blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3080374

EP3080374 - MECHANICAL ENERGY STORAGE DEVICE FOR A TURNING SASH [Right-click to bookmark this link]
Former [2016/42]MECHANICAL ENERGY STORAGE APPARATUS FOR A ROTATING SASH
[2017/24]
StatusNo opposition filed within time limit
Status updated on  31.08.2018
Database last updated on 05.10.2024
FormerThe patent has been granted
Status updated on  22.09.2017
FormerGrant of patent is intended
Status updated on  01.06.2017
Most recent event   Tooltip17.07.2020Lapse of the patent in a contracting state
New state(s): AL
published on 19.08.2020  [2020/34]
Applicant(s)For all designated states
GEZE GmbH
Reinhold-Vöster-Straße 21-29
71229 Leonberg / DE
[2016/42]
Inventor(s)01 / NOTTER, Felix
Kirchheimerstrasse 19
71229 Leonberg / DE
 [2016/42]
Application number, filing date14806207.820.11.2014
[2016/42]
WO2014EP75116
Priority number, dateDE2013102039610.12.2013         Original published format: DE102013020396
[2016/42]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2015086282
Date:18.06.2015
Language:DE
[2015/24]
Type: A1 Application with search report 
No.:EP3080374
Date:19.10.2016
Language:DE
The application published by WIPO in one of the EPO official languages on 18.06.2015 takes the place of the publication of the European patent application.
[2016/42]
Type: B1 Patent specification 
No.:EP3080374
Date:25.10.2017
Language:DE
[2017/43]
Search report(s)International search report - published on:EP18.06.2015
ClassificationIPC:E05F3/22, E05F1/10, E05F15/611
[2016/42]
CPC:
E05F1/105 (EP); E05F15/611 (EP); E05F3/222 (EP);
E05Y2201/214 (EP); E05Y2201/246 (EP); E05Y2201/418 (EP);
E05Y2201/462 (EP); E05Y2201/62 (EP); E05Y2800/252 (EP);
E05Y2900/531 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/42]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:MECHANISCHE ENERGIESPEICHERVORRICHTUNG FÜR EINEN DREHFLÜGEL[2016/42]
English:MECHANICAL ENERGY STORAGE DEVICE FOR A TURNING SASH[2017/24]
French:DISPOSITIF MÉCANIQUE DE STOCKAGE D'ÉNERGIE POUR UN VANTAIL ROTATIF[2017/24]
Former [2016/42]MECHANICAL ENERGY STORAGE APPARATUS FOR A ROTATING SASH
Former [2016/42]DISPOSITIF DE STOCKAGE D'ÉNERGIE MÉCANIQUE POUR VANTAIL
Entry into regional phase03.05.2016National basic fee paid 
03.05.2016Designation fee(s) paid 
03.05.2016Examination fee paid 
Examination procedure06.10.2015Request for preliminary examination filed
International Preliminary Examining Authority: EP
03.05.2016Amendment by applicant (claims and/or description)
03.05.2016Examination requested  [2016/42]
02.06.2017Communication of intention to grant the patent
11.09.2017Fee for grant paid
11.09.2017Fee for publishing/printing paid
11.09.2017Receipt of the translation of the claim(s)
Opposition(s)26.07.2018No opposition filed within time limit [2018/40]
Fees paidRenewal fee
