| EP3062949 - A METHOD OF BRAZING A PLATE HEAT EXCHANGER USING SCREN PRINTED BRAZING MATERIAL [Right-click to bookmark this link] | |||
| Former [2016/36] | A METHOD OF BRAZING A PLATE HEAT EXCHANGER USING SCREEN PRINTED BRAZING MATERIAL; A PLATE HEAT EXCHANGER MANUFACTURED BY SUCH METHOD | ||
| [2018/28] | Status | Patent maintained as amended Status updated on 21.04.2023 Database last updated on 11.04.2026 | |
| Former | The patent has been granted Status updated on 26.10.2018 | ||
| Former | Grant of patent is intended Status updated on 21.06.2018 | ||
| Former | Examination is in progress Status updated on 07.07.2017 | Most recent event Tooltip | 21.04.2023 | Patent maintained (B2 publication) | published on 24.05.2023 [2023/21] | Applicant(s) | For all designated states SWEP International AB P.O. Box 105 261 22 Landskrona / SE | [2016/36] | Inventor(s) | 01 /
BORNEGÅRD, Niclas Bjersundsvägen 11 S-237 36 Bjärred / SE | [2016/36] | Representative(s) | Ström & Gulliksson AB P.O. Box 4188 203 13 Malmö / SE | [2023/21] |
| Former [2018/48] | Ström & Gulliksson AB P O Box 4188 203 13 Malmö / SE | ||
| Former [2016/36] | Ström & Gulliksson AB Studentgatan 1 P.O. Box 4188 203 13 Malmö / SE | Application number, filing date | 14790060.9 | 24.10.2014 | [2016/36] | WO2014EP72904 | Priority number, date | SE20130051284 | 29.10.2013 Original published format: SE 1351284 | [2016/36] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015062992 | Date: | 07.05.2015 | Language: | EN | [2015/18] | Type: | A1 Application with search report | No.: | EP3062949 | Date: | 07.09.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 07.05.2015 takes the place of the publication of the European patent application. | [2016/36] | Type: | B1 Patent specification | No.: | EP3062949 | Date: | 28.11.2018 | Language: | EN | [2018/48] | Type: | B2 New European patent specification | No.: | EP3062949 | Date: | 24.05.2023 | Language: | EN | [2023/21] | Search report(s) | International search report - published on: | EP | 07.05.2015 | Classification | IPC: | B23K1/00, F28F3/04, F28F3/08 | [2016/36] | CPC: |
B23K1/0012 (EP,KR,SE,US);
B23K1/0008 (SE);
B23K1/008 (US);
B23K1/19 (US);
F28D9/005 (EP,KR,US);
F28F21/083 (US);
F28F3/00 (SE);
F28F3/046 (EP,KR,US);
F28F3/08 (EP,KR,US);
F28F3/086 (US);
B23K2101/14 (EP,US);
F28F2275/04 (KR);
F28F2275/045 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/36] | Title | German: | VERFAHREN ZUM LÖTEN EINES PLATTENWÄRMETAUSCHERS ANHAND EINES MITTELS SIEBDRUCK HERGESTELLTEN LÖTMATERIALS | [2018/28] | English: | A METHOD OF BRAZING A PLATE HEAT EXCHANGER USING SCREN PRINTED BRAZING MATERIAL | [2018/28] | French: | PROCÉDÉ DE BRASAGE D'ÉCHANGEUR DE CHALEUR À PLAQUES AU MOYEN D'UN MATÉRIAU À BRASER DÉPOSÉ PAR SÉRIGRAPHIE | [2018/28] |
| Former [2016/36] | VERFAHREN ZUM LÖTEN EINES PLATTENWÄRMETAUSCHERS ANHAND EINES MITTELS SIEBDRUCK HERGESTELLTEN LÖTMATERIALS, MIT DIESEM VERFAHREN HERGESTELLTER PLATTENWÄRMETAUSCHER | ||
