EP3071349 - DEVICE FOR ATTACHING A JOINING ELEMENT TO A PORTION OF A COMPONENT [Right-click to bookmark this link] | |||
Former [2016/39] | DEVICE FOR ATTACHING A JOINING ELEMENT TO A PORTION OF A COMPONENT AND MOULD | ||
[2020/04] | Status | No opposition filed within time limit Status updated on 23.04.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 15.05.2020 | ||
Former | Grant of patent is intended Status updated on 21.01.2020 | ||
Former | Examination is in progress Status updated on 19.10.2018 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): BE | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Tox Pressotechnik GmbH & Co. KG Riedstrasse 4 88250 Weingarten / DE | [2016/39] | Inventor(s) | 01 /
BADENT, Michael Jaegerstrasse 2 88250 Weingarten / DE | [2016/39] | Representative(s) | Otten, Roth, Dobler & Partner mbB Patentanwälte Großtobeler Straße 39 88276 Berg / Ravensburg / DE | [2016/39] | Application number, filing date | 14796469.6 | 04.11.2014 | [2016/39] | WO2014EP73649 | Priority number, date | DE20131019518 | 22.11.2013 Original published format: DE102013019518 | [2016/39] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2015074861 | Date: | 28.05.2015 | Language: | DE | [2015/21] | Type: | A1 Application with search report | No.: | EP3071349 | Date: | 28.09.2016 | Language: | DE | The application published by WIPO in one of the EPO official languages on 28.05.2015 takes the place of the publication of the European patent application. | [2016/39] | Type: | B1 Patent specification | No.: | EP3071349 | Date: | 17.06.2020 | Language: | DE | [2020/25] | Search report(s) | International search report - published on: | EP | 28.05.2015 | Classification | IPC: | B21J15/02, B21J15/32 | [2016/39] | CPC: |
B21J15/32 (EP,US);
B21J15/025 (EP,US);
B23P19/006 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/39] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | WERKZEUG ZUM ANBRINGEN EINES FUEGEELEMENTS AN EINEM BAUTEILABSCHNITT | [2020/04] | English: | DEVICE FOR ATTACHING A JOINING ELEMENT TO A PORTION OF A COMPONENT | [2020/04] | French: | DISPOSITIF POUR POSER UN ÉLÉMENT DE FIXATION DANS UNE PIÈCE | [2020/04] |
Former [2016/39] | VORRICHTUNG ZUM ANBRINGEN EINES FUEGEELEMENTS AN EINEM BAUTEILABSCHNITT UND WERKZEUG | ||
Former [2016/39] | DEVICE FOR ATTACHING A JOINING ELEMENT TO A PORTION OF A COMPONENT AND MOULD | ||
Former [2016/39] | DISPOSITIF POUR METTRE EN PLACE UN ÉLÉMENT D'ASSEMBLAGE AU NIVEAU D'UNE PARTIE D'ÉLÉMENT STRUCTURAL ET OUTIL | Entry into regional phase | 12.04.2016 | National basic fee paid | 12.04.2016 | Designation fee(s) paid | 12.04.2016 | Examination fee paid | Examination procedure | 12.04.2016 | Examination requested [2016/39] | 21.12.2016 | Amendment by applicant (claims and/or description) | 18.10.2018 | Despatch of a communication from the examining division (Time limit: M06) | 16.04.2019 | Reply to a communication from the examining division | 01.10.2019 | Despatch of a communication from the examining division (Time limit: M02) | 10.12.2019 | Reply to a communication from the examining division | 22.01.2020 | Communication of intention to grant the patent | 12.05.2020 | Fee for grant paid | 12.05.2020 | Fee for publishing/printing paid | 12.05.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 18.03.2021 | No opposition filed within time limit [2021/21] | Fees paid | Renewal fee | 16.01.2017 | Renewal fee patent year 03 | 27.09.2017 | Renewal fee patent year 04 | 28.09.2018 | Renewal fee patent year 05 | 03.10.2019 | Renewal fee patent year 06 | Penalty fee | Additional fee for renewal fee | 30.11.2016 | 03   M06   Fee paid on   16.01.2017 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 04.11.2014 | AL | 17.06.2020 | CY | 17.06.2020 | CZ | 17.06.2020 | DK | 17.06.2020 | EE | 17.06.2020 | ES | 17.06.2020 | FI | 17.06.2020 | HR | 17.06.2020 | LT | 17.06.2020 | LV | 17.06.2020 | MC | 17.06.2020 | MK | 17.06.2020 | MT | 17.06.2020 | NL | 17.06.2020 | PL | 17.06.2020 | RO | 17.06.2020 | RS | 17.06.2020 | SE | 17.06.2020 | SI | 17.06.2020 | SK | 17.06.2020 | SM | 17.06.2020 | TR | 17.06.2020 | BG | 17.09.2020 | NO | 17.09.2020 | GR | 18.09.2020 | IS | 17.10.2020 | PT | 19.10.2020 | AT | 04.11.2020 | IE | 04.11.2020 | IT | 04.11.2020 | LU | 04.11.2020 | BE | 30.11.2020 | CH | 30.11.2020 | LI | 30.11.2020 | [2022/33] |
Former [2022/32] | HU | 04.11.2014 | |
AL | 17.06.2020 | ||
CY | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
MK | 17.06.2020 | ||
MT | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
TR | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
AT | 04.11.2020 | ||
IE | 04.11.2020 | ||
IT | 04.11.2020 | ||
LU | 04.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
Former [2022/27] | HU | 04.11.2014 | |
AL | 17.06.2020 | ||
CY | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
MT | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
TR | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
AT | 04.11.2020 | ||
IE | 04.11.2020 | ||
IT | 04.11.2020 | ||
LU | 04.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
Former [2022/23] | AL | 17.06.2020 | |
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
AT | 04.11.2020 | ||
IE | 04.11.2020 | ||
IT | 04.11.2020 | ||
LU | 04.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
Former [2022/08] | AL | 17.06.2020 | |
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
AT | 04.11.2020 | ||
IE | 04.11.2020 | ||
LU | 04.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
Former [2021/46] | AL | 17.06.2020 | |
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
IE | 04.11.2020 | ||
LU | 04.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
Former [2021/37] | AL | 17.06.2020 | |
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
LU | 04.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
Former [2021/33] | AL | 17.06.2020 | |
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
LU | 04.11.2020 | ||
Former [2021/31] | AL | 17.06.2020 | |
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/24] | AL | 17.06.2020 | |
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/21] | AL | 17.06.2020 | |
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/10] | AL | 17.06.2020 | |
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/09] | AL | 17.06.2020 | |
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
PT | 19.10.2020 | ||
Former [2021/04] | AL | 17.06.2020 | |
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2021/01] | FI | 17.06.2020 | |
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2020/51] | FI | 17.06.2020 | |
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2020/50] | FI | 17.06.2020 | |
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
SE | 17.06.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2020/48] | FI | 17.06.2020 | |
LT | 17.06.2020 | ||
SE | 17.06.2020 | ||
NO | 17.09.2020 | ||
Former [2020/47] | LT | 17.06.2020 | |
NO | 17.09.2020 | Cited in | International search | [XI]DE102004011846 (TOX PRESSOTECHNIK GMBH [DE]) [X] 1,2,4-8,11 * paragraphs [0001] , [0 17] - [0022]; figures 1-6 * [I] 3,9,10; | [X]US2012324690 (FAITEL WILLIAM M [US]) [X] 1* paragraphs [0037] - [0040]; figures 16-19 * | Examination | DE19746669 |