| EP3075197 - METHOD OF SYNCHRONIZATION WITHIN AN LTE/LTE-A SYSTEM IN UNLICENSED SPECTRUM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.02.2021 Database last updated on 11.04.2026 | |
| Former | The patent has been granted Status updated on 06.03.2020 | ||
| Former | Grant of patent is intended Status updated on 23.10.2019 | ||
| Former | Examination is in progress Status updated on 12.10.2018 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): BE | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Qualcomm Incorporated 5775 Morehouse Drive San Diego, CA 92121-1714 / US | [2016/40] | Inventor(s) | 01 /
PATEL, Shimman, Arvind 5775 Morehouse Drive San Diego, California 92121-1714 / US | 02 /
LUO, Tao 5775 Morehouse Drive San Diego, California 92121-1714 / US | 03 /
BHUSHAN, Naga 5775 Morehouse Drive San Diego, California 92121-1714 / US | 04 /
GAAL, Peter 5775 Morehouse Drive San Diego, California 92121-1714 / US | 05 /
XU, Hao 5775 Morehouse Drive San Diego, California 92121-1714 / US | [2016/40] | Representative(s) | Bardehle Pagenberg Partnerschaft mbB Patentanwälte Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | [N/P] |
| Former [2016/40] | Wegner, Hans Bardehle Pagenberg Partnerschaft mbB Patentanwälte, Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | Application number, filing date | 14810098.5 | 25.11.2014 | [2016/40] | WO2014US67245 | Priority number, date | US201361908282P | 25.11.2013 Original published format: US 201361908282 P | US201414552127 | 24.11.2014 Original published format: US201414552127 | [2016/40] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2015077747 | Date: | 28.05.2015 | Language: | EN | [2015/21] | Type: | A2 Application without search report | No.: | EP3075197 | Date: | 05.10.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 28.05.2015 takes the place of the publication of the European patent application. | [2016/40] | Type: | B1 Patent specification | No.: | EP3075197 | Date: | 08.04.2020 | Language: | EN | [2020/15] | Search report(s) | International search report - published on: | EP | 16.07.2015 | Classification | IPC: | H04W56/00, H04W16/14, // H04W28/08, H04W74/08 | [2019/46] | CPC: |
H04W56/001 (EP,CN,KR,US);
H04W16/14 (EP,KR,US);
H04W72/0446 (KR,US);
H04W72/27 (KR,US);
H04W84/042 (KR,US);
H04W88/08 (KR,US);
H04W74/0808 (EP,US)
(-)
|
| Former IPC [2016/40] | H04W56/00, H04W16/14 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/40] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUR SYNCHRONISATION IN EINEM LTE/LTE-A-SYSTEM IN UNLIZENSIERTEM SPEKTRUM | [2016/40] | English: | METHOD OF SYNCHRONIZATION WITHIN AN LTE/LTE-A SYSTEM IN UNLICENSED SPECTRUM | [2016/40] | French: | PROCÉDÉ DE SYNCHRONISATION D'UN SYSTÈME LTE/LTE-A DANS UN SPECTRE SANS LICENCE | [2016/40] | Entry into regional phase | 03.05.2016 | National basic fee paid | 03.05.2016 | Designation fee(s) paid | 03.05.2016 | Examination fee paid | Examination procedure | 03.05.2016 | Examination requested [2016/40] | 11.01.2017 | Amendment by applicant (claims and/or description) | 11.10.2018 | Despatch of a communication from the examining division (Time limit: M04) | 15.02.2019 | Reply to a communication from the examining division | 24.10.2019 | Communication of intention to grant the patent | 24.02.2020 | Fee for grant paid | 24.02.2020 | Fee for publishing/printing paid | 24.02.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 12.01.2021 | No opposition filed within time limit [2021/11] | Fees paid | Renewal fee | 03.11.2016 | Renewal fee patent year 03 | 08.11.2017 | Renewal fee patent year 04 | 08.11.2018 | Renewal fee patent year 05 | 14.11.2019 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 25.11.2014 | AL | 08.04.2020 | AT | 08.04.2020 | CY | 08.04.2020 | CZ | 08.04.2020 | DK | 08.04.2020 | EE | 08.04.2020 | ES | 08.04.2020 | FI | 08.04.2020 | HR | 08.04.2020 | IT | 08.04.2020 | LT | 08.04.2020 | LV | 08.04.2020 | MC | 08.04.2020 | MK | 08.04.2020 | MT | 08.04.2020 | NL | 08.04.2020 | PL | 08.04.2020 | RO | 08.04.2020 | RS | 08.04.2020 | SE | 08.04.2020 | SI | 08.04.2020 | SK | 08.04.2020 | SM | 08.04.2020 | TR | 08.04.2020 | BG | 08.07.2020 | NO | 08.07.2020 | GR | 09.07.2020 | IS | 08.08.2020 | PT | 17.08.2020 | IE | 25.11.2020 | LU | 25.11.2020 | BE | 30.11.2020 | CH | 30.11.2020 | LI | 30.11.2020 | [2022/33] |
| Former [2022/32] | HU | 25.11.2014 | |
| AL | 08.04.2020 | ||
| AT | 08.04.2020 | ||
| CY | 08.04.2020 | ||
| CZ | 08.04.2020 | ||
| DK | 08.04.2020 | ||
| EE | 08.04.2020 | ||
| ES | 08.04.2020 | ||
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| IT | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| MC | 08.04.2020 | ||
| MK | 08.04.2020 | ||
| MT | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| PL | 08.04.2020 | ||
| RO | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| SI | 08.04.2020 | ||
| SK | 08.04.2020 | ||
| SM | 08.04.2020 | ||
| TR | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| IE | 25.11.2020 | ||
| LU | 25.11.2020 | ||
| CH | 30.11.2020 | ||
| LI | 30.11.2020 | ||
| Former [2022/27] | HU | 25.11.2014 | |
| AL | 08.04.2020 | ||
| AT | 08.04.2020 | ||
| CY | 08.04.2020 | ||
| CZ | 08.04.2020 | ||
| DK | 08.04.2020 | ||
| EE | 08.04.2020 | ||
| ES | 08.04.2020 | ||
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| IT | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| MC | 08.04.2020 | ||