| Former [2016/36] | A METHOD OF BRAZING A PLATE HEAT EXCHANGER USING SCREEN PRINTED BRAZING MATERIAL; A PLATE HEAT EXCHANGER MANUFACTURED BY SUCH METHOD | ||
| Former [2016/36] | PROCÉDÉ DE BRASAGE D'ÉCHANGEUR DE CHALEUR À PLAQUES AU MOYEN D'UN MATÉRIAU À BRASER DÉPOSÉ PAR SÉRIGRAPHIE ET ÉCHANGEUR DE CHALEUR À PLAQUES FABRIQUÉ AU MOYEN DU PROCÉDÉ | Entry into regional phase | 19.04.2016 | National basic fee paid | 19.04.2016 | Designation fee(s) paid | 19.04.2016 | Examination fee paid | Examination procedure | 19.04.2016 | Examination requested [2016/36] | 28.10.2016 | Amendment by applicant (claims and/or description) | 11.07.2017 | Despatch of a communication from the examining division (Time limit: M06) | 22.01.2018 | Reply to a communication from the examining division | 22.06.2018 | Communication of intention to grant the patent | 22.10.2018 | Fee for grant paid | 22.10.2018 | Fee for publishing/printing paid | 22.10.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | EP18208480.6 Application deemed to be withdrawn : 28.05.2019 | Opposition(s) | Opponent(s) | 01
16.08.2019
21.08.2019
ADMISSIBLE Alfa Laval Corporate AB P.B. Box 73 221 00 Lund / SE Opponent's representative Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2019/39] | 11.09.2019 | Invitation to proprietor to file observations on the notice of opposition | 16.01.2020 | Reply of patent proprietor to notice(s) of opposition | 23.02.2021 | Date of oral proceedings | 25.05.2021 | Despatch of interlocutory decision in opposition | 25.05.2021 | Despatch of minutes of oral proceedings | 21.11.2022 | Legal effect of interlocutory decision in opposition | 31.01.2023 | Despatch of communication that the patent will be maintained as amended | 18.04.2023 | Fee for printing new specification paid | Appeal following opposition | 30.07.2021 | Appeal received No. T1386/21 | 30.07.2021 | Payment of appeal fee | 04.10.2021 | Statement of grounds filed | 21.11.2022 | Result of appeal procedure: appeal of the opponent was rejected | 12.01.2023 | Despatch of the decision of the Board of Appeal | 21.11.2022 | Date of oral proceedings | Fees paid | Renewal fee | 11.10.2016 | Renewal fee patent year 03 | 09.10.2017 | Renewal fee patent year 04 | 09.10.2018 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.10.2014 | AL | 28.11.2018 | AT | 28.11.2018 | CY | 28.11.2018 | CZ | 28.11.2018 | DK | 28.11.2018 | EE | 28.11.2018 | ES | 28.11.2018 | FI | 28.11.2018 | HR | 28.11.2018 | LT | 28.11.2018 | LV | 28.11.2018 | MC | 28.11.2018 | MK | 28.11.2018 | MT | 28.11.2018 | NL | 28.11.2018 | PL | 28.11.2018 | RO | 28.11.2018 | RS | 28.11.2018 | SK | 28.11.2018 | SM | 28.11.2018 | BG | 28.02.2019 | NO | 28.02.2019 | GR | 01.03.2019 | IS | 28.03.2019 | PT | 28.03.2019 | IE | 24.10.2019 | LU | 24.10.2019 | BE | 31.10.2019 | CH | 31.10.2019 | LI | 31.10.2019 | [2022/31] |
| Former [2021/34] | HU | 24.10.2014 | |
| AL | 28.11.2018 | ||
| AT | 28.11.2018 | ||
| CY | 28.11.2018 | ||
| CZ | 28.11.2018 | ||
