| EP2905955 - SHOOTING METHOD AND DEVICE [Right-click to bookmark this link] | |||
| Former [2015/33] | SHOOTING METHOD AND DEVICE, AND TERMINAL | ||
| [2021/49] | Status | No opposition filed within time limit Status updated on 03.03.2023 Database last updated on 11.04.2026 | |
| Former | The patent has been granted Status updated on 25.03.2022 | ||
| Former | Grant of patent is intended Status updated on 30.11.2021 | ||
| Former | Examination is in progress Status updated on 21.04.2017 | Most recent event Tooltip | 15.11.2024 | Change - lapse in a contracting state Updated state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2015/33] | Inventor(s) | 01 /
XIE, Qingpeng Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | 02 /
ZHANG, Lei Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | 03 /
LI, Shanfu Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | 04 /
YAO, Jun Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | 05 /
GAO, Shan Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | [2015/33] | Representative(s) | Goddar, Heinz J. Boehmert & Boehmert Anwaltspartnerschaft mbB Pettenkoferstrasse 22 80336 München / DE | [2022/17] |
| Former [2015/33] | Goddar, Heinz J. Boehmert & Boehmert Anwaltspartnerschaft mbB Patentanwälte Rechtsanwälte Pettenkoferstrasse 20-22 80336 München / DE | Application number, filing date | 14809744.7 | 07.07.2014 | [2015/33] | WO2014CN81739 | Priority number, date | CN201310753985 | 31.12.2013 Original published format: CN201310753985 | [2015/33] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015101001 | Date: | 09.07.2015 | Language: | ZH | [2015/27] | Type: | A1 Application with search report | No.: | EP2905955 | Date: | 12.08.2015 | Language: | EN | [2015/33] | Type: | B1 Patent specification | No.: | EP2905955 | Date: | 27.04.2022 | Language: | EN | [2022/17] | Search report(s) | International search report - published on: | CN | 09.07.2015 | (Supplementary) European search report - dispatched on: | EP | 09.10.2015 | Classification | IPC: | H04N5/232, H04N5/235, G03B15/02, H04M1/02, H04N5/225 | [2015/46] | CPC: |
G03B7/16 (EP);
H04N23/633 (EP,US);
G03B15/05 (EP);
H04N23/64 (EP);
H04N23/71 (EP);
H04N5/272 (EP);
|
| Former IPC [2015/35] | H04N5/232, H04N5/235 | ||
| Former IPC [2015/33] | H04N5/232 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/33] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | AUFNAHMEVERFAHREN UND VORRICHTUNG | [2021/49] | English: | SHOOTING METHOD AND DEVICE | [2021/49] | French: | MÉTHODE ET DISPOSITIF DE CAPTURE | [2021/49] |
| Former [2015/33] | AUFNAHMEVERFAHREN, VORRICHTUNG UND ENDGERÄT | ||
| Former [2015/33] | SHOOTING METHOD AND DEVICE, AND TERMINAL | ||
| Former [2015/33] | MÉTHODE ET DISPOSITIF DE CAPTURE, ET TERMINAL ASSOCIÉ | Entry into regional phase | 18.12.2014 | Translation filed | 18.12.2014 | National basic fee paid | 18.12.2014 | Search fee paid | 18.12.2014 | Designation fee(s) paid | 18.12.2014 | Examination fee paid | Examination procedure | 18.12.2014 | Examination requested [2015/33] | 02.05.2016 | Amendment by applicant (claims and/or description) | 21.04.2017 | Despatch of a communication from the examining division (Time limit: M02) | 20.06.2017 | Reply to a communication from the examining division | 13.02.2020 | Despatch of a communication from the examining division (Time limit: M02) | 16.04.2020 | Reply to a communication from the examining division | 02.11.2021 | Cancellation of oral proceeding that was planned for 09.11.2021 | 09.11.2021 | Date of oral proceedings (cancelled) | 01.12.2021 | Communication of intention to grant the patent | 14.03.2022 | Receipt of the