EP3062992 - METHOD FOR PRODUCING THREE-DIMENSIONAL MODELS USING A BINDING AGENT SYSTEM [Right-click to bookmark this link] | |||
Former [2016/36] | METHOD AND DEVICE FOR PRODUCING THREE-DIMENSIONAL MODELS USING A BINDING AGENT SYSTEM | ||
[2022/15] | Status | No opposition filed within time limit Status updated on 23.06.2023 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 15.07.2022 | ||
Former | Grant of patent is intended Status updated on 29.03.2022 | ||
Former | Examination is in progress Status updated on 14.09.2018 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states voxeljet AG Paul-Lenz-Strasse 1 86316 Friedberg / DE | [2016/36] | Inventor(s) | 01 /
EDERER, Ingo Feuerhausstr. 2 82269 Geltendorf / DE | 02 /
GÜNTHER, Daniel Aberlestr. 13 81317 München / DE | 03 /
RECKNAGEL, Ulrich Ernst-Fabian-Str. 12 08058 Zwickau / DE | 04 /
MÖGELE, Florian Am Mühlfeld 5 86459 Gessertshausen-Döpshofen / DE | [2016/36] | Representative(s) | Hoefer & Partner Patentanwälte mbB Pilgersheimer Straße 20 81543 München / DE | [N/P] |
Former [2016/36] | Helbig, Christian Wagner + Helbig Patentanwälte Pfarrstrasse 14 80538 München / DE | Application number, filing date | 14809756.1 | 29.10.2014 | [2016/36] | WO2014DE00546 | Priority number, date | DE20131018182 | 30.10.2013 Original published format: DE102013018182 | [2016/36] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2015062569 | Date: | 07.05.2015 | Language: | DE | [2015/18] | Type: | A1 Application with search report | No.: | EP3062992 | Date: | 07.09.2016 | Language: | DE | The application published by WIPO in one of the EPO official languages on 07.05.2015 takes the place of the publication of the European patent application. | [2016/36] | Type: | B1 Patent specification | No.: | EP3062992 | Date: | 17.08.2022 | Language: | DE | [2022/33] | Search report(s) | International search report - published on: | EP | 07.05.2015 | Classification | IPC: | B33Y10/00, B29C64/165, B29C64/245, B29C64/295, B33Y30/00, B33Y70/00 | [2020/42] | CPC: |
B29C64/165 (EP,CN,KR,US);
B22F10/30 (KR);
B29C64/153 (KR);
B29C64/245 (EP,KR,US);
B29C64/295 (EP,KR,US);
B29C64/40 (KR);
B33Y10/00 (EP,KR,US);
B33Y30/00 (EP,CN,KR,US);
B33Y40/20 (KR);
B33Y70/00 (EP,CN,US);
B33Y70/10 (KR);
B23K2103/36 (KR);
B23K2103/42 (KR);
B29C2035/0822 (KR);
B29K2105/251 (KR);
|
Former IPC [2016/36] | B29C67/00, B33Y10/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/36] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUM HERSTELLEN VON DREIDIMENSIONALEN MODELLEN MIT BINDERSYSTEM | [2022/15] | English: | METHOD FOR PRODUCING THREE-DIMENSIONAL MODELS USING A BINDING AGENT SYSTEM | [2022/15] | French: | PROCÉDÉ DE FABRICATION DE MODÈLES TRIDIMENSIONNELS AU MOYEN D'UN SYSTÈME DE LIANT | [2022/15] |
Former [2016/36] | VERFAHREN UND VORRICHTUNG ZUM HERSTELLEN VON DREIDIMENSIONALEN MODELLEN MIT BINDERSYSTEM | ||
Former [2016/36] | METHOD AND DEVICE FOR PRODUCING THREE-DIMENSIONAL MODELS USING A BINDING AGENT SYSTEM | ||
