EP2966798 - ACTIVE AND STANDBY CHANGEOVER METHOD, APPARATUS, DEVICE, AND SYSTEM FOR NETWORK DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.09.2020 Database last updated on 30.10.2024 | |
Former | The patent has been granted Status updated on 04.10.2019 | ||
Former | Grant of patent is intended Status updated on 26.06.2019 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states ZTE Corporation ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan District Shenzhen, Guangdong 518057 / CN | [2019/45] |
Former [2016/02] | For all designated states ZTE Corporation ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan District Shenzhen, Guangdong 518057 / CN | Inventor(s) | 01 /
SUN, Li c/o ZTE CORPORATION ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan Shenzhen Guangdong 518057 / CN | 02 /
WANG, Rihong c/o ZTE CORPORATION ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan Shenzhen Guangdong 518057 / CN | 03 /
ZHANG, Hongwei c/o ZTE CORPORATION ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan Shenzhen Guangdong 518057 / CN | [2016/02] | Representative(s) | Aipex B.V. Vestdijk 51 5611 CA Eindhoven / NL | [N/P] |
Former [2019/45] | Aipex B.V. P.O. Box 30223 3001 DE Rotterdam / NL | ||
Former [2016/02] | Gervasi, Gemma, et al Notarbartolo & Gervasi S.p.A. Corso di Porta Vittoria 9 20122 Milano / IT | Application number, filing date | 14788401.9 | 09.04.2014 | [2016/02] | WO2014CN74982 | Priority number, date | CN201310145157 | 24.04.2013 Original published format: CN201310145157 | [2016/02] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014173230 | Date: | 30.10.2014 | Language: | ZH | [2014/44] | Type: | A1 Application with search report | No.: | EP2966798 | Date: | 13.01.2016 | Language: | EN | [2016/02] | Type: | B1 Patent specification | No.: | EP2966798 | Date: | 06.11.2019 | Language: | EN | [2019/45] | Search report(s) | International search report - published on: | CN | 30.10.2014 | (Supplementary) European search report - dispatched on: | EP | 15.02.2016 | Classification | IPC: | H04L1/22 | [2016/02] | CPC: |
H04L1/22 (EP,US);
H04B10/038 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/02] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | AKTIVITÄTS- UND STANDBY-UMSCHALTVERFAHREN, MASCHINE, VORRICHTUNG UND SYSTEM FÜR EINE NETZWERKVORRICHTUNG | [2016/02] | English: | ACTIVE AND STANDBY CHANGEOVER METHOD, APPARATUS, DEVICE, AND SYSTEM FOR NETWORK DEVICE | [2016/02] | French: | PROCÉDÉ, APPAREIL, DISPOSITIF ET SYSTÈME DE BASCULEMENT ENTRE ACTIVITÉ ET VEILLE POUR DISPOSITIF DE RÉSEAU | [2016/02] | Entry into regional phase | 09.10.2015 | Translation filed | 09.10.2015 | National basic fee paid | 09.10.2015 | Search fee paid | 09.10.2015 | Designation fee(s) paid | 09.10.2015 | Examination fee paid | Examination procedure | 09.10.2015 | Examination requested [2016/02] | 12.09.2016 | Amendment by applicant (claims and/or description) | 27.06.2019 | Communication of intention to grant the patent | 23.09.2019 | Fee for grant paid | 23.09.2019 | Fee for publishing/printing paid | 23.09.