translation of the claim(s) | 21.03.2022 | Fee for grant paid | 21.03.2022 | Fee for publishing/printing paid | Opposition(s) | 30.01.2023 | No opposition filed within time limit [2023/14] | Fees paid | Renewal fee | 21.07.2016 | Renewal fee patent year 03 | 18.07.2017 | Renewal fee patent year 04 | 03.07.2018 | Renewal fee patent year 05 | 11.07.2019 | Renewal fee patent year 06 | 09.07.2020 | Renewal fee patent year 07 | 08.07.2021 | Renewal fee patent year 08 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.07.2014 | AL | 27.04.2022 | AT | 27.04.2022 | BG | 27.04.2022 | CY | 27.04.2022 | CZ | 27.04.2022 | DK | 27.04.2022 | EE | 27.04.2022 | ES | 27.04.2022 | FI | 27.04.2022 | HR | 27.04.2022 | IT | 27.04.2022 | LT | 27.04.2022 | LV | 27.04.2022 | MC | 27.04.2022 | MK | 27.04.2022 | MT | 27.04.2022 | NL | 27.04.2022 | PL | 27.04.2022 | RO | 27.04.2022 | RS | 27.04.2022 | SE | 27.04.2022 | SI | 27.04.2022 | SK | 27.04.2022 | SM | 27.04.2022 | TR | 27.04.2022 | IE | 07.07.2022 | LU | 07.07.2022 | NO | 27.07.2022 | GR | 28.07.2022 | BE | 31.07.2022 | CH | 31.07.2022 | LI | 31.07.2022 | IS | 27.08.2022 | PT | 29.08.2022 | [2024/51] |
| Former [2024/41] | HU | 07.07.2014 | |
| AL | 27.04.2022 | ||
| AT | 27.04.2022 | ||
| CY | 27.04.2022 | ||
| CZ | 27.04.2022 | ||
| DK | 27.04.2022 | ||
| EE | 27.04.2022 | ||
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| IT | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| MC | 27.04.2022 | ||
| MK | 27.04.2022 | ||
| MT | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RO | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| SE | 27.04.2022 | ||
| SI | 27.04.2022 | ||
| SK | 27.04.2022 | ||
| SM | 27.04.2022 | ||
| TR | 27.04.2022 | ||
| IE | 07.07.2022 | ||
| LU | 07.07.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| BE | 31.07.2022 | ||
| CH | 31.07.2022 | ||
| LI | 31.07.2022 | ||
| IS | 27.08.2022 | ||
| PT | 29.08.2022 | ||
| Former [2024/29] | HU | 07.07.2014 | |
| AL | 27.04.2022 | ||
| AT | 27.04.2022 | ||
| CY | 27.04.2022 | ||
| CZ | 27.04.2022 | ||
| DK | 27.04.2022 | ||
| EE | 27.04.2022 | ||
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| IT | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| MC | 27.04.2022 | ||
| MK | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RO | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| SE | 27.04.2022 | ||
| SI | 27.04.2022 | ||
| SK | 27.04.2022 | ||
| SM | 27.04.2022 | ||
| TR | 27.04.2022 | ||
| IE | 07.07.2022 | ||
| LU | 07.07.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| BE | 31.07.2022 | ||
| CH | 31.07.2022 | ||
| LI | 31.07.2022 | ||
| IS | 27.08.2022 | ||
| PT | 29.08.2022 | ||
| Former [2024/22] | HU | 07.07.2014 | |
| AL | 27.04.2022 | ||
| AT | 27.04.2022 | ||
| CY | 27.04.2022 | ||
| CZ | 27.04.2022 | ||
| DK | 27.04.2022 | ||
| EE | 27.04.2022 | ||
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| IT | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| MC | 27.04.2022 | ||
| MK | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RO | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| SE | 27.04.2022 | ||
| SI | 27.04.2022 | ||
| SK | 27.04.2022 | ||
| SM | 27.04.2022 | ||
| IE | 07.07.2022 | ||
| LU | 07.07.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| BE | 31.07.2022 | ||
| CH | 31.07.2022 | ||
| LI | 31.07.2022 | ||
| IS | 27.08.2022 | ||
| PT | 29.08.2022 | ||
| Former [2024/20] | HU | 07.07.2014 | |
| AL | 27.04.2022 | ||
| AT | 27.04.2022 | ||
| CY | 27.04.2022 | ||
| CZ | 27.04.2022 | ||
| DK | 27.04.2022 | ||
| EE | 27.04.2022 | ||