| MT | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| PL | 08.04.2020 | ||
| RO | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| SI | 08.04.2020 | ||
| SK | 08.04.2020 | ||
| SM | 08.04.2020 | ||
| TR | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| IE | 25.11.2020 | ||
| LU | 25.11.2020 | ||
| CH | 30.11.2020 | ||
| LI | 30.11.2020 | ||
| Former [2021/46] | AL | 08.04.2020 | |
| AT | 08.04.2020 | ||
| CZ | 08.04.2020 | ||
| DK | 08.04.2020 | ||
| EE | 08.04.2020 | ||
| ES | 08.04.2020 | ||
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| IT | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| MC | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| PL | 08.04.2020 | ||
| RO | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| SI | 08.04.2020 | ||
| SK | 08.04.2020 | ||
| SM | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| IE | 25.11.2020 | ||
| LU | 25.11.2020 | ||
| CH | 30.11.2020 | ||
| LI | 30.11.2020 | ||
| Former [2021/37] | AL | 08.04.2020 | |
| AT | 08.04.2020 | ||
| CZ | 08.04.2020 | ||
| DK | 08.04.2020 | ||
| EE | 08.04.2020 | ||
| ES | 08.04.2020 | ||
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| IT | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| MC | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| PL | 08.04.2020 | ||
| RO | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| SI | 08.04.2020 | ||
| SK | 08.04.2020 | ||
| SM | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| LU | 25.11.2020 | ||
| CH | 30.11.2020 | ||
| LI | 30.11.2020 | ||
| Former [2021/33] | AL | 08.04.2020 | |
| AT | 08.04.2020 | ||
| CZ | 08.04.2020 | ||
| DK | 08.04.2020 | ||
| EE | 08.04.2020 | ||
| ES | 08.04.2020 | ||
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| IT | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| MC | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| PL | 08.04.2020 | ||
| RO | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| SI | 08.04.2020 | ||
| SK | 08.04.2020 | ||
| SM | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| LU | 25.11.2020 | ||
| Former [2021/31] | AL | 08.04.2020 | |
| AT | 08.04.2020 | ||
| CZ | 08.04.2020 | ||
| DK | 08.04.2020 | ||
| EE | 08.04.2020 | ||
| ES | 08.04.2020 | ||
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| IT | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| MC | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| PL | 08.04.2020 | ||
| RO | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| SI | 08.04.2020 | ||
| SK | 08.04.2020 | ||
| SM | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2021/24] | AL | 08.04.2020 | |
| AT | 08.04.2020 | ||
| CZ | 08.04.2020 | ||
| DK | 08.04.2020 | ||
| EE | 08.04.2020 | ||
| ES | 08.04.2020 | ||
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| IT | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| PL | 08.04.2020 | ||
| RO | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| SI | 08.04.2020 | ||
| SK | 08.04.2020 | ||
| SM | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2021/10] | AL | 08.04.2020 | |
| AT | 08.04.2020 | ||
| CZ | 08.04.2020 | ||
| DK | 08.04.2020 | ||
| EE | 08.04.2020 | ||
| ES | 08.04.2020 | ||
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| IT | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| PL | 08.04.2020 | ||
| RO | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| SK | 08.04.2020 | ||
| SM | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2021/09] | AL | 08.04.2020 | |
| AT | 08.04.2020 | ||
| CZ | 08.04.2020 | ||
| DK | 08.04.2020 | ||
| EE | 08.04.2020 | ||
| ES | 08.04.2020 | ||
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| IT | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| RO | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| SM | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2021/08] | AL | 08.04.2020 | |
| DK | 08.04.2020 | ||
| ES | 08.04.2020 | ||
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| RO | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| SM | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2021/04] | AL | 08.04.2020 | |
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2021/01] | FI | 08.04.2020 | |
| HR | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2020/51] | FI | 08.04.2020 | |
| HR | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2020/50] | FI | 08.04.2020 | |
| HR | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2020/48] | FI | 08.04.2020 | |
| LT | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| NO | 08.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2020/47] | LT | 08.04.2020 | |
| NO | 08.07.2020 | ||
| IS | 08.08.2020 | ||
| Former [2020/46] | IS | 08.08.2020 | Cited in | International search | [IA] US2010260168 (GHEORGHIU VALENTIN A et al.) | [IA] WO2005025135 (INFINEON TECHNOLOGIES AG et al.) [I] 1,4,7-9,12,15,16 * figure 1 * * paragraph [0022] * * paragraph [0032] *[A] 2,3,5,6,10,11,13,14 | [IA] US2003016647 (MARGON KENNETH et al.) [A] 2,3,5,6,10,11,13,14 | [IA] 3GPP: "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); TDD Home eNode B (HeNB) Radio Frequency (RF) requirements analysis", 1 June 2010 (2010-06-01), XP055170278, Retrieved from the Internet | by applicant | 3RD GENERATION PARTNERSHIP PROJECT'' (3GPP | 3RD GENERATION PARTNERSHIP PROJECT 2'' (3GPP2 |