| DK | 28.11.2018 | ||
| EE | 28.11.2018 | ||
| ES | 28.11.2018 | ||
| FI | 28.11.2018 | ||
| HR | 28.11.2018 | ||
| LT | 28.11.2018 | ||
| LV | 28.11.2018 | ||
| MC | 28.11.2018 | ||
| MT | 28.11.2018 | ||
| NL | 28.11.2018 | ||
| PL | 28.11.2018 | ||
| RO | 28.11.2018 | ||
| RS | 28.11.2018 | ||
| SK | 28.11.2018 | ||
| SM | 28.11.2018 | ||
| BG | 28.02.2019 | ||
| NO | 28.02.2019 | ||
| GR | 01.03.2019 | ||
| IS | 28.03.2019 | ||
| PT | 28.03.2019 | ||
| IE | 24.10.2019 | ||
| LU | 24.10.2019 | ||
| BE | 31.10.2019 | ||
| CH | 31.10.2019 | ||
| LI | 31.10.2019 | ||
| Former [2021/32] | HU | 24.10.2014 | |
| AL | 28.11.2018 | ||
| AT | 28.11.2018 | ||
| CY | 28.11.2018 | ||
| CZ | 28.11.2018 | ||
| DK | 28.11.2018 | ||
| EE | 28.11.2018 | ||
| ES | 28.11.2018 | ||
| FI | 28.11.2018 | ||
| HR | 28.11.2018 | ||
| LT | 28.11.2018 | ||
| LV | 28.11.2018 | ||
| MC | 28.11.2018 | ||
| NL | 28.11.2018 | ||
| PL | 28.11.2018 | ||
| RO | 28.11.2018 | ||
| RS | 28.11.2018 | ||
| SK | 28.11.2018 | ||
| SM | 28.11.2018 | ||
| BG | 28.02.2019 | ||
| NO | 28.02.2019 | ||
| GR | 01.03.2019 | ||
| IS | 28.03.2019 | ||
| PT | 28.03.2019 | ||
| IE | 24.10.2019 | ||
| LU | 24.10.2019 | ||
| BE | 31.10.2019 | ||
| CH | 31.10.2019 | ||
| LI | 31.10.2019 | ||
| Former [2021/26] | AL | 28.11.2018 | |
| AT | 28.11.2018 | ||
| CY | 28.11.2018 | ||
| CZ | 28.11.2018 | ||
| DK | 28.11.2018 | ||
| EE | 28.11.2018 | ||
| ES | 28.11.2018 | ||
| FI | 28.11.2018 | ||
| HR | 28.11.2018 | ||
| LT | 28.11.2018 | ||
| LV | 28.11.2018 | ||
| MC | 28.11.2018 | ||
| NL | 28.11.2018 | ||
| PL | 28.11.2018 | ||
| RO | 28.11.2018 | ||
| RS | 28.11.2018 | ||
| SK | 28.11.2018 | ||
| SM | 28.11.2018 | ||
| BG | 28.02.2019 | ||
| NO | 28.02.2019 | ||
| GR | 01.03.2019 | ||
| IS | 28.03.2019 | ||
| PT | 28.03.2019 | ||
| IE | 24.10.2019 | ||
| LU | 24.10.2019 | ||
| BE | 31.10.2019 | ||
| CH | 31.10.2019 | ||
| LI | 31.10.2019 | ||
| Former [2020/46] | AL | 28.11.2018 | |
| AT | 28.11.2018 | ||
| CZ | 28.11.2018 | ||
| DK | 28.11.2018 | ||
| EE | 28.11.2018 | ||
| ES | 28.11.2018 | ||
| FI | 28.11.2018 | ||
| HR | 28.11.2018 | ||
| LT | 28.11.2018 | ||
| LV | 28.11.2018 | ||
| MC | 28.11.2018 | ||
| NL | 28.11.2018 | ||
| PL | 28.11.2018 | ||
| RO | 28.11.2018 | ||
| RS | 28.11.2018 | ||
| SK | 28.11.2018 | ||
| SM | 28.11.2018 | ||
| BG | 28.02.2019 | ||
| NO | 28.02.2019 | ||
| GR | 01.03.2019 | ||
| IS | 28.03.2019 | ||
| PT | 28.03.2019 | ||
| IE | 24.10.2019 | ||
| LU | 24.10.2019 | ||
| BE | 31.10.2019 | ||
| CH | 31.10.2019 | ||
| LI | 31.10.2019 | ||
| Former [2020/38] | AL | 28.11.2018 | |
| AT | 28.11.2018 | ||
| CZ | 28.11.2018 | ||
| DK | 28.11.2018 | ||
| EE | 28.11.2018 | ||
| ES | 28.11.2018 | ||
| FI | 28.11.2018 | ||
| HR | 28.11.2018 | ||
| LT | 28.11.2018 | ||
| LV | 28.11.2018 | ||
| MC | 28.11.2018 | ||
| NL | 28.11.2018 | ||
| PL | 28.11.2018 | ||
| RO | 28.11.2018 | ||
| RS | 28.11.2018 | ||
| SK | 28.11.2018 | ||
| SM | 28.11.2018 | ||