23.11.2016Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU20.11.2014
AL25.10.2017
CY25.10.2017
CZ25.10.2017
EE25.10.2017
HR25.10.2017
LT25.10.2017
LV25.10.2017
MC25.10.2017
MK25.10.2017
MT25.10.2017
PT25.10.2017
RO25.10.2017
RS25.10.2017
SI25.10.2017
SK25.10.2017
SM25.10.2017
TR25.10.2017
BG25.01.2018
GR26.01.2018
IS25.02.2018
[2020/34]
Former [2020/28]HU20.11.2014
CY25.10.2017
CZ25.10.2017
EE25.10.2017
HR25.10.2017
LT25.10.2017
LV25.10.2017
MC25.10.2017
MK25.10.2017
MT25.10.2017
PT25.10.2017
RO25.10.2017
RS25.10.2017
SI25.10.2017
SK25.10.2017
SM25.10.2017
TR25.10.2017
BG25.01.2018
GR26.01.2018
IS25.02.2018
Former [2020/16]HU20.11.2014
CY25.10.2017
CZ25.10.2017
EE25.10.2017
HR25.10.2017
LT25.10.2017
LV25.10.2017
MC25.10.2017
MK25.10.2017
MT25.10.2017
RO25.10.2017
RS25.10.2017
SI25.10.2017
SK25.10.2017
SM25.10.2017
TR25.10.2017
BG25.01.2018
GR26.01.2018
IS25.02.2018
Former [2019/52]HU20.11.2014
CY25.10.2017
CZ25.10.2017
EE25.10.2017
HR25.10.2017
LT25.10.2017
LV25.10.2017
MC25.10.2017
MK25.10.2017
MT25.10.2017
RO25.10.2017
RS25.10.2017
SI25.10.2017
SK25.10.2017
SM25.10.2017
BG25.01.2018
GR26.01.2018
IS25.02.2018
Former [2019/37]HU20.11.2014
CY25.10.2017
CZ25.10.2017
EE25.10.2017
HR25.10.2017
LT25.10.2017
LV25.10.2017
MC25.10.2017
MT25.10.2017
RO25.10.2017
RS25.10.2017
SI25.10.2017
SK25.10.2017
SM25.10.2017
BG25.01.2018
GR26.01.2018
IS25.02.2018
Former [2019/31]HU20.11.2014
CY25.10.2017
CZ25.10.2017
EE25.10.2017
HR25.10.2017
LT25.10.2017
LV25.10.2017
MC25.10.2017
MT25.10.2017
RS25.10.2017
SI25.10.2017
SK25.10.2017
SM25.10.2017
BG25.01.2018
GR26.01.2018
IS25.02.2018
Former [2018/52]CY25.10.2017
CZ25.10.2017
EE25.10.2017
HR25.10.2017
LT25.10.2017
LV25.10.2017
MC25.10.2017
MT25.10.2017
RS25.10.2017
SI25.10.2017
SK25.10.2017
SM25.10.2017
BG25.01.2018
GR26.01.2018
IS25.02.2018
Former [2018/43]CY25.10.2017
CZ25.10.2017
EE25.10.2017
HR25.10.2017
LT25.10.2017
LV25.10.2017
MC25.10.2017
MT25.10.2017
RS25.10.2017
SK25.10.2017
SM25.10.2017
BG25.01.2018
GR26.01.2018
IS25.02.2018
Former [2018/37]CY25.10.2017
CZ25.10.2017
EE25.10.2017
HR25.10.2017
LT25.10.2017
LV25.10.2017
MC25.10.2017
RS25.10.2017
SK25.10.2017
SM25.10.2017
BG25.01.2018
GR26.01.2018
IS25.02.2018
Former [2018/36]CY25.10.2017
CZ25.10.2017
EE25.10.2017
HR25.10.2017
LT25.10.2017
LV25.10.2017
MC25.10.2017
RS25.10.2017
SK25.10.2017
BG25.01.2018
GR26.01.2018
IS25.02.2018
Former [2018/24]HR25.10.2017
LT25.10.2017
LV25.10.2017
RS25.10.2017
BG25.01.2018
GR26.01.2018
IS25.02.2018
Former [2018/22]LT25.10.2017
Cited inInternational search[A]EP2305936  (GEZE GMBH [DE]) [A] 1-11 * paragraph [0006] * * paragraphs [0011] - [0016] * * paragraphs [0021] - [0026] * * paragraphs [0031] - [0033] * * claims 1, 7, 8 * * figure - *;
 [AD]EP0693609  (GEZE GMBH & CO [DE]) [AD] 1-11 * claims 1, 2, 9 *
by applicantEP0693609
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.