Former [2016/36] | PROCÉDÉ ET DISPOSITIF DE FABRICATION DE MODÈLES TRIDIMENSIONNELS AU MOYEN D'UN SYSTÈME DE LIANT | Entry into regional phase | 19.05.2016 | National basic fee paid | 19.05.2016 | Designation fee(s) paid | 19.05.2016 | Examination fee paid | Examination procedure | 19.05.2016 | Examination requested [2016/36] | 22.12.2016 | Amendment by applicant (claims and/or description) | 18.09.2018 | Despatch of a communication from the examining division (Time limit: M06) | 22.03.2019 | Reply to a communication from the examining division | 13.09.2019 | Despatch of a communication from the examining division (Time limit: M06) | 16.03.2020 | Reply to a communication from the examining division | 23.09.2020 | Despatch of a communication from the examining division (Time limit: M06) | 23.03.2021 | Reply to a communication from the examining division | 08.03.2022 | Cancellation of oral proceeding that was planned for 31.03.2022 | 30.03.2022 | Communication of intention to grant the patent | 31.03.2022 | Date of oral proceedings (cancelled) | 06.07.2022 | Fee for grant paid | 06.07.2022 | Fee for publishing/printing paid | 06.07.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 19.05.2023 | No opposition filed within time limit [2023/30] | Fees paid | Renewal fee | 27.10.2016 | Renewal fee patent year 03 | 26.10.2017 | Renewal fee patent year 04 | 30.10.2018 | Renewal fee patent year 05 | 22.10.2019 | Renewal fee patent year 06 | 14.10.2020 | Renewal fee patent year 07 | 18.10.2021 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.10.2014 | AL | 17.08.2022 | BG | 17.08.2022 | CY | 17.08.2022 | CZ | 17.08.2022 | DK | 17.08.2022 | EE | 17.08.2022 | FI | 17.08.2022 | HR | 17.08.2022 | LT | 17.08.2022 | LV | 17.08.2022 | MC | 17.08.2022 | MK | 17.08.2022 | MT | 17.08.2022 | NL | 17.08.2022 | PL | 17.08.2022 | RO | 17.08.2022 | RS | 17.08.2022 | SI | 17.08.2022 | SK | 17.08.2022 | SM | 17.08.2022 | TR | 17.08.2022 | AT | 29.10.2022 | IE | 29.10.2022 | LU | 29.10.2022 | BE | 31.10.2022 | CH | 31.10.2022 | LI | 31.10.2022 | NO | 17.11.2022 | GR | 18.11.2022 | IS | 17.12.2022 | PT | 19.12.2022 | [2024/41] |
Former [2024/34] | HU | 29.10.2014 | |
AL | 17.08.2022 | ||
BG | 17.08.2022 | ||
CY | 17.08.2022 | ||
CZ | 17.08.2022 | ||
DK | 17.08.2022 | ||
EE | 17.08.2022 | ||
FI | 17.08.2022 | ||
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
MC | 17.08.2022 | ||
MK | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RO | 17.08.2022 | ||
RS | 17.08.2022 | ||
SI | 17.08.2022 | ||
SK | 17.08.2022 | ||
SM | 17.08.2022 | ||
TR | 17.08.2022 | ||
AT | 29.10.2022 | ||
IE | 29.10.2022 | ||
LU | 29.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
IS | 17.12.2022 | ||
PT | 19.12.2022 | ||
Former [2024/29] | HU | 29.10.2014 | |
AL | 17.08.2022 | ||
CY | 17.08.2022 | ||
CZ | 17.08.2022 | ||
DK | 17.08.2022 | ||
EE | 17.08.2022 | ||
FI | 17.08.2022 | ||
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
MC | 17.08.2022 | ||
MK | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RO | 17.08.2022 | ||
RS | 17.08.2022 | ||
SI | 17.08.2022 | ||
SK | 17.08.2022 | ||
SM | 17.08.2022 | ||
TR | 17.08.2022 | ||
AT | 29.10.2022 | ||
IE | 29.10.2022 | ||
LU | 29.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
IS | 17.12.2022 | ||
PT | 19.12.2022 | ||
Former [2024/27] | HU | 29.10.2014 | |
AL | 17.08.2022 | ||
CY | 17.08.2022 | ||
CZ | 17.08.2022 | ||
DK | 17.08.2022 | ||
EE | 17.08.2022 | ||
FI | 17.08.2022 | ||
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
MC | 17.08.2022 | ||
MK | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RO | 17.08.2022 | ||
RS | 17.08.2022 | ||
SI | 17.08.2022 | ||
SK | 17.08.2022 | ||
SM | 17.08.2022 | ||
AT | 29.10.2022 | ||
IE | 29.10.2022 | ||
LU | 29.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
IS | 17.12.2022 | ||
PT | 19.12.2022 | ||
Former [2024/21] | HU | 29.10.2014 | |
