blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2894954

EP2894954 - HEAT DISSIPATION HOUSING STRUCTURE CONNECTED TO HEAT DISSIPATION FIN [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  17.06.2022
Database last updated on 05.08.2024
FormerThe patent has been granted
Status updated on  09.07.2021
FormerGrant of patent is intended
Status updated on  13.04.2021
FormerExamination is in progress
Status updated on  22.09.2017
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Marchesi Metal Technology (Suzhou) Co., Ltd
No. 39 Fangda Street
Suzhou Industrial Park
Suzhou
Jiangsu 215000 / CN
[2015/29]
Inventor(s)01 / CHEN, Weiguo
No.39 Fangda Street
Suzhou Industrial Park
Suzhou Jiangsu 215000 / CN
02 / CAMPIDELLI, Veronica
MARCHESI METAL TECHNOLOGY
(SUZHOU) CO LTD
No39 Fangda Street
Suzhou Industrial Park Suzhou
Jiangsu 215000 / CN
 [2016/50]
Former [2015/30]01 / CHEN, Weiguo
No.39 Fangda Street
Suzhou Industrial Park
Suzhou Jiangsu 215000 / CN
02 / CAMPIDELLI, Veronica
No.39 Fangda Street
Suzhou Industrial Park
Suzhou Jiangsu 215000 / CN
Former [2015/29]01 / CHEN, Weiguo
No. 39 Fangda Street
Suzhou Industrial Park
Suzhou Jiangsu 215000 / CN
02 / KANG, Weiru
No. 39 Fangda Street
Suzhou Industrial Park
Suzhou Jiangsu 215000 / CN
Representative(s)Loyer & Abello
9, rue Anatole de la Forge
75017 Paris / FR
[2015/29]
Application number, filing date14811749.202.12.2014
[2021/32]
WO2014CN92766
Priority number, dateCN20131064940006.12.2013         Original published format: CN201310649400
CN20131064940306.12.2013         Original published format: CN201310649403
CN20131064940406.12.2013         Original published format: CN201310649404
CN20131064940506.12.2013         Original published format: CN201310649405
CN2014108719911.03.2014         Original published format: CN201410087199
[2015/29]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015081842
Date:11.06.2015
Language:ZH
[2015/23]
Type: A1 Application with search report 
No.:EP2894954
Date:15.07.2015
Language:EN
[2015/29]
Type: B1 Patent specification 
No.:EP2894954
Date:11.08.2021
Language:EN
[2021/32]
Search report(s)International search report - published on:CN11.06.2015
(Supplementary) European search report - dispatched on:EP13.05.2016
ClassificationIPC:H05K7/20, H01L23/367, H01L21/48
[2016/24]
CPC:
H01L23/3672 (EP,KR,US); H01L21/4882 (EP,KR,US); F28F3/02 (US);
H01L21/67098 (KR); H01L23/3675 (EP,US); H01L23/4093 (KR);
H05K1/0203 (US); H01L2924/0002 (EP,KR,US) (-)
C-Set:
H01L2924/0002, H01L2924/00 (EP,US)
Former IPC [2015/29]H05K7/20
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/49]
Former [2015/29]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
Extension statesBANot yet paid
MENot yet paid
TitleGerman:WÄRMEABLEITENDES GEHÄUSE MIT INTEGRIERTEN KÜHLRIPPEN[2015/29]
English:HEAT DISSIPATION HOUSING STRUCTURE CONNECTED TO HEAT DISSIPATION FIN[2015/29]
French:STRUCTURE DE BOÎTIER À DISSIPATION DE CHALEUR CONNECTÉE À DES AILETTES DE DISSIPATION DE CHALEUR[2015/29]
Entry into regional phase19.12.2014Translation filed 
19.12.2014National basic fee paid 
19.12.2014Search fee paid 
Examination procedure23.10.2015Examination requested  [2015/49]
25.11.2016Amendment by applicant (claims and/or description)
20.09.2017Despatch of a communication from the examining division (Time limit: M04)
18.01.2018Reply to a communication from the examining division
20.04.2020Despatch of a communication from the examining division (Time limit: M04)
03.08.2020Reply to a communication from the examining division
14.04.2021Communication of intention to grant the patent
30.06.2021Fee for grant paid
30.06.2021Fee for publishing/printing paid
30.06.2021Receipt of the translation of the claim(s)
Opposition(s)12.05.2022No opposition filed within time limit [2022/29]
Fees paidRenewal fee
30.11.2016Renewal fee patent year 03
29.11.2017Renewal fee patent year 04
29.11.2018Renewal fee patent year 05
29.11.2019Renewal fee patent year 06
26.11.2020Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU02.12.2014
AL11.08.2021
AT11.08.2021
CY11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
MK11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
TR11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
GB02.12.2021
IE02.12.2021
LU02.12.2021
IS11.12.2021
PT13.12.2021
BE31.12.2021
CH31.12.2021
