EP3119480 - ADJUSTABLE DUMBBELL SYSTEM HAVING A WEIGHT SENSOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.03.2022 Database last updated on 31.05.2024 | |
Former | The patent has been granted Status updated on 16.04.2021 | ||
Former | Grant of patent is intended Status updated on 15.12.2020 | ||
Former | Examination is in progress Status updated on 10.08.2018 | ||
Former | Request for examination was made Status updated on 23.12.2016 | ||
Former | The international publication has been made Status updated on 02.12.2016 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Nautilus, Inc. 17750 SE 6th Way Vancouver, WA 98683 / US | [2017/04] | Inventor(s) | 01 /
MORAN, Thomas H. 2833 NE 13th Avenue Portland, Oregon 97212 / US | 02 /
PETERSEN, Jason Pharis P.O. Box 1093 Ridgefield, Washington 98642 / US | 03 /
MARJAMA, Marcus L. PO Box 872696 Vancouver, Washington 98687 / US | 04 /
ANDERSON, Todd D. 22800 NE 113th Street Vancouver, Washington 98682 / US | 05 /
CRABB, Peter L. 9308 NE 27th Avenue Vancouver, WA 98665 / US | 06 /
WOOLDRIDGE, Glen A. 14618 SE 8th Street Vancouver, WA 98683 / US | 07 /
BUSH, PJ M. 5607 NE 45th Avenue Vancouver, Washington 98661 / US | [2017/04] | Representative(s) | Miller, James Lionel Woolverton, et al Kilburn & Strode LLP Lacon London 84 Theobalds Road London WC1X 8NL / GB | [2021/20] |
Former [2017/04] | Miller, James Lionel Woolverton, et al Kilburn & Strode LLP 20 Red Lion Street London WC1R 4PJ / GB | Application number, filing date | 14793356.8 | 03.10.2014 | [2017/04] | WO2014US59189 | Priority number, date | US201414311228 | 20.06.2014 Original published format: US201414311228 | [2017/04] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015195154 | Date: | 23.12.2015 | Language: | EN | [2015/51] | Type: | A1 Application with search report | No.: | EP3119480 | Date: | 25.01.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 23.12.2015 takes the place of the publication of the European patent application. | [2017/04] | Type: | B1 Patent specification | No.: | EP3119480 | Date: | 19.05.2021 | Language: | EN | [2021/20] | Search report(s) | International search report - published on: | EP | 23.12.2015 | Classification | IPC: | A63B21/072, A63B21/075, A63B71/00, A63B71/06, A63B24/00 | [2017/04] | CPC: |
A63B21/075 (EP,US);
A63B21/063 (US);
A63B21/0724 (EP,US);
A63B21/0726 (EP,US);
A63B21/0728 (US);
A63B24/0087 (EP,US);
A63B71/0036 (EP,US);
A63B71/0619 (EP,US);
A63B2071/068 (EP,US);
A63B21/00065 (US);
A63B2209/08 (EP,US);
A63B2220/13 (EP,US);
A63B2220/16 (EP,US);
A63B2220/40 (EP,US);
A63B2220/52 (EP,US);
A63B2220/803 (EP,US);
A63B2220/89 (EP,US);
A63B2225/20 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/04] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | EINSTELLBARES HANTELSYSTEM MIT GEWICHTSSENSOR | [2017/04] | English: | ADJUSTABLE DUMBBELL SYSTEM HAVING A WEIGHT SENSOR | [2017/04] | French: | SYSTÈME D'HALTÈRE RÉGLABLE POSSÉDANT UN CAPTEUR DE POIDS | [2017/04] | Entry into regional phase | 21.10.2016 | National basic fee paid | 21.10.2016 | Designation fee(s) paid | 21.10.2016 | Examination fee paid | Examination procedure | 21.10.2016 | Examination requested [2017/04] | 21.10.2016 | Date on which the examining division has become responsible | 16.06.2017 | Amendment by applicant (claims and/or description) | 14.08.2018 | Despatch of a communication from the examining division (Time limit: M04) | 27.11.2018 | Reply to a communication from the examining division | 16.12.2020 | Communication of intention to grant the patent | 13.04.2021 | Fee for grant paid | 13.04.2021 | Fee for publishing/printing paid | 13.04.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 22.02.2022 | No opposition filed within time limit [2022/17] | Fees paid | Renewal fee | 25.10.2016 | Renewal fee patent year 03 | 11.10.2017 | Renewal fee patent year 04 | 11.10.2018 | Renewal fee patent year 05 | 15.10.2019 | Renewal fee patent year 06 | 14.10.2020 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.10.2014 | AL | 19.05.2021 | AT | 19.05.2021 | CY | 19.05.2021 | CZ | 19.05.2021 | DK | 19.05.2021 | EE | 19.05.2021 | FI | 19.05.2021 | HR | 19.05.2021 | LT | 19.05.2021 | LV | 19.05.2021 | MC | 19.05.2021 | MK | 19.05.2021 | PL | 19.05.2021 | RO | 19.05.2021 | RS | 19.05.2021 | SE | 19.05.2021 | SI | 19.05.2021 | SK | 19.05.2021 | SM | 19.05.2021 | BG | 19.08.2021 | NO | 19.08.2021 | GR | 20.08.2021 | IS | 19.09.2021 | PT | 20.09.2021 | IE | 03.10.2021 | LU | 03.10.2021 | BE | 31.10.2021 | CH | 31.10.2021 | LI | 31.10.2021 | [2024/22] |
Former [2023/30] | HU | 03.10.2014 | |
AL | 19.05.2021 | ||
AT | 19.05.2021 | ||
CY | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
IE | 03.10.2021 | ||
LU | 03.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2023/29] | HU | 03.10.2014 | |
AL | 19.05.2021 | ||
AT | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
IE | 03.10.2021 | ||
LU | 03.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2022/48] | AL | 19.05.2021 | |
AT | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
IE | 03.10.2021 | ||
LU | 03.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2022/37] | AL | 19.05.2021 | |
AT | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
LU | 03.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2022/35] | AL | 19.05.2021 | |
AT | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
LU | 03.10.2021 | ||
BE | 31.10.2021 | ||
Former [2022/33] | AL | 19.05.2021 | |
AT | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
BE | 31.10.2021 | ||
Former [2022/29] | AL | 19.05.2021 | |
AT | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/26] | AL | 19.05.2021 | |
AT | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/23] | AT | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/10] | AT | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
PT | 20.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/08] | AT | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
PL | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/07] | AT | 19.05.2021 | |
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
PL | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2021/52] | AT | 19.05.2021 | |
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
PL | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2021/51] | AT | 19.05.2021 | |
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2021/50] | AT | 19.05.2021 | |
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
SE | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
PT | 20.09.2021 | ||
Former [2021/49] | AT | 19.05.2021 | |
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
SE | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
Former [2021/47] | AT | 19.05.2021 | |
FI | 19.05.2021 | ||
LT | 19.05.2021 | ||
BG | 19.08.2021 | ||
Former [2021/46] | AT | 19.05.2021 | |
FI | 19.05.2021 | ||
LT | 19.05.2021 | Cited in | International search | [A]US2002128127 (CHEN JAMES [TW]) [A] 1 * abstract *; | [XY]US7578771 (TOWLEY III CARL K [US], et al) [X] 16,26,27 * column 4 - column 11; figure - * [Y] 14; | [A]EP2586502 (WANG LEAO [TW]) [A] 1* abstract *; | [XY]US2013288859 (WATTERSON SCOTT R [US]) [X] 1 * page 3 - page 7; figure - * [Y] 14 |