EP3077180 - PROCESS FOR THE ACCELERATED PRODUCTION OF OBJECTS BY MEANS OF GENERATIVE MANUFACTURING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.06.2022 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 02.07.2021 | ||
Former | Grant of patent is intended Status updated on 24.03.2021 | ||
Former | Examination is in progress Status updated on 26.02.2021 | ||
Former | Grant of patent is intended Status updated on 29.10.2020 | ||
Former | Examination is in progress Status updated on 30.11.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states EOS GmbH Electro Optical Systems Robert-Stirling-Ring 1 82152 Krailling / DE | [2016/41] | Inventor(s) | 01 /
PATERNOSTER, Stefan Pähler-Hart-Str. 2 82346 Andechs / DE | [2016/41] | Representative(s) | Prüfer & Partner mbB Patentanwälte · Rechtsanwälte Sohnckestraße 12 81479 München / DE | [2016/41] | Application number, filing date | 14811793.0 | 01.12.2014 | [2016/41] | WO2014EP76150 | Priority number, date | DE201310224693 | 02.12.2013 Original published format: DE102013224693 | [2016/41] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2015082423 | Date: | 11.06.2015 | Language: | DE | [2015/23] | Type: | A1 Application with search report | No.: | EP3077180 | Date: | 12.10.2016 | Language: | DE | The application published by WIPO in one of the EPO official languages on 11.06.2015 takes the place of the publication of the European patent application. | [2016/41] | Type: | B1 Patent specification | No.: | EP3077180 | Date: | 04.08.2021 | Language: | DE | [2021/31] | Search report(s) | International search report - published on: | EP | 11.06.2015 | Classification | IPC: | B29C64/153, B29C64/40, B29C64/393, B33Y10/00, B33Y30/00, B33Y50/02 | [2020/46] | CPC: |
B29C64/153 (EP,US);
B22F10/00 (US);
B22F10/28 (EP,US);
B22F10/36 (EP,US);
B22F12/13 (EP,US);
B28B1/001 (US);
B28B17/0081 (US);
B29C64/393 (EP);
B29C64/40 (EP,US);
B33Y10/00 (EP,US);
B33Y30/00 (EP,US);
B33Y50/02 (EP,US);
|
Former IPC [2016/41] | B29C67/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/41] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUR BESCHLEUNIGTEN HERSTELLUNG VON OBJEKTEN MITTELS GENERATIVER FERTIGUNG | [2016/41] | English: | PROCESS FOR THE ACCELERATED PRODUCTION OF OBJECTS BY MEANS OF GENERATIVE MANUFACTURING | [2016/41] | French: | PROCÉDÉ DE PRODUCTION ACCÉLÉRÉE D'OBJETS PAR FABRICATION GÉNÉRATIVE | [2016/41] | Entry into regional phase | 01.07.2016 | National basic fee paid | 01.07.2016 | Designation fee(s) paid | 01.07.2016 | Examination fee paid | Examination procedure | 01.07.2016 | Examination requested [2016/41] | 30.11.2016 | Amendment by applicant (claims and/or description) | 29.11.2018 | Despatch of a communication from the examining division (Time limit: M04) | 26.02.2019 | Reply to a communication from the examining division | 16.12.2019 | Despatch of a communication from the examining division (Time limit: M04) | 24.03.2020 | Reply to a communication from the examining division | 30.10.2020 | Communication of intention to grant the patent | 26.02.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 25.03.2021 | Communication of intention to grant the patent | 23.06.2021 | Fee for grant paid | 23.06.2021 | Fee for publishing/printing paid | 23.06.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 06.05.2022 | No opposition filed within time limit [2022/28] | Fees paid | Renewal fee | 23.12.2016 | Renewal fee patent year 03 | 21.12.2017 | Renewal fee patent year 04 | 19.12.2018 | Renewal fee patent year 05 | 23.12.2019 | Renewal fee patent year 06 | 24.12.2020 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 01.12.2014 | AL | 04.08.2021 | CY | 04.08.2021 | CZ | 04.08.2021 | DK | 04.08.2021 | EE | 04.08.2021 | ES | 04.08.2021 | FI | 04.08.2021 | HR | 04.08.2021 | LT | 04.08.2021 | LV | 04.08.2021 | MC | 04.08.2021 | MK | 04.08.2021 | PL | 04.08.2021 | RO | 04.08.2021 | RS | 04.08.2021 | SE | 04.08.2021 | SI | 04.08.2021 | SK | 04.08.2021 | SM | 04.08.2021 | TR | 04.08.2021 | BG | 04.11.2021 | NO | 04.11.2021 | GR | 05.11.2021 | AT | 01.12.2021 | IE | 01.12.2021 | LU | 01.12.2021 | IS | 04.12.2021 | PT | 06.12.2021 | BE | 31.12.2021 | CH | 31.12.2021 | LI | 31.12.2021 | [2024/29] |
Former [2024/22] | HU | 01.12.2014 | |
AL | 04.08.2021 | ||
CY | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
MK | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
AT | 01.12.2021 | ||
IE | 01.12.2021 | ||
LU | 01.12.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/30] | HU | 01.12.2014 | |
AL | 04.08.2021 | ||
CY | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
AT | 01.12.2021 | ||
IE | 01.12.2021 | ||
LU | 01.12.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/29] | HU | 01.12.2014 | |
AL | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
AT | 01.12.2021 | ||
IE | 01.12.2021 | ||
LU | 01.12.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/22] | AL | 04.08.2021 | |
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
AT | 01.12.2021 | ||
IE | 01.12.2021 | ||
LU | 01.12.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/03] | AL | 04.08.2021 | |
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IE | 01.12.2021 | ||
LU | 01.12.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/01] | AL | 04.08.2021 | |
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IE | 01.12.2021 | ||
LU | 01.12.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
BE | 31.12.2021 | ||
Former [2022/48] | AL | 04.08.2021 | |
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IE | 01.12.2021 | ||
LU | 01.12.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/46] | AL | 04.08.2021 | |
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
LU | 01.12.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/36] | AL | 04.08.2021 | |
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/33] | AL | 04.08.2021 | |
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/29] | AL | 04.08.2021 | |
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/26] | CZ | 04.08.2021 | |
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/24] | CZ | 04.08.2021 | |
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SK | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/21] | DK | 04.08.2021 | |
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
PL | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/10] | ES | 04.08.2021 | |
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
PL | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/09] | ES | 04.08.2021 | |
FI | 04.08.2021 | ||
LT | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
PT | 06.12.2021 | ||
Former [2022/08] | ES | 04.08.2021 | |
FI | 04.08.2021 | ||
LT | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
Former [2022/07] | LT | 04.08.2021 | |
NO | 04.11.2021 | Cited in | International search | [XYI]FR2878771 (3D SYSTEMS INC [US]) [X] 1,2,4-6,8 * figure 2 * * page 1, lines 1-3 * * page 2, lines 9-19 * * page 5, lines 14-17 * * page 6, lines 3-5 * * page 8, lines 4-5, 19-23 * * page 11, lines 3-12 * * page 16, lines 1-22 * * pages 19-24 * * page 25; table 3 * [Y] 7,9 [I] 3; | [Y]US2007196561 (PHILIPPI JOCHEN [DE], et al) [Y] 9* page 3, paragraph [0042] *; | [Y]WO2012102655 (ARCAM AB [SE], et al) [Y] 7 * page 5, lines 27-31 * |