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| IT | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| MC | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RO | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| SE | 27.04.2022 | ||
| SI | 27.04.2022 | ||
| SK | 27.04.2022 | ||
| SM | 27.04.2022 | ||
| IE | 07.07.2022 | ||
| LU | 07.07.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| BE | 31.07.2022 | ||
| CH | 31.07.2022 | ||
| LI | 31.07.2022 | ||
| IS | 27.08.2022 | ||
| PT | 29.08.2022 | ||
| Former [2024/18] | HU | 07.07.2014 | |
| AL | 27.04.2022 | ||
| AT | 27.04.2022 | ||
| CZ | 27.04.2022 | ||
| DK | 27.04.2022 | ||
| EE | 27.04.2022 | ||
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| IT | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| MC | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RO | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| SE | 27.04.2022 | ||
| SI | 27.04.2022 | ||
| SK | 27.04.2022 | ||
| SM | 27.04.2022 | ||
| IE | 07.07.2022 | ||
| LU | 07.07.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| BE | 31.07.2022 | ||
| CH | 31.07.2022 | ||
| LI | 31.07.2022 | ||
| IS | 27.08.2022 | ||
| PT | 29.08.2022 | ||
| Former [2024/11] | AL | 27.04.2022 | |
| AT | 27.04.2022 | ||
| CZ | 27.04.2022 | ||
| DK | 27.04.2022 | ||
| EE | 27.04.2022 | ||
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| IT | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| MC | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RO | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| SE | 27.04.2022 | ||
| SI | 27.04.2022 | ||
| SK | 27.04.2022 | ||
| SM | 27.04.2022 | ||
| IE | 07.07.2022 | ||
| LU | 07.07.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| BE | 31.07.2022 | ||
| CH | 31.07.2022 | ||
| LI | 31.07.2022 | ||
| IS | 27.08.2022 | ||
| PT | 29.08.2022 | ||
| Former [2023/33] | AL | 27.04.2022 | |
| AT | 27.04.2022 | ||
| CZ | 27.04.2022 | ||
| DK | 27.04.2022 | ||
| EE | 27.04.2022 | ||
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| MC | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RO | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| SE | 27.04.2022 | ||
| SI | 27.04.2022 | ||
| SK | 27.04.2022 | ||
| SM | 27.04.2022 | ||
| IE | 07.07.2022 | ||
| LU | 07.07.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| BE | 31.07.2022 | ||
| CH | 31.07.2022 | ||
| LI | 31.07.2022 | ||
| IS | 27.08.2022 | ||
| PT | 29.08.2022 | ||
| Former [2023/25] | AL | 27.04.2022 | |
| AT | 27.04.2022 | ||
| CZ | 27.04.2022 | ||
| DK | 27.04.2022 | ||
| EE | 27.04.2022 | ||
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| MC | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RO | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| SE | 27.04.2022 | ||
| SI | 27.04.2022 | ||
| SK | 27.04.2022 | ||
| SM | 27.04.2022 | ||
| LU | 07.07.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| BE | 31.07.2022 | ||
| CH | 31.07.2022 | ||
| LI | 31.07.2022 | ||
| IS | 27.08.2022 | ||
| PT | 29.08.2022 | ||
| Former [2023/21] | AL | 27.04.2022 | |
| AT | 27.04.2022 | ||
| CZ | 27.04.2022 | ||
| DK | 27.04.2022 | ||
| EE | 27.04.2022 | ||
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| MC | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RO | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| SE | 27.04.2022 | ||
| SK | 27.04.2022 | ||
| SM | 27.04.2022 | ||
| LU | 07.07.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| CH | 31.07.2022 | ||
| LI | 31.07.2022 | ||
| IS | 27.08.2022 | ||
| PT | 29.08.2022 | ||
| Former [2023/17] | AL | 27.04.2022 | |
| AT | 27.04.2022 | ||
| CZ | 27.04.2022 | ||
| DK | 27.04.2022 | ||
| EE | 27.04.2022 | ||
