blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3071674

EP3071674 - TRANSFER DEVICE FOR GRANULAR MATERIAL AT REDUCED ENERGY CONSUMPTION [Right-click to bookmark this link]
Former [2016/39]DEVICE FOR TRANSFER OF GRANULAR MATERIAL WITH REDUCED ENERGY CONSUMPTION
[2017/29]
StatusNo opposition filed within time limit
Status updated on  02.11.2018
Database last updated on 24.07.2024
FormerThe patent has been granted
Status updated on  24.11.2017
FormerGrant of patent is intended
Status updated on  18.07.2017
Most recent event   Tooltip17.07.2020Lapse of the patent in a contracting state
New state(s): AL
published on 19.08.2020  [2020/34]
Applicant(s)For all designated states
Commissariat à l'Énergie Atomique et aux Énergies Alternatives
25, Rue Leblanc
Bâtiment "Le Ponant D"
75015 Paris / FR
[2016/39]
Inventor(s)01 / GUYEZ PICARD, Estelle
36 b Rue du Drac
F-38120 Saint Egreve / FR
02 / GROS D'AILLON, Luc-François
785 Chemin des Bourins
F-38320 Brie et Angonnes / FR
 [2016/39]
Representative(s)Brevalex
Tour Trinity
1 B Place de la Défense
92400 Courbevoie / FR
[N/P]
Former [2016/39]Brevalex
95, rue d'Amsterdam
75378 Paris Cedex 8 / FR
Application number, filing date14803087.721.11.2014
[2016/39]
WO2014EP75240
Priority number, dateFR2013006146621.11.2013         Original published format: FR 1361466
[2016/39]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report
No.:WO2015075171
Date:28.05.2015
Language:FR
[2015/21]
Type: A1 Application with search report 
No.:EP3071674
Date:28.09.2016
Language:FR
The application published by WIPO in one of the EPO official languages on 28.05.2015 takes the place of the publication of the European patent application.
[2016/39]
Type: B1 Patent specification 
No.:EP3071674
Date:27.12.2017
Language:FR
[2017/52]
Search report(s)International search report - published on:EP28.05.2015
ClassificationIPC:C10J3/50, B65G53/26, B65G53/24, B65G53/12
[2017/29]
CPC:
C10J3/50 (EP); B65G53/12 (EP); C10J2200/156 (EP)
Former IPC [2016/39]C10J3/50, B65G53/26, B65G53/24
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/39]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:TRANSPORTGERÄT FÜR KÖRNIGES MATERIAL MIT EIN GERINGERER ENERGIEVERBRAUCH[2017/29]
English:TRANSFER DEVICE FOR GRANULAR MATERIAL AT REDUCED ENERGY CONSUMPTION[2017/29]
French:DISPOSITIF DE TRANSFERT DE MATERIAU GRANULAIRE A CONSOMMATION D'ENERGIE REDUITE[2016/39]
Former [2016/39]VORRICHTUNG ZUR ÜBERTRAGUNG VON KÖRNIGEM MATERIAL MIT VERRINGERTEM ENERGIEVERBRAUCH
Former [2016/39]DEVICE FOR TRANSFER OF GRANULAR MATERIAL WITH REDUCED ENERGY CONSUMPTION
Entry into regional phase24.05.2016National basic fee paid 
24.05.2016Designation fee(s) paid 
24.05.2016Examination fee paid 
Examination procedure21.09.2015Request for preliminary examination filed
International Preliminary Examining Authority: EP
24.05.2016Examination requested  [2016/39]
22.12.2016Amendment by applicant (claims and/or description)
19.07.2017Communication of intention to grant the patent
15.11.2017Fee for grant paid
15.11.2017Fee for publishing/printing paid
15.11.2017Receipt of the translation of the claim(s)
Opposition(s)28.09.2018No opposition filed within time limit [2018/49]
Fees paidRenewal fee
26.10.2016Renewal fee patent year 03
24.10.2017Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU21.11.2014
AL27.12.2017
AT27.12.2017
CY27.12.2017
CZ27.12.2017
EE27.12.2017
ES27.12.2017
FI27.12.2017
HR27.12.2017
IT27.12.2017
LT27.12.2017
LV27.12.2017
MC27.12.2017
MK27.12.2017
MT27.12.2017
NL27.12.2017
PL27.12.2017
PT27.12.2017
RO27.12.2017
RS27.12.2017
SI27.12.2017
SK27.12.2017
SM27.12.2017
TR27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
IS27.04.2018
[2020/34]
Former [2020/31]HU21.11.2014
AT27.12.2017
CY27.12.2017
CZ27.12.2017
EE27.12.2017
ES27.12.2017
FI27.12.2017
HR27.12.2017
IT27.12.2017
LT27.12.2017
LV27.12.2017