AL | 17.08.2022 | ||
CY | 17.08.2022 | ||
CZ | 17.08.2022 | ||
DK | 17.08.2022 | ||
EE | 17.08.2022 | ||
FI | 17.08.2022 | ||
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
MC | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RO | 17.08.2022 | ||
RS | 17.08.2022 | ||
SI | 17.08.2022 | ||
SK | 17.08.2022 | ||
SM | 17.08.2022 | ||
AT | 29.10.2022 | ||
IE | 29.10.2022 | ||
LU | 29.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
IS | 17.12.2022 | ||
PT | 19.12.2022 | ||
Former [2024/18] | HU | 29.10.2014 | |
AL | 17.08.2022 | ||
CZ | 17.08.2022 | ||
DK | 17.08.2022 | ||
EE | 17.08.2022 | ||
FI | 17.08.2022 | ||
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
MC | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RO | 17.08.2022 | ||
RS | 17.08.2022 | ||
SI | 17.08.2022 | ||
SK | 17.08.2022 | ||
SM | 17.08.2022 | ||
AT | 29.10.2022 | ||
IE | 29.10.2022 | ||
LU | 29.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
IS | 17.12.2022 | ||
PT | 19.12.2022 | ||
Former [2024/09] | AL | 17.08.2022 | |
CZ | 17.08.2022 | ||
DK | 17.08.2022 | ||
EE | 17.08.2022 | ||
FI | 17.08.2022 | ||
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
MC | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RO | 17.08.2022 | ||
RS | 17.08.2022 | ||
SI | 17.08.2022 | ||
SK | 17.08.2022 | ||
SM | 17.08.2022 | ||
AT | 29.10.2022 | ||
IE | 29.10.2022 | ||
LU | 29.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
IS | 17.12.2022 | ||
PT | 19.12.2022 | ||
Former [2023/48] | AL | 17.08.2022 | |
CZ | 17.08.2022 | ||
DK | 17.08.2022 | ||
EE | 17.08.2022 | ||
FI | 17.08.2022 | ||
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
MC | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RO | 17.08.2022 | ||
RS | 17.08.2022 | ||
SI | 17.08.2022 | ||
SK | 17.08.2022 | ||
SM | 17.08.2022 | ||
IE | 29.10.2022 | ||
LU | 29.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
IS | 17.12.2022 | ||
PT | 19.12.2022 | ||
Former [2023/42] | AL | 17.08.2022 | |
CZ | 17.08.2022 | ||
DK | 17.08.2022 | ||
EE | 17.08.2022 | ||
FI | 17.08.2022 | ||
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
MC | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RO | 17.08.2022 | ||
RS | 17.08.2022 | ||
SI | 17.08.2022 | ||
SK | 17.08.2022 | ||
SM | 17.08.2022 | ||
LU | 29.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
IS | 17.12.2022 | ||
PT | 19.12.2022 | ||
Former [2023/37] | AL | 17.08.2022 | |
CZ | 17.08.2022 | ||
DK | 17.08.2022 | ||
EE | 17.08.2022 | ||
FI | 17.08.2022 | ||
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
MC | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RO | 17.08.2022 | ||
RS | 17.08.2022 | ||
SI | 17.08.2022 | ||
SK | 17.08.2022 | ||
SM | 17.08.2022 | ||
LU | 29.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
IS | 17.12.2022 | ||
PT | 19.12.2022 | ||
Former [2023/35] | AL | 17.08.2022 | |
CZ | 17.08.2022 | ||
DK | 17.08.2022 | ||
EE | 17.08.2022 | ||
FI | 17.08.2022 | ||
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
MC | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RO | 17.08.2022 | ||
RS | 17.08.2022 | ||
SK | 17.08.2022 | ||
SM | 17.08.2022 | ||
LU | 29.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
IS | 17.12.2022 | ||
PT | 19.12.2022 | ||
Former [2023/30] | AL | 17.08.2022 | |
CZ | 17.08.2022 | ||
DK | 17.08.2022 | ||
EE | 17.08.2022 | ||
FI | 17.08.2022 | ||
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
