blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3030391

EP3030391 - METHOD FOR PRODUCING A HONEYCOMB INSULATING BUILDING BLOCK FROM NATURAL OR RECONSTITUTED STONE, BLOCK PRODUCED AND WALL PRODUCED WITH SUCH A BLOCK [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  22.01.2021
Database last updated on 05.10.2024
FormerThe patent has been granted
Status updated on  14.02.2020
FormerGrant of patent is intended
Status updated on  17.10.2019
FormerExamination is in progress
Status updated on  16.02.2019
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): AL, MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Occitanie Pierres
Lieu dit "Saint Henri"
46000 Cahors / FR
[2016/24]
Inventor(s)01 / BERTRAND, Jean-Luc
Saute Crabe
F-46150 Gigouzac / FR
 [2016/24]
Representative(s)Ipside
6, Impasse Michel Labrousse
31100 Toulouse / FR
[2016/24]
Application number, filing date14786950.711.08.2014
[2016/24]
WO2014FR52075
Priority number, dateFR2013000191209.08.2013         Original published format: FR 1301912
[2016/24]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report
No.:WO2015019033
Date:12.02.2015
Language:FR
[2015/06]
Type: A1 Application with search report 
No.:EP3030391
Date:15.06.2016
Language:FR
The application published by WIPO in one of the EPO official languages on 12.02.2015 takes the place of the publication of the European patent application.
[2016/24]
Type: B1 Patent specification 
No.:EP3030391
Date:18.03.2020
Language:FR
[2020/12]
Search report(s)International search report - published on:EP12.02.2015
ClassificationIPC:E04B2/28, E04B2/42, B28B11/12
[2019/42]
CPC:
B28B11/12 (EP); E04B2/28 (EP); E04B2/42 (EP)
Former IPC [2016/24]B28B11/12, E04B2/14, E04B2/42
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/24]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:VERFAHREN ZUR HERSTELLUNG EINES WABENFÖRMIGEN DÄMMBAUSTEINS AUS NATÜRLICHEM ODER WIEDERAUFBEREITETEM STEIN, HERGESTELLTER BAUSTEIN UND MIT SOLCH EINEM BAUSTEIN HERGESTELLTE WAND[2016/24]
English:METHOD FOR PRODUCING A HONEYCOMB INSULATING BUILDING BLOCK FROM NATURAL OR RECONSTITUTED STONE, BLOCK PRODUCED AND WALL PRODUCED WITH SUCH A BLOCK[2016/24]
French:PROCÉDÉ DE FABRICATION D'UN BLOC DE CONSTRUCTION ISOLANT ALVÉOLÉ EN PIERRE NATURELLE OU RECONSTITUÉE, BLOC REALISE ET MUR REALISE AVEC UN TEL BLOC[2016/24]
Entry into regional phase07.03.2016National basic fee paid 
07.03.2016Designation fee(s) paid 
07.03.2016Examination fee paid 
Examination procedure07.03.2016Examination requested  [2016/24]
31.10.2016Amendment by applicant (claims and/or description)
20.02.2019Despatch of a communication from the examining division (Time limit: M06)
29.08.2019Reply to a communication from the examining division
18.10.2019Communication of intention to grant the patent
10.02.2020Fee for grant paid
10.02.2020Fee for publishing/printing paid
10.02.2020Receipt of the translation of the claim(s)
Opposition(s)21.12.2020No opposition filed within time limit [2021/08]
Fees paidRenewal fee
30.08.2016Renewal fee patent year 03
31.08.2017Renewal fee patent year 04
31.08.2018Renewal fee patent year 05
29.08.2019Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU11.08.2014
AL18.03.2020
CY18.03.2020
CZ18.03.2020
EE18.03.2020
FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
MK18.03.2020
MT18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SI18.03.2020
SK18.03.2020
SM18.03.2020
TR18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
IE11.08.2020
[2022/31]
Former [2022/27]HU11.08.2014
CY18.03.2020
CZ18.03.2020
EE18.03.2020
FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
MT18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SI18.03.2020
SK18.03.2020
SM18.03.2020
TR18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
IE11.08.2020
Former [2021/37]CZ18.03.2020
EE18.03.2020
FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SI18.03.2020
SK18.03.2020
SM18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
IE11.08.2020
Former [2021/24]CZ18.03.2020
EE18.03.2020
FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SI18.03.2020
SK18.03.2020
SM18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
Former [2021/18]CZ18.03.2020
EE18.03.2020
FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SK18.03.2020
SM18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
Former [2021/14]CZ18.03.2020
EE18.03.2020
FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SK18.03.2020
SM18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
Former [2020/50]CZ18.03.2020
EE18.03.2020
FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SK18.03.2020
SM18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
Former [2020/49]CZ18.03.2020
FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SK18.03.2020
SM18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
Former [2020/48]FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SM18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
Former [2020/47]FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
RS18.03.2020
SE18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
Former [2020/46]FI18.03.2020
HR18.03.2020
LV18.03.2020
RS18.03.2020
SE18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
Former [2020/39]FI18.03.2020
HR18.03.2020
LV18.03.2020
RS18.03.2020
SE18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
Former [2020/38]FI18.03.2020
HR18.03.2020
LV18.03.2020
RS18.03.2020
SE18.03.2020
NO18.06.2020
GR19.06.2020
Former [2020/37]FI18.03.2020
HR18.03.2020
LV18.03.2020
RS18.03.2020
SE18.03.2020
NO18.06.2020
Former [2020/35]FI18.03.2020
NO18.06.2020
Cited inInternational search[XY]LU30700  (PACIFIC TRADING CORPORATION) [X] 1,18 * page 2, paragraph 15 - page 4, paragraph 5; figures 1-14 * [Y] 9-11;
 [XY]US2192723  (WHITACRE DONALD D) [X] 1,16,18,26 * page 2, line 10 - page 3, line 75; figures 1-5 * [Y] 25,27-30;
 [Y]DE907453  (SVENSKA AKTIEBOLAGET TELL) [Y] 28-30* page 3, line 13 - line 38; figure 3 *;
 [XY]GB2232696  (UNIV SALFORD [GB]) [X] 1,18,23,24 * page 1 * * page 6 - page 13; figures 1-11 * [Y] 25,27-31;
 [XYI]EP0893546  (IND REGIONALE BATIMENT [FR]) [X] 1,3,5-8,18-22 * column 1, line 3 - line 14 * * column 2, line 22 - column 3, line 20; figures 1,2 * [Y] 9-14,17,25,27-31 [I] 2,4;
 [XI]EP0984109  (ZIEGELEIEN FREIBURG & LAUSANNE [CH]) [X] 1,3,5,6 * paragraph [0001] * * paragraph [0006] * * paragraph [0029] - paragraph [0037]; figures 1-4a * [I] 2,4;
 [XYI]EP1120506  (EICHHORN EPL AG [CH]) [X] 1,3,5-8,15,18 * paragraph [0001] - paragraph [0002] * * paragraph [0009] - paragraph [0014]; figures 1-3 * [Y] 9-14,17,25,27-31 [I] 2,4
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.