blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3074501

EP3074501 - ENERGY HARVESTING SYSTEM FOR HARVESTING RENEWABLE ENERGY, BIOMASS COLLECTING SYSTEM, AND COMPONENTS OF SAID SYSTEMS [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  19.07.2024
Database last updated on 03.10.2024
FormerRequest for examination was made
Status updated on  05.03.2024
Most recent event   Tooltip19.07.2024Application deemed to be withdrawnpublished on 21.08.2024  [2024/34]
Applicant(s)For all designated states
Gallersdörfer, Peter
Konradshöhe 33
92637 Weiden / DE
[2016/40]
Inventor(s)01 / see applicant
...
 [2016/40]
Representative(s)(deleted)
[N/P]
Former [2016/40]Lang, Christian
LangPatent Anwaltskanzlei
IP Law Firm
Rosenheimer Straße 139
81671 München / DE
Application number, filing date14818897.228.11.2014
[2016/40]
WO2014EP76018
Priority number, dateDE20131011320728.11.2013         Original published format: DE102013113207
DE20141011475310.10.2014         Original published format: DE102014114753
[2016/40]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2015079047
Date:04.06.2015
Language:DE
[2015/22]
Type: A1 Application with search report 
No.:EP3074501
Date:05.10.2016
Language:DE
The application published by WIPO in one of the EPO official languages on 04.06.2015 takes the place of the publication of the European patent application.
[2016/40]
Search report(s)International search report - published on:EP04.06.2015
ClassificationIPC:C12M1/107, C12M1/00, C12M3/00, C12M1/09, C12M1/33
[2016/40]
CPC:
C12M21/04 (EP); C12M23/30 (EP); C12M23/44 (EP);
C12M23/52 (EP); C12M23/56 (EP); C12M43/04 (EP);
C12M43/08 (EP); C12M45/02 (EP); C12M45/22 (EP);
C12M47/14 (EP); Y02E50/30 (EP); Y02P20/59 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/40]
TitleGerman:ENERGIEGEWINNUNGSSYSTEM ZUR GEWINNUNG ERNEUERBARER ENERGIE SOWIE BIOMASSESAMMELSYSTEM UND KOMPONENTEN DIESER SYSTEME[2016/40]
English:ENERGY HARVESTING SYSTEM FOR HARVESTING RENEWABLE ENERGY, BIOMASS COLLECTING SYSTEM, AND COMPONENTS OF SAID SYSTEMS[2016/40]
French:SYSTÈME DE PRODUCTION D'ÉNERGIE POUR LA PRODUCTION D'ÉNERGIE RENOUVELABLE AINSI QUE SYSTÈME COLLECTEUR DE BIOMASSE ET COMPOSANTS DE CES SYSTÈMES[2016/40]
Entry into regional phase28.06.2016National basic fee paid 
28.06.2016Designation fee(s) paid 
28.06.2016Examination fee paid 
Examination procedure28.06.2016Examination requested  [2016/40]
18.01.2017Amendment by applicant (claims and/or description)
10.02.2024Application deemed to be withdrawn, date of legal effect  [2024/34]
24.04.2024Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time  [2024/34]
Public notification(s)Feststellung eines Rechtsverlusts nach Regel 112(1) EPÜ (EPA Form 2524 vom 04/03/2024)
Gallersdörfer, Peter
Konradshöhe 33
92637 Weiden / DE
[2024/17]
Fees paidRenewal fee
25.11.2016Renewal fee patent year 03
17.05.2018Renewal fee patent year 04
02.05.2019Renewal fee patent year 05
Penalty fee
Additional fee for renewal fee
30.11.201704   M06   Fee paid on   17.05.2018
30.11.201805   M06   Fee paid on   02.05.2019
30.11.201906   M06   Not yet paid
01.12.202307   M06   Not yet paid
01.12.202308   M06   Not yet paid
01.12.202309   M06   Not yet paid
01.12.202310   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Stay/Interruption23.03.2020Interruption of proceedings. Reason: applicant has died[2020/20]
01.12.2023Resumption of proceedings[2023/26]
23.03.2020Interruption of proceedings. Reason: applicant has died[2023/26]
Cited inInternational search[A]DE3835230  (HOLSTEINER GAS GMBH [DE]) [A] 1,10,15,19,20 * column 1, line 65 - column 2, line 35 * * column 3, lines 27-39 *;
 [A]DE4126703  (TRAMM-WERNER, SABINE; DE) [A] 1,10,15,19,20 * column 1 - column 2 *;
 [X]DE19857870  (RES & DEV OF RENEWABLE ENERGY [IE]) [X] 1,10,15,19 * column 1 - column 3 * * columns 5,7,8 * * figure - *;
 [X]DE10021383  (WEA WASTE ENERGY ACTION INTERN [IE]) [X] 1,10,15,19 * paragraphs [0001] , [0009] , [0011] , [0016] , [0023] , [0027] , [0034] , [0051] * * figure 1 *;
 [Y]DE102004010539  (EVS EN VERSORGUNGS SERVICE [DE]) [Y] 1-20 * paragraphs [0001] , [0008] , [0011] - [0020] - [0031] , [0032] *;
 [Y]WO2009101393  (PARRY JULIAN [GB]) [Y] 1-20 * pages 6,9-11 * * figures 1,4,5,7A; claim - *;
 [A]WO2010100224  (ECOCITY PROJECT GMBH [DE], et al) [A] 1,10,15,19,20* page 2 - page 3; figure 1 *;
 [Y]DE102009018126  (ZSW [DE]) [Y] 1-20 * paragraphs [0001] , [0005] , [0013] , [0016] * * figures 1,2 *;
 [A]DE102009032122  (BOSCH GMBH ROBERT [DE]) [A] 1,10,15,19,20 * paragraphs [0002] , [0024] , [0033] , [0035] , [0037] , [0038] , [0041] , [0044] *;
 [A]DE102011114171  (THYSSENKRUPP UHDE GMBH [DE]) [A] 1,10,15,19,20 * paragraph [0001]; figure 1 *;
 [A]DE102012010542  (CCP TECHNOLOGY GMBH [DE]) [A] 1,10,15,19,20 * paragraphs [0009] - [0025]; figure - *;
 [A]DE102012203148  (WERNER HANS [DE]) [A] 1,10,15,19,20 * paragraphs [0001] , [0002] , [0005] , [0006] , [0010] , [0020] , [0021] , [0030] , [0040] *;
 [A]DE102012103458  (HELMHOLTZ ZENTRUM POTSDAM DEUTSCHES GEOFORSCHUNGSZENTRUM GFZ STIFTUNG DES OEFFENTLICHEN RECHTS DES L [DE]) [A] 1,10,15,19,20 * paragraph [0012] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.