MC | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RO | 17.08.2022 | ||
RS | 17.08.2022 | ||
SK | 17.08.2022 | ||
SM | 17.08.2022 | ||
LU | 29.10.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
IS | 17.12.2022 | ||
PT | 19.12.2022 | ||
Former [2023/29] | AL | 17.08.2022 | |
CZ | 17.08.2022 | ||
DK | 17.08.2022 | ||
EE | 17.08.2022 | ||
FI | 17.08.2022 | ||
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
MC | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RO | 17.08.2022 | ||
RS | 17.08.2022 | ||
SK | 17.08.2022 | ||
SM | 17.08.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
IS | 17.12.2022 | ||
PT | 19.12.2022 | ||
Former [2023/25] | CZ | 17.08.2022 | |
DK | 17.08.2022 | ||
EE | 17.08.2022 | ||
FI | 17.08.2022 | ||
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
MC | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RO | 17.08.2022 | ||
RS | 17.08.2022 | ||
SK | 17.08.2022 | ||
SM | 17.08.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
IS | 17.12.2022 | ||
PT | 19.12.2022 | ||
Former [2023/23] | CZ | 17.08.2022 | |
DK | 17.08.2022 | ||
EE | 17.08.2022 | ||
FI | 17.08.2022 | ||
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RO | 17.08.2022 | ||
RS | 17.08.2022 | ||
SK | 17.08.2022 | ||
SM | 17.08.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
IS | 17.12.2022 | ||
PT | 19.12.2022 | ||
Former [2023/22] | CZ | 17.08.2022 | |
DK | 17.08.2022 | ||
FI | 17.08.2022 | ||
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RO | 17.08.2022 | ||
RS | 17.08.2022 | ||
SM | 17.08.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
IS | 17.12.2022 | ||
PT | 19.12.2022 | ||
Former [2023/21] | DK | 17.08.2022 | |
FI | 17.08.2022 | ||
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RS | 17.08.2022 | ||
SM | 17.08.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
IS | 17.12.2022 | ||
PT | 19.12.2022 | ||
Former [2023/20] | FI | 17.08.2022 | |
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RS | 17.08.2022 | ||
SM | 17.08.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
IS | 17.12.2022 | ||
PT | 19.12.2022 | ||
Former [2023/12] | FI | 17.08.2022 | |
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RS | 17.08.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
IS | 17.12.2022 | ||
PT | 19.12.2022 | ||
Former [2023/11] | FI | 17.08.2022 | |
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RS | 17.08.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
PT | 19.12.2022 | ||
Former [2023/10] | FI | 17.08.2022 | |
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
NL | 17.08.2022 | ||
RS | 17.08.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
PT | 19.12.2022 | ||
Former [2023/09] | FI | 17.08.2022 | |
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
NL | 17.08.2022 | ||
RS | 17.08.2022 | ||
NO | 17.11.2022 | ||
PT | 19.12.2022 | ||
Former [2023/08] | FI | 17.08.2022 | |
LT | 17.08.2022 | ||
NL | 17.08.2022 | ||
RS | 17.08.2022 | ||
NO | 17.11.2022 | Cited in | International search | [XI]EP1524049 (HEWLETT PACKARD DEVELOPMENT CO [US]) [X] 4,6,7 * abstract * * paragraph [0024] - paragraph [0025] * * paragraph [0056] - paragraph [0058] * * figures 2,5,6 *[I] 5; | [XI]DE102006038858 (VOXELJET TECHNOLOGY GMBH [DE]) [X] 1,3 * abstract * * paragraph [0072] - paragraph [0083] * * claims 13,16,17 * * figure 1 * [I] 2 | Examination | US6403002 | WO2012152563 | by applicant | EP0431924 |