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| MC | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RO | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| SE | 27.04.2022 | ||
| SK | 27.04.2022 | ||
| SM | 27.04.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| IS | 27.08.2022 | ||
| PT | 29.08.2022 | ||
| Former [2023/11] | AT | 27.04.2022 | |
| CZ | 27.04.2022 | ||
| DK | 27.04.2022 | ||
| EE | 27.04.2022 | ||
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| MC | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RO | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| SE | 27.04.2022 | ||
| SK | 27.04.2022 | ||
| SM | 27.04.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| IS | 27.08.2022 | ||
| PT | 29.08.2022 | ||
| Former [2023/09] | AT | 27.04.2022 | |
| CZ | 27.04.2022 | ||
| DK | 27.04.2022 | ||
| EE | 27.04.2022 | ||
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RO | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| SE | 27.04.2022 | ||
| SK | 27.04.2022 | ||
| SM | 27.04.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| IS | 27.08.2022 | ||
| PT | 29.08.2022 | ||
| Former [2023/07] | AT | 27.04.2022 | |
| DK | 27.04.2022 | ||
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| SE | 27.04.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| IS | 27.08.2022 | ||
| PT | 29.08.2022 | ||
| Former [2022/51] | AT | 27.04.2022 | |
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| SE | 27.04.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| IS | 27.08.2022 | ||
| PT | 29.08.2022 | ||
| Former [2022/50] | AT | 27.04.2022 | |
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| SE | 27.04.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| PT | 29.08.2022 | ||
| Former [2022/49] | AT | 27.04.2022 | |
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| SE | 27.04.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| PT | 29.08.2022 | ||
| Former [2022/47] | AT | 27.04.2022 | |
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| SE | 27.04.2022 | ||
| NO | 27.07.2022 | ||
| PT | 29.08.2022 | ||
| Former [2022/44] | NL | 27.04.2022 | Documents cited: | Search | [XYI] US2013050233 (HIRSCH ALEXANDER SAMSON et al.) [X] 1-4,8,10-12,14 * figures 5, 6A-6D * * paragraph [0001] * * paragraph [0024] * * paragraph [0042] * * paragraph [0061] * * paragraph [0065] * * paragraph [0071] * * paragraph [0078] * * paragraph [0037] *[Y] 5,6 [I] 7,9,13,15 | [XA] US2009322889 (KUJAWA GREGORY et al.) [X] 1-3,10,11 * figures 1, 2 * * paragraph [0013] * * paragraph [0014] * * paragraph [0033] - paragraph [0038] *[A] 4-9,12-15 | [IA] JP2004180245 (CASIO COMPUTER CO LTD et al.) [I] 1-3,10 * figures 5-7 * * paragraphs [0006] - [0012] *[A] 4-9,11-15 | [XA] EP1650706 (LG ELECTRONICS INC et al.) [X] 1-3,10 * claims 1, 6 * * figures 1-4 * * paragraph [0015] - paragraph [0027] *[A] 4-9,11-15 | [XA] EP2667587 (ST ERICSSON SA et al.) [X] 1-3,10 * claims 1, 13 * * figures 1-6 * * paragraph [0015] - paragraph [0017] * * paragraph [0025] * * paragraph [0038] - paragraph [0050] *[A] 4-9,11-15 | [XA] US2004239799 (SUZUKI NAOTO et al.) [X] 1,10 * figures 1-7 * * paragraph [0007] - paragraph [0009] * * claims 1-8 *[A] 2-9,11-15 | [Y] "set.a.light 3D STUDIO - 3D Photo Studio Simulation", 1 September 2012 (2012-09-01), www.elixxier.com, XP055217289, Retrieved from the Internet | International search | [X] CN103152523 (HUAWEI DEVICE CO LTD et al.) [X] | [X] CN103220421 (GUANGDONG OPPO MOBILE TELECOMM et al.) [X] | [A] CN101697563 (YULONG COMP TELECOMM SCIENT et al.) [A] | [A] US2009256814 (CHUNG JIN-WOO et al.) [A] | [A] EP2109298 (LG ELECTRONICS INC et al.) [A] | Examination | US6343189 |