blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3146664

EP3146664 - METHOD AND NODE IN A WIRELESS COMMUNICATION NETWORK [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  21.08.2020
Database last updated on 28.05.2024
FormerThe patent has been granted
Status updated on  13.09.2019
FormerGrant of patent is intended
Status updated on  12.05.2019
FormerRequest for examination was made
Status updated on  24.02.2017
FormerThe international publication has been made
Status updated on  23.12.2016
Most recent event   Tooltip01.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 03.08.2022  [2022/31]
Applicant(s)For all designated states
Huawei Technologies Co., Ltd.
Huawei Administration Building
Bantian
Longgang District
Shenzhen, Guangdong 518129 / CN
[N/P]
Former [2017/13]For all designated states
Huawei Technologies Co. Ltd.
Huawei Administration Building
Bantian
Longgang District
Shenzhen, Guangdong 518129 / CN
Inventor(s)01 / NASIRI KHORMUJI, Majid
Huawei Technologies Sweden AB Skalholtsgatan 9
S-16440 Kista / SE
 [2017/13]
Representative(s)Kreuz, Georg Maria
Huawei Technologies Duesseldorf GmbH
Riesstraße 25
80992 München / DE
[2019/42]
Former [2017/13]Kreuz, Georg Maria
Huawei Technologies Duesseldorf GmbH
Riesstrasse 8
80992 München / DE
Application number, filing date14809414.710.12.2014
[2017/13]
WO2014EP77138
Priority number, dateWO2014EP6328624.06.2014         Original published format: PCT/EP2014/063286
[2017/13]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015197142
Date:30.12.2015
Language:EN
[2015/52]
Type: A1 Application with search report 
No.:EP3146664
Date:29.03.2017
Language:EN
The application published by WIPO in one of the EPO official languages on 30.12.2015 takes the place of the publication of the European patent application.
[2017/13]
Type: B1 Patent specification 
No.:EP3146664
Date:16.10.2019
Language:EN
[2019/42]
Search report(s)International search report - published on:EP30.12.2015
ClassificationIPC:H04L5/00, H04B7/04, H04L25/02
[2017/13]
CPC:
H04L5/0048 (EP,CN,US); H04B1/7107 (CN,US); H04B7/0413 (EP,US);
H04J11/0043 (EP,CN,US); H04L25/0226 (EP,CN,US); H04L5/0007 (EP,CN,US);
H04L5/0035 (EP,CN,US); H04L5/0053 (EP,CN,US); H04B2201/70701 (CN,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/13]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:VERFAHREN UND KNOTEN IN EINEM DRAHTLOSKOMMUNIKATIONSNETZWERK[2017/13]
English:METHOD AND NODE IN A WIRELESS COMMUNICATION NETWORK[2017/13]
French:PROCÉDÉ ET NOEUD DANS UN RÉSEAU DE COMMUNICATION SANS FIL[2017/13]
Entry into regional phase22.12.2016National basic fee paid 
22.12.2016Designation fee(s) paid 
22.12.2016Examination fee paid 
Examination procedure22.12.2016Examination requested  [2017/13]
22.12.2016Date on which the examining division has become responsible
14.08.2017Amendment by applicant (claims and/or description)
13.05.2019Communication of intention to grant the patent
05.09.2019Fee for grant paid
05.09.2019Fee for publishing/printing paid
05.09.2019Receipt of the translation of the claim(s)
Divisional application(s)EP19202611.0  / EP3629512
Opposition(s)17.07.2020No opposition filed within time limit [2020/39]
Fees paidRenewal fee
22.12.2016Renewal fee patent year 03
02.01.2018Renewal fee patent year 04
02.01.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU10.12.2014
AL16.10.2019
AT16.10.2019
CY16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
MK16.10.2019
MT16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
IE10.12.2019
LU10.12.2019
FR16.12.2019
BE31.12.2019
CH31.12.2019
LI31.12.2019
BG16.01.2020
GB16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
[2022/31]
Former [2021/34]HU10.12.2014
AL16.10.2019
AT16.10.2019
CY16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
MT16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
IE10.12.2019
LU10.12.2019
FR16.12.2019
BE31.12.2019
CH31.12.2019
LI31.12.2019
BG16.01.2020
GB16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2021/32]HU10.12.2014
AL16.10.2019
AT16.10.2019
CY16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
IE10.12.2019
LU10.12.2019
FR16.12.2019
BE31.12.2019
CH31.12.2019
LI31.12.2019
BG16.01.2020
GB16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2021/26]AL16.10.2019
AT16.10.2019
CY16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
IE10.12.2019
LU10.12.2019
FR16.12.2019
BE31.12.2019
CH31.12.2019
LI31.12.2019
BG16.01.2020
GB16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/51]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
IE10.12.2019
LU10.12.2019
FR16.12.2019
BE31.12.2019
CH31.12.2019
LI31.12.2019
BG16.01.2020
GB16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/48]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SK16.10.2019
SM16.10.2019
IE10.12.2019
LU10.12.2019
FR16.12.2019
BG16.01.2020
GB16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/46]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SK16.10.2019
SM16.10.2019
IE10.12.2019
LU10.12.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/39]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SK16.10.2019
SM16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/38]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SK16.10.2019
SM16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/37]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SK16.10.2019
SM16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/36]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/35]AL16.10.2019
AT16.10.2019
CZ16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/32]AL16.10.2019
AT16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RS16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/25]AT16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RS16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/24]AT16.10.2019
FI16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/23]AT16.10.2019
FI16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
Former [2020/22]FI16.10.2019
LT16.10.2019
NL16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
PT17.02.2020
Former [2020/21]NL16.10.2019
NO16.01.2020
Former [2020/20]NL16.10.2019
Cited inInternational search[XI]WO2011041544  (QUALCOMM INC [US], et al) [X] 1,2,4-6,12,13 * paragraphs [0015] , [0 34] , [0075] - [0089] * * figures 7,8 * [I] 1-13;
 [XI]WO2013091187  (RENESAS MOBILE CORP [JP], et al) [X] 1,2,4,5,12,13 * abstract * * page 4, line 32 - page 5, line 4 * * page 8, line 5 - line 26 * * page 9, line 10 - line 19 * * page 9, line 30 - page 10, line 34 * * page 11, line 13 - line 14 * * page 14, line 13 - line 35 * * figures 1-4,7 * [I] 1-13;
 [E]WO2014208859  (LG ELECTRONICS INC [KR]) [E] 1-13 * abstract * * paragraphs [0085] , [0088] - [0090] * * figure 9 *;
 [E]WO2015008914  (LG ELECTRONICS INC [KR]) [E] 1-13 * abstract * * paragraphs [0009] , [0082] - [0086] - [0147] - [0149] ** figures 9,10 *;
 [A]  - LI LI ET AL, "A Novel Semi-Dynamic Inter-Cell Interference Coordination Scheme Based on User Grouping", VEHICULAR TECHNOLOGY CONFERENCE FALL (VTC 2009-FALL), 2009 IEEE 70TH, IEEE, PISCATAWAY, NJ, USA, (20090920), ISBN 978-1-4244-2514-3, pages 1 - 5, XP031600186 [A] 1-13 * abstract * * figure 1 * * section III *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.