O. P.O. Box 87930 Carnegieplein 5 2508 DH Den Haag / NL | [2017/27] | Application number, filing date | 14772231.8 | 29.08.2014 | [2017/27] | WO2014NL50591 | Filing language | NL | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016032321 | Date: | 03.03.2016 | Language: | EN | [2016/09] | Type: | A1 Application with search report | No.: | EP3186195 | Date: | 05.07.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 03.03.2016 takes the place of the publication of the European patent application. | [2017/27] | Type: | B1 Patent specification | No.: | EP3186195 | Date: | 11.12.2019 | Language: | EN | [2019/50] | Search report(s) | International search report - published on: | EP | 03.03.2016 | Classification | IPC: | C02F1/20, C02F1/52, C02F101/10, C02F103/28 | [2017/27] | CPC: |
C02F1/20 (EP);
C02F5/02 (EP);
C02F2001/5218 (EP);
C02F2101/10 (EP);
C02F2101/105 (EP);
C02F2103/28 (EP);
C02F2303/22 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/27] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR ENTKALKUNG VON ABFLUSS EINER WASSERBEHANDLUNG | [2017/27] | English: | METHOD AND APPARATUS FOR DECALCIFYING EFFLUENT OF A WATER TREATMENT | [2017/27] | French: | PROCÉDÉ ET APPAREIL DE DÉCALCIFICATION D'EFFLUENT D'UN TRAITEMENT D'EAU | [2017/27] | Entry into regional phase | 27.03.2017 | National basic fee paid | 27.03.2017 | Designation fee(s) paid | 27.03.2017 | Examination fee paid | Examination procedure | 27.03.2017 | Examination requested [2017/27] | 27.03.2017 | Date on which the examining division has become responsible | 06.10.2017 | Amendment by applicant (claims and/or description) | 04.01.2018 | Despatch of a communication from the examining division (Time limit: M04) | 02.05.2018 | Reply to a communication from the examining division | 19.07.2018 | Despatch of a communication from the examining division (Time limit: M04) | 20.11.2018 | Reply to a communication from the examining division | 15.04.2019 | Despatch of a communication from the examining division (Time limit: M02) | 13.06.2019 | Reply to a communication from the examining division | 03.07.2019 | Communication of intention to grant the patent | 04.11.2019 | Fee for grant paid | 04.11.2019 | Fee for publishing/printing paid | 04.11.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 14.09.2020 | No opposition filed within time limit [2020/47] | Fees paid | Renewal fee | 27.03.2017 | Renewal fee patent year 03 | 28.07.2017 | Renewal fee patent year 04 | 24.07.2018 | Renewal fee patent year 05 | 24.09.2019 | Renewal fee patent year 06 | Penalty fee | Additional fee for renewal fee | 31.08.2019 | 06   M06   Fee paid on   24.09.2019 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.08.2014 | AL | 11.12.2019 | AT | 11.12.2019 | CY | 11.12.2019 | CZ | 11.12.2019 | DK | 11.12.2019 | EE | 11.12.2019 | ES | 11.12.2019 | FI | 11.12.2019 | HR | 11.12.2019 | IT | 11.12.2019 | LT | 11.12.2019 | LV | 11.12.2019 | MC | 11.12.2019 | MK | 11.12.2019 | MT | 11.12.2019 | NL | 11.12.2019 | PL | 11.12.2019 | RO | 11.12.2019 | RS | 11.12.2019 | SE | 11.12.2019 | SI | 11.12.2019 | SK | 11.12.2019 | SM | 11.12.2019 | TR | 11.12.2019 | BG | 11.03.2020 | NO | 11.03.2020 | GR | 12.03.2020 | IS | 11.04.2020 | PT | 06.05.2020 | GB | 29.08.2020 | IE | 29.08.2020 | LU | 29.08.2020 | BE | 31.08.2020 | CH | 31.08.2020 | FR | 31.08.2020 | LI | 31.08.2020 | [2022/32] |
Former [2022/27] | HU | 29.08.2014 | |
AL | 11.12.2019 | ||
AT | 11.12.2019 | ||
CY | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
MT | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
TR | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
GB | 29.08.2020 | ||
IE | 29.08.2020 | ||
LU | 29.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
FR | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/38] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
GB | 29.08.2020 | ||
IE | 29.08.2020 | ||
LU | 29.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
FR | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/37] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
IE | 29.08.2020 | ||
LU | 29.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
FR | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/36] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
LU | 29.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
FR | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/35] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
LU | 29.08.2020 | ||
CH | 31.08.2020 | ||
FR | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/20] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
LU | 29.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/18] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2021/10] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2020/51] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2020/47] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2020/40] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2020/37] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
PT | 06.05.2020 | ||
Former [2020/36] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
PT | 06.05.2020 | ||
Former [2020/35] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/34] | AL | 11.12.2019 | |
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/32] | AL | 11.12.2019 | |
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/25] | FI | 11.12.2019 | |
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/23] | FI | 11.12.2019 | |
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/22] | FI | 11.12.2019 | |
LT | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
Former [2020/21] | NO | 11.03.2020 | Cited in | International search | [A]EP0097388 (CSM SUIKER [NL]) [A] 1-13* the whole document *; | [I]EP1734011 (NALCO CO [US]) [I] 1 * paragraph [0015] - paragraph [0016] *; | [I]DE102008028003 (MERI ENTSORGUNGSTECH PAPIERIND [DE]) [I] 1-13 * figure 2 * * paragraph [0068] *; | [A]DE102012209756 (SIEMENS AG [DE]) [A] 1-13 * the whole document *; | [XI]WO2014010776 (KOREA ELECTRIC POWER CORP [KR], et al) [X] 1,3-6,9,10 * figure 1 * * paragraph [0036] * [I] 2,5-8,11-13; | [A] - PATRICK HUBER, "Kinetics of CO 2 Stripping and Its Effect on the Saturation State of CaCO 3 upon Aeration of a CaCO 3 -CO 2 -H 2 O System: Application to Scaling in the Papermaking Process", INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH., US, (20111221), vol. 50, no. 24, doi:10.1021/ie200956z, ISSN 0888-5885, pages 13655 - 13661, XP055244140 [A] 1-13 * the whole document * DOI: http://dx.doi.org/10.1021/ie200956z | [A] - RAVIV SEGEV ET AL, "Modeling CaCO3 precipitation in fluidized bed CO2 stripping desalination process", DESALINATION., NL, (20130201), vol. 311, doi:10.1016/j.desal.2012.11.024, ISSN 0011-9164, pages 192 - 197, XP055244138 [A] 1-13 * the whole document * DOI: http://dx.doi.org/10.1016/j.desal.2012.11.024 |