EP3052439 - PROCESS FOR MANUFACTURING A PURIFIED AQUEOUS HYDROGEN PEROXIDE SOLUTION [Right-click to bookmark this link] | Status | Patent maintained as amended Status updated on 20.05.2022 Database last updated on 03.06.2024 | |
Former | The patent has been granted Status updated on 05.07.2019 | ||
Former | Grant of patent is intended Status updated on 20.03.2019 | ||
Former | Examination is in progress Status updated on 03.03.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Solvay SA Rue de Ransbeek, 310 1120 Brussels / BE | [2022/25] |
Former [2016/32] | For all designated states Solvay SA Rue de Ransbeek, 310 1120 Brussels / BE | Inventor(s) | 01 /
CARLIER, Juan-Teva Rue des Fonds 13 B- 5140 Tongrinne (Sombreffe) / BE | 02 /
DOURNEL, Pierre Rue Joseph Coosemans 13 B-1030 Brussels / BE | 03 /
VENBRUX, Henk Arboretumlaan 29 B-3080 Tervuren / BE | 04 /
HOOGHE, Lieven Bankwegelhof 27 B-9120 Beveren-Waas / BE | [2018/13] |
Former [2016/32] | 01 /
CARLIER, Juan-Teva Rue des Fonds 13 B- 5140 Tongrinne (Sombreffe) / BE | ||
02 /
DOURNEL, Pierre Rue Joseph Coosemans 13 B-1030 Brussels / BE | |||
03 /
VENBRUX, Henk Arboretumlaan 29 B-3080 Tervuren / BE | Representative(s) | Vande Gucht, Anne Solvay S.A. Intellectual Assets Management Rue de Ransbeek, 310 1120 Bruxelles / BE | [2022/25] | Application number, filing date | 14777659.5 | 02.10.2014 | [2016/32] | WO2014EP71121 | Priority number, date | EP20130187128 | 02.10.2013 Original published format: EP 13187128 | EP20140175503 | 03.07.2014 Original published format: EP 14175503 | [2016/32] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015049327 | Date: | 09.04.2015 | Language: | EN | [2015/14] | Type: | A1 Application with search report | No.: | EP3052439 | Date: | 10.08.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 09.04.2015 takes the place of the publication of the European patent application. | [2016/32] | Type: | B1 Patent specification | No.: | EP3052439 | Date: | 07.08.2019 | Language: | EN | [2019/32] | Type: | B2 New European patent specification | No.: | EP3052439 | Date: | 22.06.2022 | Language: | EN | [2022/25] | Search report(s) | International search report - published on: | EP | 09.04.2015 | Classification | IPC: | C01B15/013, C07D303/04 | [2019/15] | CPC: |
C01B15/013 (EP,KR,RU,US);
C07D303/02 (RU);
C07D303/04 (EP,KR,US)
|
Former IPC [2016/32] | C01B15/013, C07D303/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/32] | Title | German: | VERFAHREN ZUR HERSTELLUNG EINER GEREINIGTEN WÄSSRIGEN WASSERSTOFFPEROXIDLÖSUNG | [2016/32] | English: | PROCESS FOR MANUFACTURING A PURIFIED AQUEOUS HYDROGEN PEROXIDE SOLUTION | [2016/32] | French: | PROCÉDÉ DE FABRICATION D'UNE SOLUTION AQUEUSE PURIFIÉE DE PEROXYDE D'HYDROGÈNE | [2016/32] | Entry into regional phase | 02.05.2016 | National basic fee paid | 02.05.2016 | Designation fee(s) paid | 02.05.2016 | Examination fee paid | Examination procedure | 02.05.2016 | Examination requested [2016/32] | 08.11.2016 | Amendment by applicant (claims and/or description) | 02.03.2017 | Despatch of a communication from the examining division (Time limit: M04) | 10.05.2017 | Reply to a communication from the examining division | 16.03.2018 | Despatch of a communication from the examining division (Time limit: M06) | 31.08.2018 | Reply to a communication from the examining division | 21.03.2019 | Communication of intention to grant the patent | 26.06.2019 | Fee for grant paid | 26.06.2019 | Fee for publishing/printing paid | 26.06.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | EP16197866.3 / EP3156365 | Opposition(s) | Opponent(s) | 01
06.05.2020
14.05.2020
ADMISSIBLE Evonik Operations GmbH Rellinghauser Straße 1-11 45128 Essen / DE Opponent's representative f & e patent Braunsberger Feld 29 51429 Bergisch Gladbach / DE | [2021/27] |
Former [2020/25] | |||
Opponent(s) | 01
06.05.2020
ADMISSIBLE Evonik Operations GmbH Rellinghauser Straße 1-11 45128 Essen / DE Opponent's representative Evonik Patent Association c/o Evonik Industries AG IP Management Bau 1042A/PB 15 Paul-Baumann-Straße 1 45772 Marl / DE | 17.06.2020 | Invitation to proprietor to file observations on the notice of opposition | 21.10.2020 | Reply of patent proprietor to notice(s) of opposition | 20.10.2021 | Legal effect of interlocutory decision in opposition | 20.10.2021 | Date of oral proceedings | 18.11.2021 | Despatch of interlocutory decision in opposition | 18.11.2021 | Despatch of minutes of oral proceedings | 07.03.2022 | Despatch of communication that the patent will be maintained as amended | 17.05.2022 | Fee for printing new specification paid | Fees paid | Renewal fee | 31.10.2016 | Renewal fee patent year 03 | 02.11.2017 | Renewal fee patent year 04 | 31.10.2018 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 07.08.2019 | CY | 07.08.2019 | CZ | 07.08.2019 | DK | 07.08.2019 | EE | 07.08.2019 | HR | 07.08.2019 | LT | 07.08.2019 | LV | 07.08.2019 | MC | 07.08.2019 | MK | 07.08.2019 | MT | 07.08.2019 | PL | 07.08.2019 | RO | 07.08.2019 | RS | 07.08.2019 | SE | 07.08.2019 | SI | 07.08.2019 | SK | 07.08.2019 | SM | 07.08.2019 | TR | 07.08.2019 | IE | 02.10.2019 | LU | 02.10.2019 | CH | 31.10.2019 | FR | 31.10.2019 | LI | 31.10.2019 | BG | 07.11.2019 | NO | 07.11.2019 | GR | 08.11.2019 | IS | 07.12.2019 | [2022/31] |