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 07.08.2020 | No opposition filed within time limit [2020/42] | Fees paid | Renewal fee | 11.04.2016 | Renewal fee patent year 03 | 10.04.2017 | Renewal fee patent year 04 | 11.04.2018 | Renewal fee patent year 05 | 16.04.2019 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.04.2014 | AL | 06.11.2019 | AT | 06.11.2019 | CY | 06.11.2019 | CZ | 06.11.2019 | DK | 06.11.2019 | EE | 06.11.2019 | ES | 06.11.2019 | FI | 06.11.2019 | HR | 06.11.2019 | IT | 06.11.2019 | LT | 06.11.2019 | LV | 06.11.2019 | MC | 06.11.2019 | MK | 06.11.2019 | MT | 06.11.2019 | NL | 06.11.2019 | PL | 06.11.2019 | RO | 06.11.2019 | RS | 06.11.2019 | SE | 06.11.2019 | SI | 06.11.2019 | SK | 06.11.2019 | SM | 06.11.2019 | TR | 06.11.2019 | BG | 06.02.2020 | NO | 06.02.2020 | GR | 07.02.2020 | IS | 06.03.2020 | PT | 06.03.2020 | IE | 09.04.2020 | LU | 09.04.2020 | BE | 30.04.2020 | CH | 30.04.2020 | FR | 30.04.2020 | LI | 30.04.2020 | [2022/32] |
Former [2022/27] | HU | 09.04.2014 | |
AL | 06.11.2019 | ||
AT | 06.11.2019 | ||
CY | 06.11.2019 | ||
CZ | 06.11.2019 | ||
DK | 06.11.2019 | ||
EE | 06.11.2019 | ||
ES | 06.11.2019 | ||
FI | 06.11.2019 | ||
HR | 06.11.2019 | ||
IT | 06.11.2019 | ||
LT | 06.11.2019 | ||
LV | 06.11.2019 | ||
MC | 06.11.2019 | ||
MT | 06.11.2019 | ||
NL | 06.11.2019 | ||
PL | 06.11.2019 | ||
RO | 06.11.2019 | ||
RS | 06.11.2019 | ||
SE | 06.11.2019 | ||
SI | 06.11.2019 | ||
SK | 06.11.2019 | ||
SM | 06.11.2019 | ||
TR | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
GR | 07.02.2020 | ||
IS | 06.03.2020 | ||
PT | 06.03.2020 | ||
IE | 09.04.2020 | ||
LU | 09.04.2020 | ||
BE | 30.04.2020 | ||
CH | 30.04.2020 | ||
FR | 30.04.2020 | ||
LI | 30.04.2020 | ||
Former [2021/20] | AL | 06.11.2019 | |
AT | 06.11.2019 | ||
CZ | 06.11.2019 | ||
DK | 06.11.2019 | ||
EE | 06.11.2019 | ||
ES | 06.11.2019 | ||
FI | 06.11.2019 | ||
HR | 06.11.2019 | ||
IT | 06.11.2019 | ||
LT | 06.11.2019 | ||
LV | 06.11.2019 | ||
MC | 06.11.2019 | ||
NL | 06.11.2019 | ||
PL | 06.11.2019 | ||
RO | 06.11.2019 | ||
RS | 06.11.2019 | ||
SE | 06.11.2019 | ||
SI | 06.11.2019 | ||
SK | 06.11.2019 | ||
SM | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
GR | 07.02.2020 | ||
IS | 06.03.2020 | ||
PT | 06.03.2020 | ||
IE | 09.04.2020 | ||
LU | 09.04.2020 | ||
BE | 30.04.2020 | ||
CH | 30.04.2020 | ||
FR | 30.04.2020 | ||
LI | 30.04.2020 | ||
Former [2021/10] | AL | 06.11.2019 | |
AT | 06.11.2019 | ||
CZ | 06.11.2019 | ||
DK | 06.11.2019 | ||
EE | 06.11.2019 | ||
ES | 06.11.2019 | ||
FI | 06.11.2019 | ||
HR | 06.11.2019 | ||
IT | 06.11.2019 | ||
LT | 06.11.2019 | ||
LV | 06.11.2019 | ||
MC | 06.11.2019 | ||
NL | 06.11.2019 | ||
PL | 06.11.2019 | ||
RO | 06.11.2019 | ||