MC27.12.2017
MK27.12.2017
MT27.12.2017
NL27.12.2017
PL27.12.2017
PT27.12.2017
RO27.12.2017
RS27.12.2017
SI27.12.2017
SK27.12.2017
SM27.12.2017
TR27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
IS27.04.2018
Former [2020/28]AT27.12.2017
CY27.12.2017
CZ27.12.2017
EE27.12.2017
ES27.12.2017
FI27.12.2017
HR27.12.2017
IT27.12.2017
LT27.12.2017
LV27.12.2017
MC27.12.2017
MT27.12.2017
NL27.12.2017
PL27.12.2017
PT27.12.2017
RO27.12.2017
RS27.12.2017
SI27.12.2017
SK27.12.2017
SM27.12.2017
TR27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
IS27.04.2018
Former [2020/16]AT27.12.2017
CY27.12.2017
CZ27.12.2017
EE27.12.2017
ES27.12.2017
FI27.12.2017
HR27.12.2017
IT27.12.2017
LT27.12.2017
LV27.12.2017
MC27.12.2017
MT27.12.2017
NL27.12.2017
PL27.12.2017
RO27.12.2017
RS27.12.2017
SI27.12.2017
SK27.12.2017
SM27.12.2017
TR27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
IS27.04.2018
Former [2019/33]AT27.12.2017
CY27.12.2017
CZ27.12.2017
EE27.12.2017
ES27.12.2017
FI27.12.2017
HR27.12.2017
IT27.12.2017
LT27.12.2017
LV27.12.2017
MC27.12.2017
MT27.12.2017
NL27.12.2017
PL27.12.2017
RO27.12.2017
RS27.12.2017
SI27.12.2017
SK27.12.2017
SM27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
IS27.04.2018
Former [2019/13]AT27.12.2017
CY27.12.2017
CZ27.12.2017
EE27.12.2017
ES27.12.2017
FI27.12.2017
HR27.12.2017
IT27.12.2017
LT27.12.2017
LV27.12.2017
MT27.12.2017
NL27.12.2017
PL27.12.2017
RO27.12.2017
RS27.12.2017
SI27.12.2017
SK27.12.2017
SM27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
IS27.04.2018
Former [2018/43]AT27.12.2017
CY27.12.2017
CZ27.12.2017
EE27.12.2017
ES27.12.2017
FI27.12.2017
HR27.12.2017
IT27.12.2017
LT27.12.2017
LV27.12.2017
MT27.12.2017
NL27.12.2017
PL27.12.2017
RO27.12.2017
RS27.12.2017
SK27.12.2017
SM27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
IS27.04.2018
Former [2018/40]AT27.12.2017
CY27.12.2017
CZ27.12.2017
EE27.12.2017
ES27.12.2017
FI27.12.2017
HR27.12.2017
IT27.12.2017
LT27.12.2017
LV27.12.2017
NL27.12.2017
PL27.12.2017
RO27.12.2017
RS27.12.2017
SK27.12.2017
SM27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
IS27.04.2018
Former [2018/39]AT27.12.2017
CY27.12.2017
CZ27.12.2017
EE27.12.2017
ES27.12.2017
FI27.12.2017
HR27.12.2017
IT27.12.2017
LT27.12.2017
LV27.12.2017
NL27.12.2017
PL27.12.2017
RS27.12.2017
SK27.12.2017
SM27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
IS27.04.2018
Former [2018/38]AT27.12.2017
CY27.12.2017
CZ27.12.2017
EE27.12.2017
ES27.12.2017
FI27.12.2017
HR27.12.2017
LT27.12.2017
LV27.12.2017
NL27.12.2017
PL27.12.2017
RS27.12.2017
SK27.12.2017
SM27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
IS27.04.2018
Former [2018/37]CY27.12.2017
CZ27.12.2017
EE27.12.2017
ES27.12.2017
FI27.12.2017
HR27.12.2017
LT27.12.2017
LV27.12.2017
NL27.12.2017
PL27.12.2017
RS27.12.2017
SK27.12.2017
SM27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
Former [2018/34]FI27.12.2017
HR27.12.2017
LT27.12.2017
LV27.12.2017
NL27.12.2017
RS27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
Former [2018/25]FI27.12.2017
HR27.12.2017
LT27.12.2017
LV27.12.2017
RS27.12.2017
BG27.03.2018
NO27.03.2018
GR28.03.2018
Former [2018/23]FI27.12.2017
HR27.12.2017
LT27.12.2017
RS27.12.2017
NO27.03.2018
GR28.03.2018
Former [2018/22]FI27.12.2017
LT27.12.2017
NO27.03.2018
Cited inInternational search[A]EP0335071  (KRUPP KOPPERS GMBH [DE]) [A] 1-10* the whole document *;
 [XI]US4877423  (DZIOBEK FRANK [DE], et al) [X] 1,3-5 * column 2, line 16 - column 2, line 33; figure 1 * [I] 2,6-10;
 [XI]EP0497088  (KRUPP KOPPERS GMBH [DE]) [X] 1,3-5,7-9 * page 3, line 22 - page 3, line 56; figure 1 * [I] 2,6,10;
 [A]US2011100274  (KUSKE EBERHARD [DE], et al) [A] 1-10 * the whole document *;
 [XI]WO2012126939  (COMMISSARIAT ENERGIE ATOMIQUE [FR], et al) [X] 1,3-5 * page 14, line 16 - page 17, line 12; figure 1A * [I] 2,6-10
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.