Former [2021/35] | AL | 07.08.2019 | |
CY | 07.08.2019 | ||
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
MT | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
SI | 07.08.2019 | ||
SK | 07.08.2019 | ||
SM | 07.08.2019 | ||
TR | 07.08.2019 | ||
IE | 02.10.2019 | ||
LU | 02.10.2019 | ||
CH | 31.10.2019 | ||
FR | 31.10.2019 | ||
LI | 31.10.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
Former [2021/34] | AL | 07.08.2019 | |
CY | 07.08.2019 | ||
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
MT | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
SI | 07.08.2019 | ||
SK | 07.08.2019 | ||
SM | 07.08.2019 | ||
TR | 07.08.2019 | ||
IE | 02.10.2019 | ||
LU | 02.10.2019 | ||
CH | 31.10.2019 | ||
LI | 31.10.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
Former [2021/26] | AL | 07.08.2019 | |
CY | 07.08.2019 | ||
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
SI | 07.08.2019 | ||
SK | 07.08.2019 | ||
SM | 07.08.2019 | ||
TR | 07.08.2019 | ||
IE | 02.10.2019 | ||
LU | 02.10.2019 | ||
CH | 31.10.2019 | ||
LI | 31.10.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
Former [2020/46] | AL | 07.08.2019 | |
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
SI | 07.08.2019 | ||
SK | 07.08.2019 | ||
SM | 07.08.2019 | ||
TR | 07.08.2019 | ||
IE | 02.10.2019 | ||
LU | 02.10.2019 | ||
CH | 31.10.2019 | ||
LI | 31.10.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
Former [2020/37] | AL | 07.08.2019 | |
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
SI | 07.08.2019 | ||
SK | 07.08.2019 | ||
SM | 07.08.2019 | ||
TR | 07.08.2019 | ||
LU | 02.10.2019 | ||
CH | 31.10.2019 | ||
LI | 31.10.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
Former [2020/36] | AL | 07.08.2019 | |
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
SK | 07.08.2019 | ||
SM | 07.08.2019 | ||
TR | 07.08.2019 | ||
LU | 02.10.2019 | ||
CH | 31.10.2019 | ||
LI | 31.10.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
Former [2020/35] | AL | 07.08.2019 | |
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
SK | 07.08.2019 | ||
SM | 07.08.2019 | ||
TR | 07.08.2019 | ||
LU | 02.10.2019 | ||
CH | 31.10.2019 | ||
LI | 31.10.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 24.02.2020 | ||
Former [2020/34] | AL | 07.08.2019 | |
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
SK | 07.08.2019 | ||
SM | 07.08.2019 | ||
TR | 07.08.2019 | ||
CH | 31.10.2019 | ||
LI | 31.10.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 24.02.2020 | ||
Former [2020/27] | AL | 07.08.2019 | |
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
SK | 07.08.2019 | ||
SM | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AL | 07.08.2019 | |
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
SK | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AL | 07.08.2019 | |
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 07.08.2019 | |
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
Former [2020/22] | AL | 07.08.2019 | |
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
Former [2020/17] | AL | 07.08.2019 | |
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
Former [2020/15] | AL | 07.08.2019 | |
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
Former [2020/12] | HR | 07.08.2019 | |
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
Former [2020/11] | HR | 07.08.2019 | |
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
Former [2020/10] | LT | 07.08.2019 | |
SE | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
Former [2020/08] | LT | 07.08.2019 | |
NO | 07.11.2019 | Cited in | International search | [A]US5232680 (HONIG HELMUT [DE], et al) [A] 1-11 * column 4, lines 6-46 *; | [AD]US6224845 (PENNETREAU PASCAL [BE], et al) [AD] 1-11 * column 1, lines 28-32,42-47; claim 1 *; | [A]EP1167290 (SANTOKU CHEMICAL IND CO LTD [JP]) [A] 1-11 * paragraph [0003]; claim 1 *; | [A]US2006009371 (WANG XUE [US], et al) [A] 1-11* paragraphs [0012] , [0024] * | by applicant | EP0529723 | EP0965562 | EP20130187128 | EP20140175503 | Opposition | GB1077172 | WO0076989 | GB1070911 | WO2012076543 | - "Hydrogen Peroxide", Goor G. et al, Ullmann's Encyclopedia of Industrial Chemistry, Wiley-VCH, (2007), vol. 18, pages 393 - 427, XP055038254 DOI: http://dx.doi.org/10.1002/14356007.a13_443.pub2 | - "Hydrogen Peroxide", Goor G. et al, Ullmann's Encyclopedia of Industrial Chemistry, Wiley-VCH, (2007), vol. 18, pages 393 - 427 |