FR31.12.2021
LI31.12.2021
[2024/29]
Former [2024/22]HU02.12.2014
AL11.08.2021
AT11.08.2021
CY11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
MK11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
GB02.12.2021
IE02.12.2021
LU02.12.2021
IS11.12.2021
PT13.12.2021
BE31.12.2021
CH31.12.2021
FR31.12.2021
LI31.12.2021
Former [2023/30]HU02.12.2014
AL11.08.2021
AT11.08.2021
CY11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
GB02.12.2021
IE02.12.2021
LU02.12.2021
IS11.12.2021
PT13.12.2021
BE31.12.2021
CH31.12.2021
FR31.12.2021
LI31.12.2021
Former [2023/29]HU02.12.2014
AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
GB02.12.2021
IE02.12.2021
LU02.12.2021
IS11.12.2021
PT13.12.2021
BE31.12.2021
CH31.12.2021
FR31.12.2021
LI31.12.2021
Former [2023/03]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
GB02.12.2021
IE02.12.2021
LU02.12.2021
IS11.12.2021
PT13.12.2021
BE31.12.2021
CH31.12.2021
FR31.12.2021
LI31.12.2021
Former [2023/01]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
GB02.12.2021
IE02.12.2021
LU02.12.2021
IS11.12.2021
PT13.12.2021
BE31.12.2021
FR31.12.2021
Former [2022/48]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
GB02.12.2021
IE02.12.2021
LU02.12.2021
IS11.12.2021
PT13.12.2021
Former [2022/47]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
GB02.12.2021
LU02.12.2021
IS11.12.2021
PT13.12.2021
Former [2022/46]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
LU02.12.2021
IS11.12.2021
PT13.12.2021
Former [2022/36]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/33]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/29]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/26]AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/24]AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SK11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/21]AT11.08.2021
DK11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RS11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/16]AT11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RS11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/10]AT11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
PL11.08.2021
RS11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/09]AT11.08.2021
ES11.08.2021
FI11.08.2021
LT11.08.2021
RS11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
PT13.12.2021
Former [2022/08]AT11.08.2021
ES11.08.2021
FI11.08.2021
LT11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
Former [2022/07]AT11.08.2021
LT11.08.2021
NO11.11.2021
Documents cited:Search[A]JPH1131771  (RIYOOSAN KK) [A] 1-24 * abstract * * figure - *;
 [A]US2009194255  (HUANG TSUNG-HSIEN [TW]) [A] 7 * figures 7-11 ** paragraph [0029] *;
 [XY]TWM441308U  (COOLER MASTER CO LTD [TW]) [X] 1-15,19-21,23 * abstract * * figure - * [Y] 16-18,22,24;
 [XY]US2013153192  (LIN CHIA-YU [TW]) [X] 1-4,8-14,19,21 * figure - * * paragraph [0028] - paragraph [0036] * [Y] 5-7,15-18,20,22-24;
 [XY]EP2618092  (COOLER MASTER CO LTD [TW]) [X] 1-4,8-14,19,21 * figure - * * paragraph [0009] - paragraph [0017] * [Y] 5-7,15-18,20,22-24;
 [XA]EP2620239  (COOLER MASTER CO LTD [TW]) [X] 1-4,8,13,14,19-21 * figure - * * paragraph [0009] - paragraph [0014] * [A] 5-7,9-12,15-18,22-24;
 [A]US2013233528  (YANG CHUN-WEI [CN], et al) [A] 1-24 * figure - * * paragraph [0014] - paragraph [0015] *;
 [XY]US2013255927  (LIN CHIA-YU [TW], et al) [X] 1-4,8-14,19,21 * figure - * * paragraph [0027] - paragraph [0046] * [Y] 5-7,15-18,20,22-24
International search[Y]CN2527069Y  (XIWANG ELECTRONIC INST CHENGDU [CN]);
 [X]CN1407671  (DEYI PREC ELECT IND CO LTD [CN]);
 [A]CN201383751Y  (TIANJIN RUIXIN ELECTRON HEAT EXCHANGE TECHNOLOGY CO LTD);
 [XP]CN103607872  (MARCHESI METAL TECH SUZHOU CO LTD);
 [XP]CN103607873  (MARCHESI METAL TECH SUZHOU CO LTD);
 [XP]CN103619142  (MARCHESI METAL TECHNOLOGY SUZHOU CO LTD);
 [XP]CN103619143  (MARCHESI METAL TECHNOLOGY SUZHOU CO LTD);
 [XP]CN103796457  (MARCHESI METAL TECHNOLOGY SUZHOU CO LTD);
 [XP]CN203633047U  (MARCHESI METAL TECH SUZHOU CO LTD);
 [XP]CN203633007U  (MARCHESI METAL TECH SUZHOU CO LTD);
 [XP]CN203633005U  (MARCHESI METAL TECH SUZHOU CO LTD);
 [XP]CN203633006U  (MARCHESI METAL TECH SUZHOU CO LTD);
 [XP]CN203748135U  (MARCHESI METAL TECHNOLOGY SUZHOU CO LTD)
ExaminationUS6085830
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.