| BG | 28.02.2019 | ||
| NO | 28.02.2019 | ||
| GR | 01.03.2019 | ||
| IS | 28.03.2019 | ||
| PT | 28.03.2019 | ||
| LU | 24.10.2019 | ||
| BE | 31.10.2019 | ||
| CH | 31.10.2019 | ||
| LI | 31.10.2019 | ||
| Former [2020/35] | AL | 28.11.2018 | |
| AT | 28.11.2018 | ||
| CZ | 28.11.2018 | ||
| DK | 28.11.2018 | ||
| EE | 28.11.2018 | ||
| ES | 28.11.2018 | ||
| FI | 28.11.2018 | ||
| HR | 28.11.2018 | ||
| LT | 28.11.2018 | ||
| LV | 28.11.2018 | ||
| MC | 28.11.2018 | ||
| NL | 28.11.2018 | ||
| PL | 28.11.2018 | ||
| RO | 28.11.2018 | ||
| RS | 28.11.2018 | ||
| SK | 28.11.2018 | ||
| SM | 28.11.2018 | ||
| BG | 28.02.2019 | ||
| NO | 28.02.2019 | ||
| GR | 01.03.2019 | ||
| IS | 28.03.2019 | ||
| PT | 28.03.2019 | ||
| LU | 24.10.2019 | ||
| CH | 31.10.2019 | ||
| LI | 31.10.2019 | ||
| Former [2020/34] | AL | 28.11.2018 | |
| AT | 28.11.2018 | ||
| CZ | 28.11.2018 | ||
| DK | 28.11.2018 | ||
| EE | 28.11.2018 | ||
| ES | 28.11.2018 | ||
| FI | 28.11.2018 | ||
| HR | 28.11.2018 | ||
| LT | 28.11.2018 | ||
| LV | 28.11.2018 | ||
| MC | 28.11.2018 | ||
| NL | 28.11.2018 | ||
| PL | 28.11.2018 | ||
| RO | 28.11.2018 | ||
| RS | 28.11.2018 | ||
| SK | 28.11.2018 | ||
| SM | 28.11.2018 | ||
| BG | 28.02.2019 | ||
| NO | 28.02.2019 | ||
| GR | 01.03.2019 | ||
| IS | 28.03.2019 | ||
| PT | 28.03.2019 | ||
| CH | 31.10.2019 | ||
| LI | 31.10.2019 | ||
| Former [2020/29] | AL | 28.11.2018 | |
| AT | 28.11.2018 | ||
| CZ | 28.11.2018 | ||
| DK | 28.11.2018 | ||
| EE | 28.11.2018 | ||
| ES | 28.11.2018 | ||
| FI | 28.11.2018 | ||
| HR | 28.11.2018 | ||
| LT | 28.11.2018 | ||
| LV | 28.11.2018 | ||
| MC | 28.11.2018 | ||
| NL | 28.11.2018 | ||
| PL | 28.11.2018 | ||
| RO | 28.11.2018 | ||
| RS | 28.11.2018 | ||
| SK | 28.11.2018 | ||
| SM | 28.11.2018 | ||
| BG | 28.02.2019 | ||
| NO | 28.02.2019 | ||
| GR | 01.03.2019 | ||
| IS | 28.03.2019 | ||
| PT | 28.03.2019 | ||
| Former [2019/40] | AL | 28.11.2018 | |
| AT | 28.11.2018 | ||
| CZ | 28.11.2018 | ||
| DK | 28.11.2018 | ||
| EE | 28.11.2018 | ||
| ES | 28.11.2018 | ||
| FI | 28.11.2018 | ||
| HR | 28.11.2018 | ||
| LT | 28.11.2018 | ||
| LV | 28.11.2018 | ||
| NL | 28.11.2018 | ||
| PL | 28.11.2018 | ||
| RO | 28.11.2018 | ||
| RS | 28.11.2018 | ||
| SK | 28.11.2018 | ||
| SM | 28.11.2018 | ||
| BG | 28.02.2019 | ||
| NO | 28.02.2019 | ||
| GR | 01.03.2019 | ||
| IS | 28.03.2019 | ||
| PT | 28.03.2019 | ||
| Former [2019/37] | AL | 28.11.2018 | |
| AT | 28.11.2018 | ||
| CZ | 28.11.2018 | ||
| DK | 28.11.2018 | ||
| EE | 28.11.2018 | ||
| ES | 28.11.2018 | ||
| FI | 28.11.2018 | ||
| HR | 28.11.2018 | ||
| LT | 28.11.2018 | ||
| LV | 28.11.2018 | ||
| NL | 28.11.2018 | ||
| PL | 28.11.2018 | ||
| RO | 28.11.2018 | ||
| RS | 28.11.2018 | ||
| SM | 28.11.2018 | ||
| BG | 28.02.2019 | ||
| NO | 28.02.2019 | ||
| GR | 01.03.2019 | ||
| IS | 28.03.2019 | ||
| PT | 28.03.2019 | ||
| Former [2019/35] | AL | 28.11.2018 | |
| AT | 28.11.2018 | ||
| CZ | 28.11.2018 | ||
| DK | 28.11.2018 | ||
