EP3064015 - RADIO BASE STATION, WIRELESS TERMINAL, METHODS PERFORMED THEREIN, COMPUTER PROGRAM, AND COMPUTER-READABLE STORAGE MEDIUM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 16.10.2020 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 08.11.2019 | ||
Former | Grant of patent is intended Status updated on 22.09.2019 | ||
Former | Examination is in progress Status updated on 17.08.2019 | ||
Former | Grant of patent is intended Status updated on 27.06.2019 | ||
Former | Examination is in progress Status updated on 01.09.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [2016/36] | Inventor(s) | 01 /
SUSITAIVAL, Riikka Mannerheimintie 82 A 13 FIN-00250 Helsinki / FI | 02 /
WAGER, Stefan Övergårdsvägen 41 D FIN-02360 Espoo / FI | 03 /
WIEMANN, Henning Kelmesbergweg 7 DE-52080 Aachen / DE | [2016/36] | Representative(s) | Ericsson Patent Development Torshamnsgatan 21-23 164 80 Stockholm / SE | [2016/36] | Application number, filing date | 14795685.8 | 07.10.2014 | [2016/36] | WO2014SE51168 | Priority number, date | US201361898984P | 01.11.2013 Original published format: US 201361898984 P | [2016/36] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2015065265 | Date: | 07.05.2015 | Language: | EN | [2015/18] | Type: | A2 Application without search report | No.: | EP3064015 | Date: | 07.09.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 07.05.2015 takes the place of the publication of the European patent application. | [2016/36] | Type: | B1 Patent specification | No.: | EP3064015 | Date: | 11.12.2019 | Language: | EN | [2019/50] | Search report(s) | International search report - published on: | EP | 02.07.2015 | Classification | IPC: | H04W72/12, H04W28/02, // H04W36/00 | [2019/29] | CPC: |
H04W28/0278 (EP,US);
H04W72/21 (EP,US);
H04W24/02 (US);
H04W28/0263 (EP,US);
H04W88/06 (US);
H04W28/0273 (EP,US);
|
Former IPC [2016/36] | H04W72/12, H04W28/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/36] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | FUNKBASISSTATION, DRAHTLOSES ENDGERÄT, DARIN DURCHGEFÜHRTE VERFAHREN, COMPUTERPROGRAMM UND COMPUTERLESBARES SPEICHERMEDIUM | [2016/36] | English: | RADIO BASE STATION, WIRELESS TERMINAL, METHODS PERFORMED THEREIN, COMPUTER PROGRAM, AND COMPUTER-READABLE STORAGE MEDIUM | [2016/36] | French: | STATION DE BASE RADIO, TERMINAL SANS FIL, PROCÉDÉS CORRESPONDANTS, PROGRAMME INFORMATIQUE, ET SUPPORT DE STOCKAGE LISIBLE PAR ORDINATEUR | [2016/36] | Entry into regional phase | 22.03.2016 | National basic fee paid | 22.03.2016 | Designation fee(s) paid | 22.03.2016 | Examination fee paid | Examination procedure | 01.09.2015 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 22.03.2016 | Examination requested [2016/36] | 21.11.2016 | Amendment by applicant (claims and/or description) | 05.09.2017 | Despatch of a communication from the examining division (Time limit: M04) | 07.12.2017 | Reply to a communication from the examining division | 16.04.2018 | Despatch of a communication from the examining division (Time limit: M04) | 20.06.2018 | Reply to a communication from the examining division | 29.10.2018 | Despatch of a communication from the examining division (Time limit: M04) | 04.02.2019 | Reply to a communication from the examining division | 28.06.2019 | Communication of intention to grant the patent | 14.08.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 23.09.2019 | Communication of intention to grant the patent | 29.10.2019 | Fee for grant paid | 29.10.2019 | Fee for publishing/printing paid | 29.10.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 14.09.2020 | No opposition filed within time limit [2020/47] | Fees paid | Renewal fee | 27.10.2016 | Renewal fee patent year 03 | 27.10.2017 | Renewal fee patent year 04 | 29.10.2018 | Renewal fee patent year 05 | 28.10.2019 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.10.2014 | AL | 11.12.2019 | AT | 11.12.2019 | CY | 11.12.2019 | CZ | 11.12.2019 | DK | 11.12.2019 | EE | 11.12.2019 | ES | 11.12.2019 | FI | 11.12.2019 | HR | 11.12.2019 | IT | 11.12.2019 | LT | 11.12.2019 | LV | 11.12.2019 | MC | 11.12.2019 | MK | 11.12.2019 | MT | 11.12.2019 | NL | 11.12.2019 | PL | 11.12.2019 | RO | 11.12.2019 | RS | 11.12.2019 | SE | 11.12.2019 | SI | 11.12.2019 | SK | 11.12.2019 | SM | 11.12.2019 | TR | 11.12.2019 | BG | 11.03.2020 | NO | 11.03.2020 | GR | 12.03.2020 | IS | 11.04.2020 | PT | 06.05.2020 | [2022/32] |
Former [2022/27] | HU | 07.10.2014 | |
AL | 11.12.2019 | ||
AT | 11.12.2019 | ||
CY | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
MT | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
TR | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2021/31] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2021/10] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2020/51] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2020/47] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2020/40] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2020/37] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
PT | 06.05.2020 | ||
Former [2020/36] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
PT | 06.05.2020 | ||
Former [2020/35] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/34] | AL | 11.12.2019 | |
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/32] | AL | 11.12.2019 | |
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/25] | FI | 11.12.2019 | |
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/23] | FI | 11.12.2019 | |
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/22] | FI | 11.12.2019 | |
LT | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
Former [2020/21] | NO | 11.03.2020 | Cited in | International search | [X]CN103139918 (HUAWEI TECH CO LTD); | [P]EP2775773 (HUAWEI TECH CO LTD [CN]); |