blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3074333

EP3074333 - TRAVERSING UNIT AND METHOD FOR CONTROLLING A TRAVERSING UNIT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  14.01.2022
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  05.02.2021
FormerGrant of patent is intended
Status updated on  13.10.2020
FormerExamination is in progress
Status updated on  05.06.2019
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024 [2024/41]
Applicant(s)For all designated states
Oerlikon Textile GmbH & Co. KG
Leverkuser Strasse 65
42897 Remscheid / DE
[2016/40]
Inventor(s)01 / RÜTER, Markus
Hukesteinstraße 10
45657 Recklinghausen / DE
 [2016/40]
Representative(s)Keenway Patentanwälte Neumann Heine Taruttis
PartG mbB
Postfach 10 33 63
40024 Düsseldorf / DE
[2021/10]
Former [2016/40]Neumann, Ditmar
KNH Patentanwälte Kahlhöfer Neumann
Rößler Heine PartG mbB
Postfach 10 33 63
40024 Düsseldorf / DE
Application number, filing date14802409.420.11.2014
[2016/40]
WO2014EP75142
Priority number, dateDE20131011319528.11.2013         Original published format: DE102013113195
DE2013102073510.12.2013         Original published format: DE102013020735
[2016/40]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2015078763
Date:04.06.2015
Language:DE
[2015/22]
Type: A1 Application with search report 
No.:EP3074333
Date:05.10.2016
Language:DE
The application published by WIPO in one of the EPO official languages on 04.06.2015 takes the place of the publication of the European patent application.
[2016/40]
Type: B1 Patent specification 
No.:EP3074333
Date:10.03.2021
Language:DE
[2021/10]
Search report(s)International search report - published on:EP04.06.2015
ClassificationIPC:B65H54/28
[2016/40]
CPC:
B65H54/2821 (EP); B65H54/2887 (EP); B65H2701/31 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/40]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:CHANGIEREINHEIT UND VERFAHREN ZUR STEUERUNG EINER CHANGIEREINHEIT[2016/40]
English:TRAVERSING UNIT AND METHOD FOR CONTROLLING A TRAVERSING UNIT[2016/40]
French:UNITÉ VA-ET-VIENT ET PROCÉDÉ DE COMMANDE D'UNE UNITÉ VA-ET-VIENT[2016/40]
Entry into regional phase24.06.2016National basic fee paid 
24.06.2016Designation fee(s) paid 
24.06.2016Examination fee paid 
Examination procedure24.06.2016Examination requested  [2016/40]
04.08.2016Amendment by applicant (claims and/or description)
11.06.2019Despatch of a communication from the examining division (Time limit: M04)
24.09.2019Reply to a communication from the examining division
26.03.2020Despatch of a communication from the examining division (Time limit: M04)
07.05.2020Reply to a communication from the examining division
31.07.2020Despatch of a communication from the examining division (Time limit: M04)
14.08.2020Reply to a communication from the examining division
14.10.2020Communication of intention to grant the patent
29.01.2021Fee for grant paid
29.01.2021Fee for publishing/printing paid
29.01.2021Receipt of the translation of the claim(s)
Opposition(s)13.12.2021No opposition filed within time limit [2022/07]
Fees paidRenewal fee
28.11.2016Renewal fee patent year 03
23.11.2017Renewal fee patent year 04
23.11.2018Renewal fee patent year 05
26.11.2019Renewal fee patent year 06
20.11.2020Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU20.11.2014
AL10.03.2021
CY10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
MK10.03.2021
MT10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
AT20.11.2021
GB20.11.2021
IE20.11.2021
LU20.11.2021
BE30.11.2021
FR30.11.2021
[2024/41]
Former [2024/22]HU20.11.2014
AL10.03.2021
CY10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
MK10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
AT20.11.2021
GB20.11.2021
IE20.11.2021
LU20.11.2021
BE30.11.2021
FR30.11.2021
Former [2023/30]HU20.11.2014
AL10.03.2021
CY10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
AT20.11.2021
GB20.11.2021
IE20.11.2021
LU20.11.2021
BE30.11.2021
FR30.11.2021
Former [2023/29]HU20.11.2014
AL10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
AT20.11.2021
GB20.11.2021
IE20.11.2021
LU20.11.2021
BE30.11.2021
FR30.11.2021
Former [2023/07]AL10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
AT20.11.2021
GB20.11.2021
IE20.11.2021
LU20.11.2021
BE30.11.2021
FR30.11.2021
Former [2023/01]AL10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
GB20.11.2021
IE20.11.2021
LU20.11.2021
BE30.11.2021
FR30.11.2021
Former [2022/48]AL10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
GB20.11.2021
IE20.11.2021
LU20.11.2021
BE30.11.2021
Former [2022/47]AL10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
GB20.11.2021
LU20.11.2021
BE30.11.2021
Former [2022/34]AL10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
LU20.11.2021
BE30.11.2021
Former [2022/33]AL10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
BE30.11.2021
Former [2022/23]AL10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2022/13]AL10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
PT12.07.2021
Former [2022/10]AL10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
PT12.07.2021
Former [2022/08]AL10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2022/07]AL10.03.2021
CZ10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2021/52]CZ10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2021/51]CZ10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2021/50]CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
PT12.07.2021
Former [2021/48]CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
RS10.03.2021
SE10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/46]FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
RS10.03.2021
SE10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/43]FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
RS10.03.2021
SE10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/38]FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
RS10.03.2021
SE10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/37]FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
RS10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/36]FI10.03.2021
HR10.03.2021
LT10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/35]FI10.03.2021
HR10.03.2021
LT10.03.2021
NO10.06.2021
Former [2021/33]FI10.03.2021
LT10.03.2021
NO10.06.2021
Cited inInternational search[Y]JPS59225354  (FANUC LTD) [Y] 1-5,7-11,13 * abstract *;
 [Y]EP0358989  (HITACHI LTD [JP]) [Y] 6,12 * page 5, lines 16-18,27-30; figure - *;
 [YD]WO9905055  (BARMAG BARMER MASCHF [DE], et al) [YD] 1-13 * page 9, lines 3-4 * * page 10, lines 15-18; figure - *;
 [AD]DE10322533  (MURATA MACHINERY LTD [JP]) [AD] 1-13* paragraphs [0026] , [0034]; figure - *
by applicantWO9905055
 DE10322533
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.