| ES | 28.11.2018 | ||
| FI | 28.11.2018 | ||
| HR | 28.11.2018 | ||
| LT | 28.11.2018 | ||
| LV | 28.11.2018 | ||
| NL | 28.11.2018 | ||
| PL | 28.11.2018 | ||
| RS | 28.11.2018 | ||
| BG | 28.02.2019 | ||
| NO | 28.02.2019 | ||
| GR | 01.03.2019 | ||
| IS | 28.03.2019 | ||
| PT | 28.03.2019 | ||
| Former [2019/34] | AL | 28.11.2018 | |
| AT | 28.11.2018 | ||
| DK | 28.11.2018 | ||
| ES | 28.11.2018 | ||
| FI | 28.11.2018 | ||
| HR | 28.11.2018 | ||
| LT | 28.11.2018 | ||
| LV | 28.11.2018 | ||
| NL | 28.11.2018 | ||
| RS | 28.11.2018 | ||
| BG | 28.02.2019 | ||
| NO | 28.02.2019 | ||
| GR | 01.03.2019 | ||
| IS | 28.03.2019 | ||
| PT | 28.03.2019 | ||
| Former [2019/30] | AL | 28.11.2018 | |
| AT | 28.11.2018 | ||
| ES | 28.11.2018 | ||
| FI | 28.11.2018 | ||
| HR | 28.11.2018 | ||
| LT | 28.11.2018 | ||
| LV | 28.11.2018 | ||
| NL | 28.11.2018 | ||
| RS | 28.11.2018 | ||
| BG | 28.02.2019 | ||
| NO | 28.02.2019 | ||
| GR | 01.03.2019 | ||
| IS | 28.03.2019 | ||
| PT | 28.03.2019 | ||
| Former [2019/26] | AL | 28.11.2018 | |
| AT | 28.11.2018 | ||
| ES | 28.11.2018 | ||
| FI | 28.11.2018 | ||
| HR | 28.11.2018 | ||
| LT | 28.11.2018 | ||
| LV | 28.11.2018 | ||
| RS | 28.11.2018 | ||
| BG | 28.02.2019 | ||
| NO | 28.02.2019 | ||
| GR | 01.03.2019 | ||
| IS | 28.03.2019 | ||
| PT | 28.03.2019 | ||
| Former [2019/25] | AT | 28.11.2018 | |
| ES | 28.11.2018 | ||
| FI | 28.11.2018 | ||
| HR | 28.11.2018 | ||
| LT | 28.11.2018 | ||
| LV | 28.11.2018 | ||
| RS | 28.11.2018 | ||
| BG | 28.02.2019 | ||
| NO | 28.02.2019 | ||
| GR | 01.03.2019 | ||
| IS | 28.03.2019 | ||
| Former [2019/24] | AT | 28.11.2018 | |
| ES | 28.11.2018 | ||
| FI | 28.11.2018 | ||
| HR | 28.11.2018 | ||
| LT | 28.11.2018 | ||
| LV | 28.11.2018 | ||
| BG | 28.02.2019 | ||
| NO | 28.02.2019 | ||
| GR | 01.03.2019 | ||
| IS | 28.03.2019 | ||
| Former [2019/23] | AT | 28.11.2018 | |
| ES | 28.11.2018 | ||
| FI | 28.11.2018 | ||
| HR | 28.11.2018 | ||
| LT | 28.11.2018 | ||
| LV | 28.11.2018 | ||
| BG | 28.02.2019 | ||
| NO | 28.02.2019 | ||
| IS | 28.03.2019 | ||
| Former [2019/22] | FI | 28.11.2018 | |
| LT | 28.11.2018 | ||
| BG | 28.02.2019 | ||
| NO | 28.02.2019 | ||
| IS | 28.03.2019 | ||
| Former [2019/21] | FI | 28.11.2018 | |
| LT | 28.11.2018 | ||
| NO | 28.02.2019 | ||
| IS | 28.03.2019 | ||
| Former [2019/20] | LT | 28.11.2018 | |
| NO | 28.02.2019 | Cited in | International search | [XA] JPH09178384 (TOYO RADIATOR CO LTD et al.) [X] 14 * abstract *[A] 1-13 | [XY] US2004181941 (JOHANNES RASSMUS JENS ERIK et al.) [X] 14 * paragraphs [0022] , [0024]; figure - *[Y] 1-13 | [Y] US5223691 (FREI JOHN K et al.) [Y] 1-13 * column 2, lines 5-16 * * column 4, lines 26-40; figure - * | [A] US2010140227 (BERGES DAMIEN et al.) [A] 1-13 * paragraph [0046]; figure - * | Examination | JP2000337789 | by applicant | US7685716 | US2010258288 | Opposition | JPH09178384 | US2004181941 | US5223691 | US2010140227 | US7451908 | US4606495 | JP2000337789 | US2008190595 | SE529913 | US4606495 |