RS | 06.11.2019 | ||
SE | 06.11.2019 | ||
SI | 06.11.2019 | ||
SK | 06.11.2019 | ||
SM | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
GR | 07.02.2020 | ||
IS | 06.03.2020 | ||
PT | 06.03.2020 | ||
LU | 09.04.2020 | ||
BE | 30.04.2020 | ||
CH | 30.04.2020 | ||
FR | 30.04.2020 | ||
LI | 30.04.2020 | ||
Former [2021/08] | AL | 06.11.2019 | |
AT | 06.11.2019 | ||
CZ | 06.11.2019 | ||
DK | 06.11.2019 | ||
EE | 06.11.2019 | ||
ES | 06.11.2019 | ||
FI | 06.11.2019 | ||
HR | 06.11.2019 | ||
LT | 06.11.2019 | ||
LV | 06.11.2019 | ||
MC | 06.11.2019 | ||
NL | 06.11.2019 | ||
PL | 06.11.2019 | ||
RO | 06.11.2019 | ||
RS | 06.11.2019 | ||
SE | 06.11.2019 | ||
SI | 06.11.2019 | ||
SK | 06.11.2019 | ||
SM | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
GR | 07.02.2020 | ||
IS | 06.03.2020 | ||
PT | 06.03.2020 | ||
LU | 09.04.2020 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
Former [2021/07] | AL | 06.11.2019 | |
AT | 06.11.2019 | ||
CZ | 06.11.2019 | ||
DK | 06.11.2019 | ||
EE | 06.11.2019 | ||
ES | 06.11.2019 | ||
FI | 06.11.2019 | ||
HR | 06.11.2019 | ||
LT | 06.11.2019 | ||
LV | 06.11.2019 | ||
MC | 06.11.2019 | ||
NL | 06.11.2019 | ||
PL | 06.11.2019 | ||
RO | 06.11.2019 | ||
RS | 06.11.2019 | ||
SE | 06.11.2019 | ||
SI | 06.11.2019 | ||
SK | 06.11.2019 | ||
SM | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
GR | 07.02.2020 | ||
IS | 06.03.2020 | ||
PT | 06.03.2020 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
Former [2020/52] | AL | 06.11.2019 | |
AT | 06.11.2019 | ||
CZ | 06.11.2019 | ||
DK | 06.11.2019 | ||
EE | 06.11.2019 | ||
ES | 06.11.2019 | ||
FI | 06.11.2019 | ||
HR | 06.11.2019 | ||
LT | 06.11.2019 | ||
LV | 06.11.2019 | ||
MC | 06.11.2019 | ||
NL | 06.11.2019 | ||
PL | 06.11.2019 | ||
RO | 06.11.2019 | ||
RS | 06.11.2019 | ||
SE | 06.11.2019 | ||
SI | 06.11.2019 | ||
SK | 06.11.2019 | ||
SM | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
GR | 07.02.2020 | ||
IS | 06.03.2020 | ||
PT | 06.03.2020 | ||
Former [2020/51] | AL | 06.11.2019 | |
AT | 06.11.2019 | ||
CZ | 06.11.2019 | ||
DK | 06.11.2019 | ||
EE | 06.11.2019 | ||
ES | 06.11.2019 | ||
FI | 06.11.2019 | ||
HR | 06.11.2019 | ||
LT | 06.11.2019 | ||
LV | 06.11.2019 | ||
NL | 06.11.2019 | ||
PL | 06.11.2019 | ||
RO | 06.11.2019 | ||
RS | 06.11.2019 | ||
SE | 06.11.2019 | ||
SI | 06.11.2019 | ||
SK | 06.11.2019 | ||
SM | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
GR | 07.02.2020 | ||
IS | 06.03.2020 | ||
PT | 06.03.2020 | ||
Former [2020/37] | AL | 06.11.2019 | |
CZ | 06.11.2019 | ||
DK | 06.11.2019 | ||
EE | 06.11.2019 | ||
ES | 06.11.2019 | ||
FI | 06.11.2019 | ||
HR | 06.11.2019 | ||
LT | 06.11.2019 | ||
LV | 06.11.2019 | ||
NL | 06.11.2019 | ||
PL | 06.11.2019 | ||
RO | 06.11.2019 | ||
RS | 06.11.2019 | ||
SE | 06.11.2019 | ||
SK | 06.11.2019 | ||
SM | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
GR | 07.02.2020 | ||
IS | 06.03.2020 | ||
