EP3071674 - TRANSFER DEVICE FOR GRANULAR MATERIAL AT REDUCED ENERGY CONSUMPTION [Right-click to bookmark this link] | |||
Former [2016/39] | DEVICE FOR TRANSFER OF GRANULAR MATERIAL WITH REDUCED ENERGY CONSUMPTION | ||
[2017/29] | Status | No opposition filed within time limit Status updated on 02.11.2018 Database last updated on 24.07.2024 | |
Former | The patent has been granted Status updated on 24.11.2017 | ||
Former | Grant of patent is intended Status updated on 18.07.2017 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states Commissariat à l'Énergie Atomique et aux Énergies Alternatives 25, Rue Leblanc Bâtiment "Le Ponant D" 75015 Paris / FR | [2016/39] | Inventor(s) | 01 /
GUYEZ PICARD, Estelle 36 b Rue du Drac F-38120 Saint Egreve / FR | 02 /
GROS D'AILLON, Luc-François 785 Chemin des Bourins F-38320 Brie et Angonnes / FR | [2016/39] | Representative(s) | Brevalex Tour Trinity 1 B Place de la Défense 92400 Courbevoie / FR | [N/P] |
Former [2016/39] | Brevalex 95, rue d'Amsterdam 75378 Paris Cedex 8 / FR | Application number, filing date | 14803087.7 | 21.11.2014 | [2016/39] | WO2014EP75240 | Priority number, date | FR20130061466 | 21.11.2013 Original published format: FR 1361466 | [2016/39] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2015075171 | Date: | 28.05.2015 | Language: | FR | [2015/21] | Type: | A1 Application with search report | No.: | EP3071674 | Date: | 28.09.2016 | Language: | FR | The application published by WIPO in one of the EPO official languages on 28.05.2015 takes the place of the publication of the European patent application. | [2016/39] | Type: | B1 Patent specification | No.: | EP3071674 | Date: | 27.12.2017 | Language: | FR | [2017/52] | Search report(s) | International search report - published on: | EP | 28.05.2015 | Classification | IPC: | C10J3/50, B65G53/26, B65G53/24, B65G53/12 | [2017/29] | CPC: |
C10J3/50 (EP);
B65G53/12 (EP);
C10J2200/156 (EP)
|
Former IPC [2016/39] | C10J3/50, B65G53/26, B65G53/24 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/39] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | TRANSPORTGERÄT FÜR KÖRNIGES MATERIAL MIT EIN GERINGERER ENERGIEVERBRAUCH | [2017/29] | English: | TRANSFER DEVICE FOR GRANULAR MATERIAL AT REDUCED ENERGY CONSUMPTION | [2017/29] | French: | DISPOSITIF DE TRANSFERT DE MATERIAU GRANULAIRE A CONSOMMATION D'ENERGIE REDUITE | [2016/39] |
Former [2016/39] | VORRICHTUNG ZUR ÜBERTRAGUNG VON KÖRNIGEM MATERIAL MIT VERRINGERTEM ENERGIEVERBRAUCH | ||
Former [2016/39] | DEVICE FOR TRANSFER OF GRANULAR MATERIAL WITH REDUCED ENERGY CONSUMPTION | Entry into regional phase | 24.05.2016 | National basic fee paid | 24.05.2016 | Designation fee(s) paid | 24.05.2016 | Examination fee paid | Examination procedure | 21.09.2015 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 24.05.2016 | Examination requested [2016/39] | 22.12.2016 | Amendment by applicant (claims and/or description) | 19.07.2017 | Communication of intention to grant the patent | 15.11.2017 | Fee for grant paid | 15.11.2017 | Fee for publishing/printing paid | 15.11.2017 | Receipt of the translation of the claim(s) | Opposition(s) | 28.09.2018 | No opposition filed within time limit [2018/49] | Fees paid | Renewal fee | 26.10.2016 | Renewal fee patent year 03 | 24.10.2017 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.11.2014 | AL | 27.12.2017 | AT | 27.12.2017 | CY | 27.12.2017 | CZ | 27.12.2017 | EE | 27.12.2017 | ES | 27.12.2017 | FI | 27.12.2017 | HR | 27.12.2017 | IT | 27.12.2017 | LT | 27.12.2017 | LV | 27.12.2017 | MC | 27.12.2017 | MK | 27.12.2017 | MT | 27.12.2017 | NL | 27.12.2017 | PL | 27.12.2017 | PT | 27.12.2017 | RO | 27.12.2017 | RS | 27.12.2017 | SI | 27.12.2017 | SK | 27.12.2017 | SM | 27.12.2017 | TR | 27.12.2017 | BG | 27.03.2018 | NO | 27.03.2018 | GR | 28.03.2018 | IS | 27.04.2018 | [2020/34] |
Former [2020/31] | HU | 21.11.2014 | |
AT | 27.12.2017 | ||
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
MK | 27.12.2017 | ||
MT | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
PT | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
TR | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2020/28] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
MT | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
PT | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
TR | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2020/16] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
MT | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
TR | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2019/33] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
MT | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2019/13] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MT | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/43] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MT | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/40] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/39] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/38] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/37] | CY | 27.12.2017 | |
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
Former [2018/34] | FI | 27.12.2017 | |
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
NL | 27.12.2017 | ||
RS | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
Former [2018/25] | FI | 27.12.2017 | |
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
RS | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
Former [2018/23] | FI | 27.12.2017 | |
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
RS | 27.12.2017 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
Former [2018/22] | FI | 27.12.2017 | |
LT | 27.12.2017 | ||
NO | 27.03.2018 | Cited in | International search | [A]EP0335071 (KRUPP KOPPERS GMBH [DE]) [A] 1-10* the whole document *; | [XI]US4877423 (DZIOBEK FRANK [DE], et al) [X] 1,3-5 * column 2, line 16 - column 2, line 33; figure 1 * [I] 2,6-10; | [XI]EP0497088 (KRUPP KOPPERS GMBH [DE]) [X] 1,3-5,7-9 * page 3, line 22 - page 3, line 56; figure 1 * [I] 2,6,10; | [A]US2011100274 (KUSKE EBERHARD [DE], et al) [A] 1-10 * the whole document *; | [XI]WO2012126939 (COMMISSARIAT ENERGIE ATOMIQUE [FR], et al) [X] 1,3-5 * page 14, line 16 - page 17, line 12; figure 1A * [I] 2,6-10 |