PT | 06.03.2020 | ||
Former [2020/36] | AL | 06.11.2019 | |
CZ | 06.11.2019 | ||
DK | 06.11.2019 | ||
EE | 06.11.2019 | ||
ES | 06.11.2019 | ||
FI | 06.11.2019 | ||
HR | 06.11.2019 | ||
LT | 06.11.2019 | ||
LV | 06.11.2019 | ||
NL | 06.11.2019 | ||
PL | 06.11.2019 | ||
RO | 06.11.2019 | ||
RS | 06.11.2019 | ||
SE | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
GR | 07.02.2020 | ||
IS | 06.03.2020 | ||
PT | 06.03.2020 | ||
Former [2020/35] | AL | 06.11.2019 | |
CZ | 06.11.2019 | ||
ES | 06.11.2019 | ||
FI | 06.11.2019 | ||
HR | 06.11.2019 | ||
LT | 06.11.2019 | ||
LV | 06.11.2019 | ||
NL | 06.11.2019 | ||
PL | 06.11.2019 | ||
RO | 06.11.2019 | ||
RS | 06.11.2019 | ||
SE | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
GR | 07.02.2020 | ||
IS | 06.03.2020 | ||
PT | 06.03.2020 | ||
Former [2020/34] | AL | 06.11.2019 | |
ES | 06.11.2019 | ||
FI | 06.11.2019 | ||
HR | 06.11.2019 | ||
LT | 06.11.2019 | ||
LV | 06.11.2019 | ||
NL | 06.11.2019 | ||
PL | 06.11.2019 | ||
RS | 06.11.2019 | ||
SE | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
GR | 07.02.2020 | ||
IS | 06.03.2020 | ||
PT | 06.03.2020 | ||
Former [2020/32] | AL | 06.11.2019 | |
FI | 06.11.2019 | ||
HR | 06.11.2019 | ||
LT | 06.11.2019 | ||
LV | 06.11.2019 | ||
NL | 06.11.2019 | ||
PL | 06.11.2019 | ||
RS | 06.11.2019 | ||
SE | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
GR | 07.02.2020 | ||
IS | 06.03.2020 | ||
PT | 06.03.2020 | ||
Former [2020/25] | FI | 06.11.2019 | |
HR | 06.11.2019 | ||
LT | 06.11.2019 | ||
LV | 06.11.2019 | ||
NL | 06.11.2019 | ||
PL | 06.11.2019 | ||
RS | 06.11.2019 | ||
SE | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
GR | 07.02.2020 | ||
IS | 06.03.2020 | ||
PT | 06.03.2020 | ||
Former [2020/24] | FI | 06.11.2019 | |
LT | 06.11.2019 | ||
LV | 06.11.2019 | ||
NL | 06.11.2019 | ||
PL | 06.11.2019 | ||
SE | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
GR | 07.02.2020 | ||
IS | 06.03.2020 | ||
PT | 06.03.2020 | ||
Former [2020/23] | FI | 06.11.2019 | |
LT | 06.11.2019 | ||
LV | 06.11.2019 | ||
NL | 06.11.2019 | ||
PL | 06.11.2019 | ||
SE | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
GR | 07.02.2020 | ||
PT | 06.03.2020 | ||
Former [2020/22] | FI | 06.11.2019 | |
LT | 06.11.2019 | ||
SE | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
PT | 06.03.2020 | ||
Former [2020/21] | NO | 06.02.2020 | Documents cited: | Search | [A]US2007008964 (ROSE LAURENCE [US], et al) [A] 1-8 * figures 1A-2,6A ** paragraphs [0042] - [0051] *; | [XI]EP2242215 (ALCATEL LUCENT [FR]) [X] 1-7 * figures 2a-2c,14-16 * * paragraphs [0084] - [0089] * [I] 8 | International search | [A]CN1842011 (HANGZHOU HUAWEI 3COM TECH [CN]); | [A]CN101001165 (DATANG MOBILE COMM EQUIP CO [CN]); | [Y]CN101047601 (HUAWEI TECH CO LTD [CN]); | [A]CN101068139 (ZHONGXING COMM CO LTD [CN]); | [A]CN101771570 (H3C TECHNOLOGIES CO LTD); | [Y]CN101917648 (ZTE CORP) |